Professional Documents
Culture Documents
2HT - 823 - 198 30-09-22
2HT - 823 - 198 30-09-22
2HT - 823 - 198 30-09-22
Customer:AML
Part No:2HT_823_198
DIE NO:SD8220497
Date:2022.09.22
www.vision-tool.com.cn
1.Confirmation of mismatches position接刀口位置确认
A13 请确认能够在较大的部分进行孔切
割,请确认
A3 强度不足
A17 A12 Insufficient
A19 A18 strength
A21 A20
A22
A4 A11 Trimming in different
processes is beneficial
A23 A24 to the strength of the
A10 die, Our designer
A25
A26
suggest to keep the
A5 接刀口样式
Mismatch
status.
shape 分工序修边有利于模具强
A9
度,建议保持现状
A27 A28
A6 A8
A7
强度不足
Insufficient
1.Please confirm the mismatches position from A1 to A28 are OK or not.
strength
1.请确认接刀口位置(A1-A28)
2. Confirmation of drop scrap 掉废料方式掉废料角度与用震动器确认
20°
The height of OP20-60TC is changed to 500, and the scrap angle can be 20°. The scrap chute
+ vibrator is used to automatically drop the scrap before and after OP30/40. There are four
MISUMI vibrators, MRE50. Please confirm whether it is possible?
2.OP20-60TC高度改为500,废料角度可做到20度,OP30/40前后用废料滑槽+震动器自动掉废料,用
MISUMI震动器型号MRE50四个,请确认是否可以?