1254 Revised BOQ
1254 Revised BOQ
ELEMENT NO.1
Excavations
F Load and cart away excavated materials from site 15 CM 450 6,750.00
BW/1
BUNGALOW
SUBSTRUCTURES-(CONTINUED)
E No. A 142 fabric weighing 2.22Kg/sm fixed in bed 150 SM 300 45,000.00
BW/2
BUNGALOW
SUBSTRUCTURES-(CONTINUED)
Plinths
B 12mm thick cement and sand (1:3) render to plinths 22 SM 200 4,400.00
COLLECTION
BW/3
BUNGALOW
BW/4
BUNGALOW
WALLING
Permanent ventilation
F Eave filling to 200mm thick wall extreme height 300mm 44 LM 250 11,000.00
BW/5
BUNGALOW
ROOFING
BW/6
BUNGALOW
Eaves
Fascia Board
Gutters
Downpipe
BW/7
BUNGALOW
Knot, stain prepare and apply three coats oil gloss paint to:
COLLECTION
BW/8
BUNGALOW
ELEMENT NO.5
DOORS
Mild steel doors
A 900 x 2400mm high mild steel pannel door comprising of 6
No. Size 300 x 800mm high and 3No. Size 300 x 450mm high
10mm thick glass panels including 900 x 200mm and 900 x
300mm high double plates complete with 100 x 50 x 3mm
RHS framing and metal lugs including purpose made hanging
and locking accessories once primed with red oxide primer
before delivery to the site including three lever mortice lock
as per 'Union' Ref 2277 or other equal and approved
manufacturer 1 NO 20000 20,000.00
C 45mm thick semi Solid core flush door faced both sides with
6 mm interior quality plywood ready for painting and
hardwood lipped all round size 900 x 2400mm high 5 NO 6500 32,500.00
J 3 Lever mortice lock and set furniture Ref.Union 2295. 5 NO. 2500 12,500.00
K 2 Lever mortice lock and set furniture Ref.Union 2295. 2 NO. 1800 3,600.00
BW/9
BUNGALOW
DOORS - (CONTINUED)
Painting
Knot, prime, prepare and apply three coats gloss oil paint
to:
BW/10
BUNGALOW
COLLECTION
BW/11
BUNGALOW
ELEMENT NO.6
WINDOWS
Glazing
Sills
G 125x20mm Thick clay tile sill with one curved edge including
18 LM 200 3,600.00
bedding and pointing in cement and sand (1:3) mortar
Curtain Rod
BW/12
BUNGALOW
COLLECTION
BW/13
BUNGALOW
ELEMENT NO. 7
EXTERNAL FINISHINGS
Walls
BW/14
BUNGALOW
ELEMENT NO. 8
INTERNAL FINISHES
FLOORS
A 32mm thick screed prepared to receive non-slip ceramic tiles 150 SM 300 45,000.00
BW/15
BUNGALOW
Ceiling
C 12mm thick gypsum ceiling nailed to timber brandering (m/s) 150 SM 1600 240,000.00
D 100 x 25mm Thick wrot softwood moulded cornice 154 LM 200 30,800.00
Walls
BW/16
BUNGALOW
COLLECTION
BW/17
BUNGALOW
SECTION SUMMARY
A SUBSTRUCTURES…………………………………………………..
MH/3 485,690.00
B RC. SUPERSTRUCTURES…………………………………………………..
MH/4 181,500.00
D ROOFING……………………………………………………….MH/8 954,900.00
E DOORS…………………………………………………………..MH/11 123,860.00
F WINDOWS……………………………………………………….
MH/13 202,730.00
G EXTERNAL FINISHES…………………………………………….
MH/14 36,600.00
H INTERNAL FINISHES……………………………………………..
MH/17 1,017,800.00
BW/18
BUNGALOW
Electrical Works
A Allow Prime Cost Sum of Ksh Two Hundred and Fifty Thousand
ITEM
(250,000.00) only for Electrical Installation Works 250,000.00
Mechanical Works
B Allow Prime Cost Sum of Ksh Two Hundred Thousand (200,000.00) only
ITEM
for Water storage, Drainage and Plumbing Works 200,000.00
C Allow Prime Cost Sum of Ksh Two Hundred and Fifty Thousand
(250,000.00) only for fittings and fixtures Works 250,000.00
Bio-digester
PC/1
BUNGALOW
ESTISMATED COST.
Kenya Shillings Four Million,One Hundred and Sixty Eight Thousand, Five
Hundred And Eighty Only.