Design Spreadsheet Calculation For SBR Sequential Biological Reactor
Design Spreadsheet Calculation For SBR Sequential Biological Reactor
Objective: TO CALCULATE THE SBR TANK CAPCITY, OPERATING TIME, OXYGEN NEEDED FOR BOD AND NITROGEN REMOVAL
REFERENCE : METCALF & EDDY
8. SBR TANK % m3
Decant % = Fill% Vfill = Vdecant .= 0.30 16.88
VS/VT % .= Vsettle = MLSS*SVI /10^6 .= 0.30 16.88
Supernatant % .= Vsup .= 0.40 22.50
Total Reactor Volume .= Vsbr .= 1.00 56.25
VT/ #Tank proposed .= 56.25 m3
8.1 SBR TANK DIMENSION .= Area .= 16.07 m2
Volume SBR 56.25 29.0%
.= L .= 4.41 m
.= W .= 3.64 m
.= D .= 3.50 m
9. Develop Input data to solve the above relationship for SRT
TABLE 8-14 Coefficient Suggested
umax .= gVSS/gVSS d .= 0.90
Valueθ Temp Corrected Umaxcor
1.07 28 0.9 g/g.d x 1.072 ^TD 1.569642656
Ks KNH3 KNO3 .= Half- Velocity coeff, mg/l .= 0.50 Ks COD
YH .= gVSS/gCOD for H .= 0.45 bH
YN .= gVSS/gsubstrate oxidized .= 0.15 SRT
bn .= gVSS/g VSS.d .= 0.12
Valueθ Temp Corrected Umaxcor
1.03 28 0.12 g/g.d x 1.029 ^TD 0.150835735 umax
fd .= g/g .= 0.15
Kd .= mg/l .= 0.50
Ks kd /(umax-kd) .= Smin= .= 0.625
bCOD/BOD .= 1.6 to 1.7 .= 1.70
10. NITRIFIER ENDOGENOUS DECAY bn is higher during aeration and reduced during anoxic
Temp. Diff .= Tsite- T20 .= 8.00 C
bn28C,(aerobic) .= 0.17g/g*d * 1.029^T-20 .= 0.21 g/g.d
% aerobic Time .= Ta/Tc .= 0.26
bn Aero .= bn Aerobic x % Taero .= 0.06 g/g.d
bn28C,(anoxic) .= 0.07g/g*d * 1.029^T-20 .= 0.09 g/g*d
% anoxic Time .= 1-% Ta/TC .= 0.74
bn Ano .= + bn Anoxic x % Tano .= 0.06 g/g*d
bn, average .= bnAe*%Tae +bnAno*%Tano .= 0.12 g/g.d
b12C , (bH) .= 0.12g/g*d * 1.04 ^TD .= 0.16 g/g.d
Rule of thumb, SRT>7days need 5gN and 1gPhosporous need 100g BOD to produce excess Nutrients
MLSS * PxTSS*SRT / VT .= 2,500.00 mg/l
MLVSS * PxVSS*SRT / VT 2,141.84 mg/l
FRACTION OF MLVSS * .= 0.86 mg/l
16 Nitrification
NH4-N oxidized to NOx or Nitrate. * In= Out +Oxidized
Nsynthesis .= 0.12gN /g B.mass* Pxbio /Q .= 6.91 g/m3
.= Pxbiomass Full .= 2.91 kg/day
.= TKN .= 42.53 g/m3
.= NH4 eff .= 0.50 g/m3
NOx Produced .= TKN - Ne - 0.12 PxBIO /Q .= 35.12 g/m3
83%
17. Anoxic Reaction Time
Px Bio first stage 2.91 kg/day
Xb .= Pxbiomass xSRT/VT .= 1,752.15 g/m3 at full volume
Biomass in Tank .= Xb*VT .= 98.56 mg
SDNR
NOX Nitrate Removal Rate in anoxic reaction time .= SDNR *Xb*VT .= 27,272.95 g/day
Fill time .= .= 3.00 hr
NOX Removal, g .= NOX *Fill Time/24 .= 3,409.12 Nitrififying rate
Nitrate Removal in g/day Nox Q .= 1,778.06 g/day
Anoxic time NO3 removal* Cycle Time .= 0.52 hr
24hrs/cycle .= 8.00 hr
19 Nitrate NO3 remains in SBR after decant ( Assume no Denitrification during settling and decant)
Check NO3-N Removal during Fill Period Pre Anoxic Denitrification
Pxvss .= Hetero +Cell Debris .= 96.84 kg
Daily Wasting Pxvss/SRT .= 2.86 kg/day
Nsynthesis .= 0.12 gN/gVSS*Pxbio/Q .= 6.79 g/m3
NOX produced .= TKN - Ne - Nsyn .= 35.24 g/m3
27. Phosporous Removal (Note High Nitrate and Low VFA Acid not good for P removal)
VFA /rbCOD = 0.20
P sysnthesis .= 0.015 Pxbio = 43.70
Normalized Q P removal .= Psynthesis / Q = 0.86
Effluent P .= Influent P - PEff -P syn = 3.65
rbCOD = 314.53
rbCOD/P = 15.00 g/d
Premoval .= rbCOD / rbCOD/P = 20.97
VF /cycle .= 16.88 m3
Fill level .= 1.05 m
Decant depth .= 1.05 m
VF/ VT Fraction .= 0.30 Ratio