MATERIAL & LABOUR ESTIMATES to reinforce two(2)

CONCRETE PILLARS at Mabrouk Central Mosque Project


site Date as at 10/04/2023

Unit
Item
Description Price Quantity
No.
(GHc)
MATERIAL
1 Cement 42.5 R 105 10
2 Iron rod 16mm 130 5
3 Iron rod 12mm 65 6
4 Iron rod 10mm 50 6
5 Binding wire (1 roll) 80 1
6 Transportation (iron rods ) 100 1
7 Transportation ( Cement) 60 1
subTotal

LABOUR
8 Steel works (on contract) 200 1
9 Supervision 150 1
10 Casting of pillars (2 lot) 700 1
subTotal

HIRING SERVICES
Concrete mould 2 set- 10ft (cost of 1 pillar was owed by 200 2
11 the project)
12 Transportation 100 1
subTotal

FINAL ACCOUNT
13 Total Estimates
Amount(
GHc)

1050
650
390
300
80
100
60
2630

200
150
700
1050

400
100
500

4180