Professional Documents
Culture Documents
07 Introduction To Hydraulic Fracturing
07 Introduction To Hydraulic Fracturing
7. Introduction SiteFracturing
Hydraulic Supervisors
Module – 13
Work Over Operations
Section – 7
Introduction to
Hydraulic Fracturing
C. Alvarez
7. Introduction to Hydraulic Fracturing
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Damage
The fracture will extend through the damaged near wellbore area.
The fracture size is limited to two criteria :
Drainage Radius
Cost
Fracturing is : Pumping fluid into the formation above fracture pressure.
3 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Modify flow regime deep within the formation (tens to hundreds of feet)
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Primary Purpose :
To increase the effective wellbore area by creating a fracture of length XL
whose conductivity is greater than that of the formation.
Two Methods :
Sand Frac
Acid Frac
5 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
kfw
CfD = k xf
rw' / xf
6 PA
04/25/2006 CfD
C. Alvarez
7. Introduction to Hydraulic Fracturing
Hydraulic Fracture
Modification of reservoir flow
C. Alvarez
7. Introduction to Hydraulic Fracturing
Hydraulic Fracture
Acid and Propped Fracturing
C. Alvarez
7. Introduction to Hydraulic Fracturing
9 PA
04/25/2006
C. Alvarez
7. Introduction to Hydraulic Fracturing
Advantages of Hydraulic Fracturing
Connecting Lenticular Reservoirs Naturally Fissured Systems
Orthogonal Fissures
Pay stimulated by
a fracture treatment Pressure
Reduction in formation
sand production
Distance
10 PA Pay stimulated by
04/25/2006
an acid treatment
C. Alvarez
7. Introduction to Hydraulic Fracturing
Hydraulic Fracturing
Harsh Fracturing Environments
• Very high permeability ( 1-2 Darcy )
- Exceptionally high poroelastic effects
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Hydraulic Fracturing
Typical Formations
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
1.00
• Low Permeability
xf
r'w =
Low Permeability
xf limited
2
r w' / x f
0.10
High Permeability
• High Permeability kf w limited
kf w
r' w = 0.28 0.01
k 0.1 1 10
FCD
100 1000
13 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
kf w
r 'w = 0.28
k
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
15 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
16 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Propping Embedment
4.00
)
3.00
2
Embedment (lb/ft
2.00
1.00
Embedment
2
at 7 lb/ft
0.00
0 300,000 600,000 900,000 1,200,000
Modulus (psi)
17 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Productivity Increase
High Permeability Low Permeability
Formations Formations
Folds of Increase, (J/Jo)
14 100%
90%
12
80%
70%
10 60% Xf
8 50% re
40%
6 30%
20%
4 10%
2
2 3 4 5 6
10 10 10 10 10
kf w 40
Relative Conductivity,
k A
18 PA
04/25/2006
C. Alvarez
7. Introduction to Hydraulic Fracturing
19 PA
04/25/2006
C. Alvarez
7. Introduction to Hydraulic Fracturing
Fracture Length
Propped Length
Effective Length
Hydraulic Length
20 PA
04/25/2006
C. Alvarez
7. Introduction to Hydraulic Fracturing
Propped Fracture Optimization
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Acid Fracture
Fracture is etched
22 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Improve productivity
Interconnect formation permeability
Improve ultimate recovery
Aid in secondary recovery
Increase ease of injectivity
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
24 PA
Fluid Loss
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Orientation of The Fracture
The fracture will extend perpendicular to the axis of the least stress.
X - Y - Z Coordinate :
Overburden Pressure
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Hydraulic Fracture Fracture Orientation
Overburden Pressure
Intermediate
Principal Stress Horizontal fracture with a
pancake like geometry.
Usually associated with
shallow wells of less than
3,000 ft. depth
26 PA
04/25/2006
C. Alvarez
Maximum Principal Stress
7. Introduction to Hydraulic Fracturing
Production Test
K, S
Analyze
Skin
Mech Pseudo
Skin
Wellbore Zero
Skin Recommendation
Location K<20
Wellbore No
Clean Up
No Candidate Yes
Matrix for high K HCI Yes
Treatment Frac Soluble
No Acid
Be Happy
Prop Frac
Frac
Predict
Production
Do Don’t
$
27 PA
04/25/2006 End
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
C. Alvarez
7. Introduction to Hydraulic Fracturing
29 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
30 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Frac Pump
31 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
C. Alvarez
7. Introduction to Hydraulic Fracturing
33 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
34 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
35 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
FracCAT MV:
SMT 504
36 PA
04/25/2006
C. Alvarez
7. Introduction to Hydraulic Fracturing
General Field View
37 PA
04/25/2006
C. Alvarez
7. Introduction to Hydraulic Fracturing
Wellhead
Tree Saver
Remote Controlled Master Valve on
the tree
Ground Master Valve
Bleed Lines
Check Valves
Pressure Sensors
Flow Meter
Density Meter
38 PA
04/25/2006
C. Alvarez
7. Introduction to Hydraulic Fracturing
39 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Annulus Control
Main Valves
Bleed Lines
Pressure Sensors
Check Valves
Pop-Off Valves
Annulus 1 Annulus 2
9-5/8” Casing 7” Casing
40 PA
04/25/2006
C. Alvarez
7. Introduction to Hydraulic Fracturing
HP Pumps
fluid end 2000 hhp engine
4” LP suction
3’ HP discharge
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
POD Blender
Control
Cabin
Liquid
additive
Dry add
EB Clean
PCM
8” +4”
Discharge
manifold
Vortex
42 PA
04/25/2006
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Precision Control Mixer - PCM
control cabin
4 liquid add
slurry gel
KCl pump
Discharge 8”+4”
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Conveyor belt
Mixing Gate
4” return
circulation
batch mixing
8 “ suction
tank manifold
4x4” to blender
44 PA
04/25/2006 8 bbl tub with
horizontal paddle
C. Alvarez Quartz School. Module 13: Work Over Operations / Section 7: Introduction to Hydraulic Fracturing
7. Introduction to Hydraulic Fracturing
Monitoring and Control VAN
FracCAT ControlRoom TCV pump Room
Data Display
Computer control Digital & graphic Remote
operator
POD Monitoring
Catfrac
remote panel
Client Witness
Client Digital & graphic and engineer
Monitoring
Well Services
SPF 942
Pump operator
remote panel
45 PA
Frac
04/25/2006
Engineer
Frac
Quartz School. Module 13: Work OverMaster
Operations / Section 7: Introduction to Hydraulic Fracturing
C. Alvarez
7. Introduction to Hydraulic Fracturing
Fracturing Equipment Layout – Massive Fracs Pumps
2" Re-circulation
Hose Tank
8" Suction
Frac Tanks Hose
High Choke 2" Bleed
off Pipe
PCM pressure 3" Pipe 2 x 1 Plug
POD II manifold valves
3-way
Chiksan
3x3
3" Pipe plug
valve 2-way Chiksan
Wellhead and
Schlumberger Mast
Valve
Bridge:
2-way & Flapper
3-way Check
Chiksan valve Pressure
4" 3 x 3 Isolation Transducers
Discharge Plug Valve In- line
Hose densitometer
8" Suction
Hose
4 “ Suction 4"Discharge
Hoses
Hose 4 pin
sensor
cable
Sand Hopper
FracCAT
125 ft 37 pin
pump cable
7 pin POD
data cable
Sensor Cable
46 PA
04/25/2006
Sand Chief 7 pin PCM
data cable
C. Alvarez