Sheet1

LINE /
Mesin Pengerjaan
AREA
All Panel Cleaning dan pengencangan koneksi
All Mesin
Listrik kabel

ganti wiremesh tanki ekstrak


Proses
ganti Oli agitator

Ganti Pipa disinsfectan

repair kebocoran pipa rinser (dalam)


Oli Gearbox filler

Head Capper dan Elevasi Capper


Filling

Verifikasi Seal atas Filler bowl

Penggantain seal dan Spring Nozzle

Line 1 TPH
Verifikasi Rantai dan topcahin tilting
Tilting
adjust gap conv out tillting
Cleaning Bak 1-5 diverfoam

Cooling tunnel
Ganti plat PHE CT

Label 1 Ganti bearing cutter block


Label 2 Ganti bearing cutter block
Conveyor Ganti rantai conveyor sebelum label
Ganti inner white rubber gripper yg
Autopacker bocor
Verifikasi rodend lengan erector
Ganti rantai main motor erector
Carton Erector
drawing gear penggerak
Cleaning & greasing all bearing
Carton Sealer Cutter Sealer
Ganti Rantai conv pallet
Palletizer
Ganti all rantai roller conveyor
Proses ganti Oli agitator

Page 1
Sheet1
Cleaning nozzle spray lubrikan
Homogenizer
Cleaning jalur drain lubrikan
drawing gear & spie shaft gearbox
bucket
ganti rantai penggerak (gearbox-bucket)
Filling
Cleaning Sealdisk

ganti shaft & bearing motor conv 3


Line 2
Kopikap Cooling tunnel
Cleaning PHE bak 2 dan 3

ganti all rubber coupling pompa CT


cleaning fan & filter blower

cleaning all roller & meja packing


Packing
greasing all bearing

cleaning all fan motor


Drain air chiller dan flushing

Verifikasi Bearing mold no.14


Blowing Verifikasi Gap Roller arm mold
cleaning all gripper unit PTA & BTA
ganti selang chiller yang bocor
Cleaning mold dan locking pin
Capper ganti gear teflon elevasi
Flushing Nitrogen
Filling
Drain Air lowpress
Line 3 Maintenance weekly
Label
AMDK Drain glue tank dan cleaning
Fujiseal Maintenance weekly
Ganti rubber vacuum
ganti tabung vacuum erector
Case Former
Cleaning dan drain glue tank
Verifikasi linier bearing pressing
Cleaning selenoide clamp
PNP
Ganti tulip yang bocor
bestpack ganti rantai roller out bestpack
ganti rantai conv infeed Palletizer
Palletizer
Verifikasi gardan lifting
Proses ganti Oli agitator
Cleaning nozzle spray lubrikan
Homogenizer
Cleaning jalur drain lubrikan
Filling Cleaning sealdisk

Page 2
Line 4
Kopikap
Sheet1

ganti shaft & bearing motor conv 3


Line 4
Kopikap Cooling tunnel
Cleaning PHE bak 2 dan 3
ganti all rubber coupling pompa CT
cleaning fan & filter blower
cleaning all roller & meja packing
Packing
greasing all bearing
cleaning all fan motor

Kebutuhan Man Power

Pelaksanaan
OFF
Trial
PRODUKSI

Page 3
Sheet1

PLANNING MAINTENANCE LIBUR IDUL FITRI 2023 TFJ PALEMB


Selesai Pengerjaan STATUS
Kebutuhan Part Satuan Qty
PART

Done

Mesh 2 mm food
Done ROLL 1 PO
grade

Done OIL ISO VG 320


(FG) pail 3 PO

Pending Pipa 1,5 inch, 2


inch batang 4 PO
Pending gas argon bot 1 PR
Done Oli 680/VG 220 liter 5 READY

Done Bearing 6007 (10


Capper) pcs 20 READY

Done Bearing NUKR 40


A pcs 40 PO
Done Bearing 61812 pcs 20 READY
Bearing 61840 pcs 1 PO
Oil seal
200x230x15 pcs 1 PO
Done Seal stick nozzle pcs 80 READY
Done Silicone nozzle pcs 80 READY
Done Chain RS 60 meter 1 READY
Done Top chain regina dos 5 READY
Done
Done Diverfoam pail 1
PLATE GASKET
Done PHE BH150B-
117H pcs 50 READY
Done Bearing 6001 pcs 18 READY
Done Bearing 6001 pcs 18 READY
Done rantai RS-50 box 1 READY

white inner rubber pcs 5 READY


Done Rod end pcs 2 READY
Done rantai RS-60x2
Done
Done
Done Cutter pcs 4 READY
Done rantai RS-50 box 5 READY
Rantai RS40 meter 20 READY
Done Oli nevastane 320 pail 3 PO

Page 4
Sheet1
Done
Done

Done

Done rantai RS-80x2 meter 3 READY


Done Amplas 1000 pcs 40 READY

Done bearing UC205 &


shaft pcs 2 READY

Done Gasket PHE


M6MFG pcs 10 READY

Done
rubber coupling pcs 100 PO
Done

Done

Done

Done

Done

Done Bearing axk 4060


RNA 4906 pcs 10 PR
Done
Done
Done

Done gear teflon pcs 11 READY


Done

Done
Done
Done
Rubber suction pcs 10 READY
Pending REPAIR

Done pcs 1 READY

Membrane tulip 7 READY


Done rantai RS-40 box 5 READY
Done rantai RS-40 box 5 READY
Done
Done Oli nevastane 320 pail 3 PO
Done
Done
Done Sealdisk pcs 20 READY

Page 5
Sheet1

Done bearing UC205 &


shaft pcs 2 READY

Done Gasket PHE


M6MFG pcs 10 READY
Done rubber coupling pcs 100 PO
Done
Done
Done
Done

Kebutuhan Man Power

SHIFT 1 &
NS

SH 2

SH 3

Page 6
Sheet1

DUL FITRI 2023 TFJ PALEMBANG


Pelaksanaan
17/04/23 18/04/23 19/04/23 20/04/23 21/04/23 22/04/23

CHANDRA CHANDRA

DIAN DIAN

DIAN DIAN

YIYIN YIYIN

YIYIN YIYIN
ARFI

TUMONO

TUMONO

TUMONO
TUMONO TUMONO

TUMONO TUMONO

ARFI ARFI
ARFI ARFI

DIKA DIKA
OP OP

IRSAN

ABI
ABI
ABI

ABI

ABI
ARSI
ARSI
OP
ABI
ABI
ABI
ABI ABI

Page 7
Sheet1
OP
OP

ARSI

ARSI/DIAN
OP

ILHAM/YIYIN ILHAM/YIYIN

OP OP

ILHAM/YIYIN ILHAM/YIYIN

ILHAM/YIYIN ILHAM/YIYIN

ILHAM/YIYIN ILHAM/YIYIN

ILHAM/YIYIN ILHAM/YIYIN

ILHAM/YIYIN ILHAM/YIYIN

FITRA

FITRA FITRA

FITRA FITRA
FITRA
OP
MAD MAD
OP
OP
OP
MAD MAD

YUNUS YUNUS
OP
YUNUS
MAD MAD
MAD MAD
YUNUS YUNUS
YUNUS YUNUS
YUNUS
ABI ABI IRSAN
OP
OP
OP

Page 8
Sheet1

ILHAM/ABI ILHAM/ABI IRSAN

OP OP OP

ILHAM/ABI ILHAM/ABI IRSAN


ILHAM/ABI ILHAM/ABI IRSAN
ILHAM/ABI ILHAM/ABI IRSAN
ILHAM/ABI ILHAM/ABI IRSAN
ILHAM/ABI ILHAM/ABI IRSAN

12 eng 12 op 12 eng 12 op 12 eng 10 op 12 eng 12 op

ARSI
ARSI
YIYIN
YIYIN
ABI
ABI
TUMONO
FITRA ALL ALL OFF OFF
ILHAM
MAD
FITRA
YUNUS
YUNUS
MAD

DIKA
DIAN OFF OFF OFF OFF OFF
ILHAM

ARFI
OFF OFF OFF OFF OFF
IRSAN

Page 9
Sheet1

laksanaan NO TEAM ENGINEERING


23/04/23 24/04/23 25/04/23 26/04/23 1 PLANNER
2

YIYIN 3

UH
4

YIYIN DIAN 5

6
7

IRSAN TUMONO 8

IRSAN TUMONO 9 PELAKSANA


TPH KOPIKAP
IRSAN TUMONO 10
IRSAN 11

IRSAN 12

13
14 PELAKSANA
AMDK
OP 15
OP PELAKSANA
16
OP KALIBRASI
TOTAL MPP

ILHAM
ILHAM
ILHAM

ILHAM
ILHAM ABI
ILHAM ABI

Page 10
Sheet1

FITRA

MAD
YUNUS

Page 11
Sheet1

OPSIONAL

4 eng 4 op 12 eng 12 op 8 eng 8 op

CHANDRA ARFI
ARSI
ARSI TUMONO
TUMONO
OFF YIYIN FITRA
ILHAM
IRSAN MAD
MAD
ILHAM YUNUS
RIZKY

ARFI
DIAN
OFF OFF OFF
IRSAN
FITRA
DIKA
DIKA
YIYIN
OFF OFF DIAN
ABI
ABI
YUNUS

Page 12
Sheet1

TEAM ENGINEERING 18/04/23 19/04/23 20/04/23 21/04/23 22/04/23 23/04/23


APRI

EDO

CHANDRA

ARFI

ARSI
DIKA
TUMONO

ILHAM

IRSAN
DIAN
YIYIN

ABI
FITRA
YUNUS
MAD

RIZKY

TOTAL MPP 16 14 14 0 0 0

LIBUR
MASUK NON SHIFT
PRODUKSI

Page 13
Sheet1

24/04/23 25/04/23 26/04/23 TOTAL LIBUR


7
8

4
4

4
4

4
4
4

5 9 15

Page 14