This document is a checklist of documents required for merchandising and shop opening for a new unit, Kimbo Espresso Italiano, at Abu Dhabi Mall. It lists 28 items needed including trade licenses, insurance policies, completion certificates, shop drawings, layouts, test reports, and commissioning reports from the contractor and tenant. The tenant or their representative and TCT representative must sign off to confirm all required documents have been provided in both hard copy and soft copy formats.
This document is a checklist of documents required for merchandising and shop opening for a new unit, Kimbo Espresso Italiano, at Abu Dhabi Mall. It lists 28 items needed including trade licenses, insurance policies, completion certificates, shop drawings, layouts, test reports, and commissioning reports from the contractor and tenant. The tenant or their representative and TCT representative must sign off to confirm all required documents have been provided in both hard copy and soft copy formats.
This document is a checklist of documents required for merchandising and shop opening for a new unit, Kimbo Espresso Italiano, at Abu Dhabi Mall. It lists 28 items needed including trade licenses, insurance policies, completion certificates, shop drawings, layouts, test reports, and commissioning reports from the contractor and tenant. The tenant or their representative and TCT representative must sign off to confirm all required documents have been provided in both hard copy and soft copy formats.
1 Trade license for the Shop; x Tenant 2 Insurance policy for trading; Tenant 3 CD Fitness (ISTIFAA) Certificate; Tenant 4 Hassantuk Completion Certificate; Tenant 5 CD Completion Certificate; Contractor 6 ADM Completion Certificate; Contractor 7 Civil Defense Shop drawing approval; x Contractor 8 Civil Defense & ADM Initial approval ; x Contractor 9 ATEIS Completion certificate for FA & VA system; x Contractor 10 ADDC Approved layouts; x Contractor 11 MEP & Architectural As-Built Layouts (PDF & Auto CAD); Contractor 12 Firefighting pressure test report; x Contractor 13 Fire Fighting installation / Completion Certificate; x Contractor 14 HVAC - Chilled water pressure test report; Contractor 15 HVAC - Chemical Flushing report; Contractor 16 HVAC - Air Balancing Report (Witness by EMCOR); x Contractor 17 Electrical - DB megger test report (Witness by EMCOR); x Contractor 18 Electrical - installation Certificate /Completion Certificate; x Contractor 19 Drainage system gravity / leakage test report; x if any/ F&B units 20 Cold water line (PPR) pressure test report; x if any/ F&B units 21 Waterproofing system test report & Completion Certificate; x if any/ F&B units Fire suppression system testing, Commissioning report & x 22 Completion certificate; if any/ F&B units LPG system testing, Commissioning report & Completion 23 certificate from SERGAS; if any/ F&B units 24 LPG & Fire suppression system AMC; ------ x if any/ F&B units 25 Kitchen Extract & Fresh air system air balancing report; x if any/ F&B units 26 Kitchen Equipment testing and commissioning report; if any/ F&B units 27 Grease eradication system testing & commissioning report. x if any/ F&B units 28 Grease eradication system AMC; if any/ F&B units Notes: NOTE: Provide 1 sets of hard copy and 1 set of soft copy-CD ( All documents and drawings with PDF & Auto CAD
formats) with covering letter address to Mr. Subhash.
TENANT OR/ REPRESENTATIVE (TCT) REPRESENTATIVE Name Sumeesh Kumar VK Name Date 12-07-2023 Date Signature Signature
As at 31 August 2020 Subject To Change at The Discretion of Commsec Margin Lending LVR Changes Changes Since The Last Approved Securities List Was Published Are Outlined in The Below Table