Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

GUIDE

DICOM Connection A260-005831


for ECG-2250 , ECG-2350 First Edition:5 Sep. 2016

General Connection Flowchart


Use this guide to connect ECG-2250 or ECG-2350 to Do the following procedures to connect ECG-2250 or ECG-
DICOM system of RIS, PACS, etc. This guide introduces 2350 to DICOM system of RIS, PACS, etc.
the procedures of receiving patient information (MWM) and
sending DICOM image (STORAGE). <Preparation>
• Discuss the schedule, setting information and operation
In addition, this guide is for Ver.02-XX of ECG-2250 ,
1 • Get setting information of MWM connection
Ver.03-XX of ECG-2350. destination system
• Fill in the check sheet

General Safety Information


<Electrocardiograph setting>
CAUTION • IP address setting
• Contact your connection destination vendor to discuss • Common setting
2 • STORAGE setting
the schedule, setting information and operation.
• Connection and conformation usually takes 1 hour to • MWM setting (when connecting with MWM )
2 hours. • LAN test, confirm the connection is successful
• Filling in and managing the MWM and STORAGE setting
information and test result are highly recommended. For
the sample template, refer to the check sheet. <Action confirmation>
• Send the image (STORAGE)
3
• Receive the patient information (MWM)
(when connecting with MWM)
Preparation
Preparation Remark
Check sheet
Change according to the condition. <Save and manage the Local environment>
(for MWM, STORAGE)
4 • Save the system settings
Get IP address, subnet mask, default • Fill in the check sheet
gateway of ECG-2250 or ECG-2350
from the hospital or the person in
IP address information
charge of connection destination.
Fill in the check sheet with above
information.
Get connection destination IP address,
AE title, port, etc. from the person in
Setting information charge of connection destination.
of MWM connection
• Contact the local person in charge to
destination system
get above information.
(MWM connection)
• Fill in the check sheet with above
information.
Get connection destination IP address,
AE title, port, etc. from the person of
Setting information of connection destination.
STORAGE connection • Contact the local person in charge to
destination system get above information.
• Fill in the check sheet with above
information.
Use it when you need to record ECG
ECG wave generator
waveform.

1/3
Communication Settings for IP Address MWM Communication Test by
1 Set the IP address, subnet mask, default gateway of the
Receiving the Patient Information
electrocardiograph. When all the settings are completed, check the MWM
communication by receiving the patient information.
For details, refer to the Operater’s Manual of ECG-2250
or ECG-2350.
1 Get the test order from the person in charge of connection
2 Set the “Setup-Communication settings-Common settings- destination.
Communication mode” to “DICOM”.
2 Press the “ID” key to display “Enter the ID” screen. Enter
3 Set the “DICOM settings” in “Setup-Communication the patient ID and press the “Search” function key.
settings-Server settings”.
NOTE When need to connect execute MWM, set the
“Setup-Patient information-Input settings-Query
settings-Patient server” to “On”.

Confirm the Connection is Successful


When above settings are completed, turn off the
electrocardiograph.

1 Press the POWER key while pressing the FEED/MARK


key. The “System Test” screen is displayed.
3 If the searched patient information is normally received,
2 Select “LAN Test” and press the “Enter” function key. the patient information will be displayed on the screen.

3 Enter the MWM server address with the keyboard on the


operation panel. Press the “OK” function key.

4 Test the connection.


i) If the connection is successful, the “Success” message
is displayed on the screen.
ii) If the connection is failed, the “Fail” message is
displayed on the screen. Check the followings:
-- Check the electrocardiograph IP address.
-- Check the connection destination system IP address.
4 Tick the boxes on the check sheet and fill the searched
-- Check the communication path between HUB and patient information in the check sheet.
server.

5 Enter the Storage server address on the LAN Test screen


and press the “OK” function key. Repeat the step 4 to test
Storage server connection.

2/3
STORAGE Communication Test by Save and Manage the Local
Sending the DICOM Image Environment
When all the settings are completed, check the STORAGE When all the operation is completed, save the system settings
communication by sending DICOM image. and fill in the check sheet.
Please manage the system settings and check sheet.
1 Confirm the available patient ID, name with the person
in charge of connection destination before you send the
DICOM image.

2 Enter the patient information on the Patient information


screen.

NOTE • Use the test order after you set to receive the
patient information.
• Enter the weight, birth date (age) manually if
these information cannot be acquired.

3 Press START/STOP key to test the ECG wave. Press


the “File” function key after completion of automatic
recording, the screen displays the processing infromation.
Press the “Send” function key to send the ECG data file.

4 Confirm the file is opened on system end with the person


in charge of connection destination. Fill in the check sheet
with sent information.
Copyright Notice
5 Confirm any other inadequate preparation with the person The entire contents of this manual are copyrighted by
in charge of connection destination. Shanghai Kohden. All rights are reserved.

Europe
Manufacturer
European Representative
SHANGHAI KOHDEN MEDICAL NIHON KOHDEN EUROPE GmbH NIHON KOHDEN UK LTD NIHON KOHDEN SINGAPORE PTE LTD NIHON KOHDEN KOREA, INC.
ELECTRONIC INSTRUMENT CORP. Raiffeisenstrasse 10 Trident Court 118, 1 Oakcroft Road 1 Maritime Square, #10-34 HarbourFront 5F Miso Bldg.890-47 Daechi-dong,
567 Huancheng Bei Road, Shanghai D-61191 Rosbach, Germany Chessington, Surrey KT9 1BD, UK Centre Singapore 099253 Gangnam-gu, Seoul, 135-280 Korea
Comprehensive Phone +49 6003-827-0 Phone +44 20-8391-6800 Phone +65 6376-2210 Phone +82 2-3273-2310
Industrial Development Zone, Shanghai China Fax +49 6003-827-599 Fax +44 20-8391-6809 Fax +65 6376-2264 Fax +82 2-3273-2352
Post Code: 201401
Phone: +86 (21) 57436998 NIHON KOHDEN DEUTSCHLAND GmbH NIHON KOHDEN ITALIA S.r.l. NIHON KOHDEN FRANCE SARL NIHON KOHDEN IBERICA S.L.
Fax : +86 (21) 57436939
Raiffeisenstrasse 10 Via FratelliBronzetti 28 8, rue Francois Delage, 94 230 Cachan, C/Ulises 75A
D-61191 Rosbach, Germany 24124 Bergamo, Italy France E-28043 Madrid, Spain
Phone +49 6003-827-0 Phone +39 035-219543 Phone +33 1-49-08-05-50 Phone +34 91-7-161080
Fax +49 6003-827-599 Fax +39 035-232546 Fax +33 1-49-08-93-32 Fax +34 91-3-004676

3/3

You might also like