Professional Documents
Culture Documents
Victoria Admin Buildin Structural Drawings
Victoria Admin Buildin Structural Drawings
Victoria Admin Buildin Structural Drawings
6" 9"
9"
712"
10
721"
721"
6"
9
421"
7'-1"
521" 612"
1112"
8
821"
8'-11"
721" 721"
1'-112"
512" 1'-021" 6" 1'-0" 1'-2" 10"
3"
6"
6"
7
1'-0"
1'-121"
1'-0"
9"
7'-6"
5" 7"
1'-0"
6
8"
11'-5"
9"
812"
7"
5
8"
921"
9"
4'-6"
1'-121"
1'-0"
4
1'-0"
1'-112"
14'-0"
1'-0" 5"
5"
2'-0" 2'-7"
5"
5"
2'-7"
2'-7"
5"
3'-3 "
6" 1'-0" 521" 1'-021" 6" 1'-0"
1
2
5" 1'-7"
9"
9"
9"
6"
3 5" 5"
6"
9"
9"
9"
7"
4'-11"
2'-6"
4"
6"
2
6"
6"
6"
7" 2'-0" 2'-7"
5" 5"
14'-1"
1'-7"
1'-7"
5" 1'-3" 1'-0" 1'-0" 1'-0" 1'-0"
7"
7"
7"
1
5"
5"
5"
5"
5"
5"
14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 2'-11" 8'-0" 6'-3"
A B C D E F G H I J K
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE COLUMN LAYOUT PLAN
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-01
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
1'-6"
6" 9"
9"
712"
10
721"
721"
6"
9
421"
7'-1"
521" 612"
1112"
8
821"
8'-11"
6" 6"
1'-0"
512" 1'-021" 6" 1'-0" 1'-2" 10"
3"
6"
6"
7
1'-0"
1'-0"
1'-0"
9"
7'-6"
5" 7"
1'-0"
6
8"
11'-5"
512"
9"
812"
5
621"
921"
9"
4'-6"
1'-0"
1'-0"
4
1'-0"
1'-0"
14'-0"
1'-0" 5"
5"
2'-0" 2'-7"
5"
5"
2'-7"
2'-7"
5"
3'-3 "
6" 1'-0" 521" 1'-021" 6" 1'-0"
1
2
5" 1'-7"
9"
9"
9"
6"
5" 5"
3
6"
9"
9"
9"
7"
4'-11"
2'-6"
4"
6"
2
6"
6"
6"
7" 2'-0" 2'-7"
5" 5"
14'-1"
1'-7"
1'-7"
5" 1'-3" 1'-0" 1'-0" 1'-0" 1'-0"
7"
7"
7"
1
5"
5"
5"
5"
5"
5"
14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 2'-11" 8'-0" 6'-3"
A B C D E F G H I J K
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE COLUMN LAYOUT PLAN
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-02
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
COLUMN SCHEDULE
BELOW P.L
1'-3"
1'-3"
1'-3"
1'-3"
1'-3"
1'-3"
1'-3"
10mmØ@4"c/c
4500 psi
FLOOR
12-20Ø 4-25 Ø +10-20Ø 4-25 Ø +10-20Ø 4-25 Ø +12-20Ø 10-20Ø 4-25 Ø +12-20Ø
L/4
14-20Ø
2'-3"
1'-8" 2'-0" 2'-0" 1'-8" 1'-6" 2'-0"
Ground Floor
1'-0"
1'-0"
1'-3"
1'-0"
1'-0"
1'-0"
1'-0"
4500 psi
12-20Ø 4-25 Ø +10-20Ø 4-25 Ø +10-20Ø 4-25 Ø +12-20Ø 10-20Ø 4-25 Ø +12-20Ø
10mmØ@6"c/c
14-20Ø
L/2
1'-8" 2'-0" 2'-0" 2'-0" 1'-8" 1'-6" 2'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1st & 2nd 4500 psi
Floor
12-20Ø 4-25 Ø +10-20Ø 4-25 Ø +10-20Ø 4-25 Ø +12-20Ø 14-20Ø 10-20Ø 4-25 Ø +12-20Ø
10mmØ@4"c/c
1'-8" 2'-0" 2'-0" 2'-0" 1'-8" 1'-6" 2'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
L/4
3rd & 4th 4500 psi
Floor
8-20+4-16Ø 14-20 Ø 14-20 Ø 14-20 Ø 10-20+4-16Ø 6-20+4-16Ø 16-20 Ø Floor level
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
5th & top 4500 psi
Floor TIE SPACING
4-20+8-16Ø 8-20+6-16 Ø 8-20+6-16 Ø 8-20+6-16Ø 6-20+8-16Ø 10-16Ø 8-20 Ø +8-16Ø DETAILS OF COLUMN
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE COLUMN SCHEDULE
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-03
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
COLUMN SCHEDULE
Name of Concrete
C-4A C-11A
Column Strength, f'c
Floor level
2'-6" 2'-6"
10-16Ø
12-16Ø
BELOW P.L
10mmØ@4"c/c
4500 psi 18"X18"
FLOOR 12"X24"
14-20Ø 8-25 10Ø@5"c/c
L/4
10Ø@5"c/c +8-20Ø
2'-3" 2'-3"
10-16Ø
12-16Ø
Ground Floor
4500 psi G.F & 2ND 18"X18"
12"X24"
FLOOR
14-20Ø 8-25 10Ø@5"c/c
10mmØ@6"c/c
10Ø@5"c/c +8-20Ø
L/2
2'-0" 1'-6"
ONLY 2ND
1st & 2nd 4500 psi 1'-0"
1'-6"
FLOOR
Floor
14-20Ø
8-25 Ø +8-20Ø
10mmØ@4"c/c
2'-0" 1'-6"
1'-0"
L/4
1'-6"
3rd TO 5th 4500 psi
Floor
10-20+4-16Ø
Floor level
4-25 Ø +12-20Ø
1'-3" 1'-6"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE COLUMN SCHEDULE
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-04
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
COLUMN SCHEDULE
Name of Concrete
Column Strength, f'c C-7 C-8 C-9 C-10 C-11 SW-1
3'-0" 3'-8" 3'-0"
3'-0"
10Ø@5"c/c
12Ø@4"c/c
BELOW P.L
1'-3"
1'-6"
1'-3"
1'-6"
1'-9"
4500 psi 12Ø@4"c/c 12Ø@4"c/c
3'-2"
10Ø@5"c/c 10Ø@5"c/c
FLOOR
Floor level
4-25Ø + 8-20Ø 10-20Ø 12Ø@4"c/c
4-25Ø+8-20Ø 10-25 Ø +6-20Ø 10Ø@5"c/c
3'-0"
8-25 Ø +8-20Ø
10mmØ@4"c/c
10"
L/4
2'-0" 1'-6"
1'-8" 1'-3" 1'-3"
1'-0"
28-25 Ø
1'-3"
1'-0"
1'-3"
1'-6"
4500 psi
3'-0"
Ground Floor 12Ø@6"c/c
10"
8-25 Ø +8-20Ø
10mmØ@6"c/c
3'-0"
10"
L/2
1'-6"
1'-8" 1'-3" 1'-3" 2'-0"
1'-0"
1'-3"
1'-0"
1'-6"
28-25 Ø
1'-3"
1st & 2nd 4500 psi
3'-0"
12Ø@6"c/c
Floor
4-25Ø + 8-20Ø 4-25Ø+8-20Ø 10-20Ø 10-25 Ø +6-20Ø 8-25 Ø +8-20Ø
10"
10mmØ@4"c/c
3'-0"
10"
L/4
1'-6"
1'-8" 1'-3" 1'-3" 2'-0"
1'-3"
1'-0"
1'-6"
1'-3"
3rd & 4th 4500 psi Ø+14-20Ø
3'-0"
12Ø@6"c/c
Floor
12-20Ø 6-20+4-16Ø
12-20Ø 6-25 Ø +10-20Ø 4-25 Ø +12-20Ø
10"
3'-0" TIE SPACING
10" DETAILS OF COLUMN
1'-6"
1'-8" 1'-3" 1'-3" 2'-0"
1'-0"
1'-3"
1'-0"
1'-6"
24-20 Ø
1'-3"
3'-0"
12Ø@6"c/c
Floor
6-20Ø + 6-16Ø 6-20Ø+6-16Ø 10-16Ø 16-20Ø 16-20Ø
10"
3'-0"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE COLUMN SCHEDULE
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-05
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
3'-6"
1'-712" 1'-1012"
1'-6"
912"
10
1'-9" 1'-9"
3'-6"
2'-821"
3'-6"
9
7"
7'-1"
512"
P-3 112"
7" P-2
1'-9" 1'-9"
3'-6"
8
3'-6" P-2
8'-11"
1'-9" 1'-9" 1'-6"
1'-9" 2'-0"
1'-412"
1'-0"
1'-421"
1'-2"
1'-9" 2'-6"
3'-6"
3'-6"
3'-6"
7
412"
3'-6"
2'-121"
2'-121"
2'-4"
2'-121"
7'-6" 1"
3'-6" 3'-6" 3'-6"
1'-11"
P-3 7"
P-4 P-4 P-3
2"
3'-6"
6
1'-7"
6"
P-2
11'-5"
1'-9"
3'-6"
7"
1'-9"
1'-9" 1'-9"
3'-6"
3'-6"
3'-6"
5
1'-712" 1'-1012"
P-3
4'-6"
1'-9"
1'-8" 1'-10"
1'-9"
1'-2"
3'-6" 3'-6"
1'-9" 1'-9" P-4 3'-6"
3'-6"
4
3'-6"
P-4
2'-4"
6" 3'-6"
P-3 P-4
14'-0"
8'-10"
2" 4'-3" 4'-3" 2"
1'-6"2'-0" 1'-6"2'-0"
1'-912"
7" 1'-6"2'-0"
1'-921"
2'-11"
2"
4'-0"
1'-9 "
1'-9" 1'-9"
LIFT CORE
1
2
3'-6"
3'-6"
3'-6"
3'-6"
3
1'-8 "
8'-3"
1
2
4'-11"
1'-812"
1'-812"
4'-0"
3'-6" 3'-6" 3'-6"
P-3 3'-6"
7"
3'-6"
2
P-4 P-4 P-4
1"
1'-9"
P-9 1'-9"
P-2
14'-1"
7" 7"
7"
2'-4"
1'-10"
3'-6" 1'-2"2'-4" 1'-9"
2'-4"
2'-11"
7"
7"
1'-9"
3'-6"
3'-6"
3'-6"
8"
8"
1"
1
1'-2"
6"
7"
3'-6"
1'-2"
1'-8"
1'-5" 2'-1" 1'-9"1'-9" 1'-9"1'-9" 1'-9"1'-9"
3'-6"
P-2 3'-6" P-3 3'-6" P-3 3'-6" P-3 P-2
14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 2'-11" 8'-0" 6'-3"
A B C D E F G H I J K
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-06
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
EGL
3'-0"
10mm Ø @ 4" C/C
14"
10mm Ø @ 3" C/C PITCH
1" x 1" Chamfer
20"
X X cut off level
3'-0"
2.5" CLEAR COVER
4"
Bottom of pile cap
14"
Note:
0.25L
Above cutoff level piles to be
hacked off and reinforcement
to be developed into the 8-16mm Ø
pilecap during construction. 14"
10mm Ø @ 150mm C/C
SECTION X-X
10mm Ø @ 6" C/C
(25mm Ø)
2.5" CLEAR COVER
14"
8-16mm Ø
8-16mm Ø
33'-6"
32'-0"
14"
SECTION Y-Y
20mm Ø ROD
WELDED TO SHOE
1'-0"
87 87
P P
175
0.25L
1'-6"
SEE DETAIL - K
4"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE REINFORCEMENT DETAILS OF PRE-CAST PILE
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-07
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
KEY NOTES:-
I) CONCRETE CLEAR COVER=2.5"
II) CONCRETE COMPRESSIVE STRENGTH, f'c= 3500 psi
III) YIELD STRENGTH OF M.S. BAR, fy=60,000 psi
IV) ALL DIMENSIONS ARE IN INCHES OTHERWISE MENTIONED
V) PILE MUST BE DRIVEN USING STATIC HAMMER
VI) PILE SHOULD BE CLEARLY MARKED WITH REFERENCE NUMBER, DATE
OF CASTING TO ENSURE THAT THE YARE DRIVEN IN CORRECT SEQUENCE.
VII) DESIGN CAPACITY OF PILE P= 106 TONS
VIII) APPLIED LOAD FOR LOAD TEST, P= 1.5 TIMES OF PILE CAPACITY
( FOR SERVICE PILE)
0.25L
IX) APPLIED LOAD FOR LOAD TEST, P= 2 TIMES OF PILE CAPACITY
( FOR TEST PILE)
X) PILE LOAD CAPACITY IS TO BE CONFIRMED BY STATIC PILE LOAD
TEST.ON THE BASIS OF STATIC PILE LOAD TEST , FINAL DESIGN LENGTH
L
OF OTHER PILES WILL BE CONFIRMED.
0 .2 5
POINT OF LIFTING
0.5L
POINT OF ERECTION
L
L
0.75
0.25L
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE POINT OF LIFTING & ERECTION
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-08
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
2'-821"
1'-1012"
2'-1121" 1'-4" 1'-4"
1'-6"
3'-1"
10
421"
5'-8"
9
3'-5"
3'-1"
1'-4"
7'-1"
1'-4" 1'-212"
P.C-3 1121"
P.C-2
3'-1"
8
P.C-2
3'-1"
5'-8"
8'-11"
2'-10" 3'-4" 2'-10" 3'-4" 2"
2'-10" 2'-10" 3'-5" 2'-1"
2'-521"
2'-812"
2'-812"
2'-3"
812"
7
5'-8"
3'-512"
3'-512"
3'-5"
1'-512"
1'-3"
7'-6"
1'-5"
3'-221"
P.C-3
1'-1" 1'-1"
P.C-4 P.C-4 P.C-3
3'-3"
6
2'-11"
P.C-2
11'-5"
5'-8"
2'-10"
3'-1"
3'-1"
1'-1"
5 2'-1121" 3'-221"
2'-10"
1'-1"
3'-1"
3'-1"
4'-6"
2'-9" 2'-11"
3'-1"
2'-3"
3'-5"
4
5'-8"
P.C-3
1'-0" 1'-2"
P.C-4
14'-0"
1'-2"
1'-9" 5'-4" 4'-1"
P.C-3 2'-10" 3'-4" 2'-10" 3'-4" 2'-10" 3'-4"
3'-321"
1'-1"
3'-121"
3'-121"
3'-121"
2'-10"
LIFT CORE
3
8'-3"
2'-10"
1'-1"
3'-012"
3'-012"
3'-012"
4'-1121"
4'-11"
1'-4"
2
1'-8"
7"
3'-5"
P.C-4 P.C-4 P.C-4
1'-4"
5'-8"
1'-3"
P.C-9 3'-1" 3'-1"
P.C-2
14'-1"
3'-5"
3'-5"
3'-5"
3'-5"
1'-5"
1'-5"
1'-2"
P.C-3
5'-8"
5'-8"
5'-8"
7"
7"
7"
1
1'-8"
1'-8"
1'-8"
1'-0"
1'-3"
1'-3"
2'-8" 3'-6" 3'-1" 3'-1"
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-09
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
Clear cover 1.5" P.L=+1'-6''
6"
E.G.L=±0'-0''
1'-0"
Grade beam
4'-0"
P.L=+1'-6''
6"
E.G.L=±0'-0''
1'-0"
Grade beam
1'-0" 1'-0" 3"
2'-0"
12mmØ@ 8" C/C
Clear cover 3"
3"
1'-3" 1'-3"
4'-0"
4"
3"c.c 25mmØ @ 6"c/c
SECTION B-B
25mmØ @ 6"c/c
3"
1'-0" 1'-0" 12mmØ@ 8" C/C
18''
1'-3" 1'-3"
3"
2'-2"
1'-1"
4"
2'-4"
5'-8"
1'-4" 3'-6" 1'-4"
B B
1'-2"
1'-4"
A A
1'-1"
2'-8"
1'-4"
5'-8"
6'-2"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF PILE CAP
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
MD. FAISHAL HASAN
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
For any confusion please All other drawings before the last revised drawing
Tel :+88029840957
ALOK DAS AD-05
MIEB-A-18446
type of improper construction work.
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-10
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
Clear cover 1.5" P.L=+1'-6''
6"
E.G.L=±0'-0''
1'-0"
Grade beam
4'-0"
1'-0" 1'-0"
2'-6"
3"
12mmØ@ 8" C/C
3"
4"
C C
5'-8"
1'-9"
1'-1"
5'-8"
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-11
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
P.L=+1'-6''
6"
E.G.L=±0'-0''
1'-0"
Grade beam
4'-0"
20mmØ @ 4"c/c
20mmØ @ 4"c/c
2'-0"
12mmØ@ 8" C/C
1'-3" 1'-3"
3"
4"
3"c.c 20mmØ @ 4"c/c
20mmØ @ 4"c/c
SECTION D-D
9"
4'-7"
10'-8"
D D
4'-7"
9"
PLAN OF PILE CAP (P.C-9)
11'-2"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF PILE CAP
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-12
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
1'-6"
10
9 GB-1a
7'-1"
GB-1a
GB-5
GB-4
GB-4
8'-11"
GB-1a
GB-4
GB-4
GB-4
GB-5
11'-5"
GB-2
GB-3 GB-3
5
4'-6"
GB-3 GB-3
4
GB-4
GB-4
GB-5
GB-2
14'-0"
GB-4
GB-4
GB-3 GB-3 GB-3 GB-3
3
4'-11"
2
GB-6
GB-2
GB-4
GB-4
GB-4
GB-4
14'-1"
GB-5
GB-1 GB-1 GB-1 GB-1 GB-1
1
14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 2'-11" 8'-0" 6'-3"
A B C D E F G H I J K
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-13
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
A B C D
14'-5" 16'-10.5" 15'-10"
2-20 Ø ST. 2-20 Ø ST.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 1-25 Ø EXT.
1-25 Ø ext. 1-25 Ø ext. 2 1-25 Ø ext.
1 2-20 Ø EXT.
3'-6" 2-20 Ø st. 4'-2" 4'-9" 2-20 Ø st. 4'-9" 4'-6" 2-20 Ø st. 4'-6" 10Ø@ 7"C/C
20"
20"
10Ø@ 5"C/C
6" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"
10 Ø @ 7" C/C 10 Ø @ 5" C/C 10 Ø @ 5" C/C 10 Ø @ 7" C/C 10 Ø @ 5" C/C 3-20 Ø 3-20 Ø
12 12''
10 Ø @ 5" C/C 2 1 10 Ø @ 5" C/C
3-20 Ø St. 3-20 Ø st. GB-1 GB-1
10 Ø @ 5" C/C 10 Ø @ 7" C/C
. .
SECTION 2-2 SECTION 1-1
1 3 4 6
18'-10" 14'-0" 15'-10.5"
2-20 Ø ST. 2-20 Ø ST.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 1-25 Ø EXT.
1-25 Ø ext. 1-25 Ø ext. 2 1-25 Ø ext.
1 2-20 Ø EXT.
4'-7" 2-20 Ø st. 5'-6" 4'-2" 2-20 Ø st. 4'-2" 4'-6" 2-20 Ø st. 4'-6" 10Ø@ 7"C/C
20"
20"
10Ø@ 5"C/C
10" 1'-6" 1'-0" 1'-0" 1'-0" 1'-0"
10 Ø @ 5" C/C 10 Ø @ 7" C/C 10 Ø @ 5" C/C 3-20 Ø 3-20 Ø
10 Ø @ 7" C/C 10 Ø @ 5" C/C
12" 12"
10 Ø @ 5" C/C 2 1 10 Ø @ 5" C/C
3-20 Ø St. 3-20 Ø st. GB-2 GB-2
10 Ø @ 5" C/C 10 Ø @ 7" C/C
. .
SECTION 2-2 SECTION 1-1
A B C D
14'-5" 16'-10.5" 15'-10"
2-20 Ø ST. 2-20 Ø ST.
3-20 Ø ext. 3-20 Ø ext. 3-20 Ø ext. 1-25 Ø EXT.
1-25 Ø ext. 1-25 Ø ext. 2 1-25 Ø ext.
1 3-20 Ø EXT.
3'-6" 2-20 Ø st. 4'-2" 4'-9" 2-20 Ø st. 4'-9" 4'-6" 2-20 Ø st. 4'-6" 10Ø@ 7"C/C
20"
20"
10Ø@ 5"C/C
6" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"
10 Ø @ 5" C/C 10 Ø @ 7" C/C 10 Ø @ 5" C/C 3-20 Ø 3-20 Ø
10 Ø @ 7" C/C 10 Ø @ 5" C/C
12'' 12''
10 Ø @ 5" C/C 2 1 10 Ø @ 5" C/C
3-20 Ø St. 3-20 Ø st. GB-3 GB-3
10 Ø @ 5" C/C 10 Ø @ 7" C/C
. .
SECTION 2-2 SECTION 1-1
1 3 4 6
18'-10" 14'-0" 15'-10.5"
2-20 Ø ST. 2-20 Ø ST.
3-20 Ø ext. 3-20 Ø ext. 3-20 Ø ext. 1-25 Ø EXT.
1-25 Ø ext. 1-25 Ø ext. 2 1-25 Ø ext.
3-20 Ø EXT.
2-20 Ø st. 1 2-20 Ø st. 4'-2" 2-20 Ø st. 10Ø@ 7"C/C
20"
20"
4'-7" 5'-6" 4'-2" 4'-6" 4'-6"
10Ø@ 5"C/C
10" 1'-6" 1'-0" 1'-0" 1'-0" 1'-0"
3-20 Ø 3-20 Ø
10 Ø @ 7" C/C 10 Ø @ 5" C/C 10 Ø @ 5" C/C 10 Ø @ 7" C/C 10 Ø @ 5" C/C 12'' 12''
10 Ø @ 5" C/C 2 1 10 Ø @ 5" C/C
3-20 Ø St. 3-20 Ø st. GB-4 GB-4
10 Ø @ 5" C/C 10 Ø @ 7" C/C
. . SECTION 2-2 SECTION 1-1
PART LONG SECTION OF GB-4 (12"X20")
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE LONG SECTION OF GRADE BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-14
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
A B C D
16'-3" 19'-0" 17'-11"
2-20 Ø ST. 2-20 Ø ST.
2-20 Ø ext. 3-20 Ø ext. 3-20 Ø ext. 1-20 Ø EXT.
1-20 Ø ext. 1-20 Ø ext. 2 1-20 Ø ext.
1 3-20 Ø EXT.
4'-0" 2-20 Ø st. 4'-9" 5'-0" 2-20 Ø st. 5'-0" 5'-0" 2-20 Ø st. 5'-0" 10Ø@ 7"C/C
20"
20"
10Ø@ 5"C/C
10" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6"
10 Ø @ 7" C/C 10 Ø @ 5" C/C 10 Ø @ 5" C/C 10 Ø @ 7" C/C 10 Ø @ 5" C/C 3-20 Ø 3-20 Ø
12'' 12''
10 Ø @ 5" C/C 2 1 10 Ø @ 5" C/C
3-20 Ø St. 3-20 Ø st. GB-1a GB-1a
10 Ø @ 5" C/C 10 Ø @ 7" C/C
. .
SECTION 2-2 SECTION 1-1
1 3 4 6
17'-8" 20'-8.5" 25'-9.5"
2-20 Ø ST. 2-20 Ø ST.
2-20 Ø ext. 3-20 Ø ext. 3-20 Ø ext. 1-25 Ø EXT.
1-25 Ø ext. 1-25 Ø ext. 2 1-25 Ø ext.
1 3-20 Ø EXT.
4'-2" 2-20 Ø st. 5'-0" 5'-6" 2-20 Ø st. 5'-6" 6'-6" 2-20 Ø st. 6'-6" 10Ø@ 7"C/C
20"
20"
10Ø@ 5"C/C
10" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6"
10 Ø @ 5" C/C 10 Ø @ 7" C/C 10 Ø @ 5" C/C 3-20 Ø 3-20 Ø
10 Ø @ 7" C/C 10 Ø @ 5" C/C
12'' 12''
10 Ø @ 5" C/C 2 1 10 Ø @ 5" C/C
3-20 Ø St. 3-20 ØSt. GB-5 GB-5
10 Ø @ 5" C/C 10 Ø @ 7" C/C
. .
SECTION 2-2 SECTION 1-1
I
6'-10"
2
3-20 Ø st. 2-20 Ø st. 3-20 Ø ST.
2-20 Ø ST.
20"
10 Ø @ 5" C/C
10Ø@ 5"C/C
1
3-20 Ø St.. 2
3-20 Ø ST.
PART LONG SECTION OF GB-6(12"X20") 12''
GB-6
SECTION 2-2
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE LONG SECTION OF GRADE BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-15
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
7'-2" 1'-0"
10Ø@4"c/c
9.5"
16Ø@3.5"c/c 16Ø@3.5"c/c L.B
10Ø@6"c/c
"
3'-2
9.5
"
6"
12"
3-20Ø st.
10"
10Ø@6"c/c
16Ø@3.5"c/c 16Ø@3.5"c/c 2-20Ø st.
10Ø@6"c/c "
3'-2
24"
2-12Ø (F.B) NOTE:-
10mm@5"c/c
2-20Ø st. All architectural dimension & Level
shall be confirmed from architectural
G.B 3-25Ø st.
1ST FLIGHT OF STAIR SECTION OF L.B drawing.
(SEC. C-C)
10Ø@4"c/c
16Ø@3.5"c/c
16Ø@3.5"c/c 2'-2
" 10Ø@6"c/c
9.5"
F.B 10"
6"
11'-9" 1'-0"
16Ø@3.5"c/c
3'-8" 10Ø@6"c/c
10Ø@6"c/c 2'-2
16Ø@3.5"c/c " 10Ø@4"c/c
"
9.5
16Ø@3.5"c/c
9.5"
L.B
2ND FLIGHT OF STAIR
(SEC. D-D)
4 6 7
15'-11" 7'-6"
A F.B
C 1'-0"6" 7'-2" C
L.B
14'-5"
13'-4"
F.B
D
DN
D
1'-0" 4'-8" 11'-7"
B F.B
PLAN OF STAIR (2)
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF STAIR DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-16
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
10Ø@6"c/c
16Ø@4"c/c
8"
16Ø@4"c/c L.B
10Ø@6"c/c
"
3'-2
8"
10" 12"
3-25Ø st.
6"
10Ø@6"c/c
16Ø@4"c/c
16Ø@4"c/c 2-20Ø st.
10Ø@6"c/c "
3'-2
24"
10Ø@6"c/c 2-12Ø (F.B)
8"
16Ø@4"c/c
10mm@5"c/c 2-20Ø st.
G.B NOTE:-
3-25Ø st.
SECTION OF L.B All architectural dimension & Level
1ST FLIGHT OF STAIR
(SEC. A-A) shall be confirmed from architectural
drawing.
1'-0"
F.B L.B 3
6'-4"
A UP A
L.B
F.B
14'-4"
15'-8"
1'-0" 10'-6" 6'-2" 1'-0"
B B
DN
1'-0"
16Ø@4"c/c 2'-2
" 10Ø@6"c/c
F.B
8"
16Ø@4"c/c
10Ø@6"c/c 2'-2 10Ø@6"c/c
16Ø@4"c/c " 10Ø@6"c/c
16Ø@4"c/c
8"
L.B
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF STAIR DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-17
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
F.B
10"
10mmØ@ 8" c/c.
5"
5"
10mmØ@ 8" c/c.
10" F.B
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-18
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
1'-6"
F.B-8(1
2 "X24")
10
9
")
2" X24
1(1
7'-1"
-1
F.B-13(12"X24")
F .B
)
24"
2"X
8
F.B-12(12"X24")
1
" )
(
X24
15
12"
8'-11"
F.B-
-11(
F.B
2'-1"
C.B
1'-1"
2'-0"
7
F.B-7(12"X24") F.B-7(12"X24") F.B-7(12"X24")
L.B
7'-6"
F.B-12(12"X24")
F.B-13(12"X24")
)
24"
6
F.B-10(12"X24")
X
12"
F.B-9(12"X24")
15(
F.B-
11'-5"
F.B-5(12"X24") UP
4
F.B-13(15"X24")
F.B-14(12"X24")
UP
F.B-5(12"X24")
L.B
F.B-12(12"X24")
F.B-10(12"X24")
F.B-9(12"X24")
14'-0"
DN
F.B-4
(10"X30") L.B
(10"X30")
(10"X30")
F.B-16
F.B-17
3
4'-11"
F.B-13(12"X24")
2
F.B-10(12"X24")
F.B-9(12"X24")
F.B-2(10"X30") F.B-2(12"X24")
F.B-12(12"X24")
F.B-16(12"X24")
14'-1"
1'-5" 14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 10'-11" 6'-3" 6'-3"
A B C D E F G H I J K
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE 1ST FLOOR BEAM LAYOUT PLAN
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-19
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
A B C D G 2-20 Ø st.
1-20 Ø ext.
2-20 Ø st. 2-20 Ø st. 2-20 Ø ext.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
24"
2-16 Ø (F.B) 10 Ø @ 4" c/c.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-2" 1'-1" 1'-1" 3'-2" 4'-0" 1'-4" 1'-4" 4'-0" 3'-9" 1'-3" 1'-3" 3'-9" 3'-10" 1'-4" 1'-4" 3'-10"
3-20 Ø st.
1 2 12"
SECTION OF 1-1
2-20 Ø st.
1 3-20 Ø st. 2 2-16 Ø F.B.
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0"
24"
1'-8" 12'-8" 1'-0" 15'-11" 1'-0" 14'-10" 1'-0" 15'-4" 2'-0" 10 Ø @ 6" c/c.
2-16 Ø (F.B)
LONG SECTION OF FLOOR BEAM, F.B-1 (SIZE=12" X 24")
12"
3-20 Ø st.
SECTION OF 2-2
G I J
3-20 Ø st.
2-25 Ø st.
10''X30''
12''X24''
3-20 Ø st.
3
2-25 Ø st.
30"
2-16 Ø (F.B) 12 Ø @ 4" c/c.(bondle)
2-25 Ø st.
2-25 Ø st. 3-20 Ø st. 2-16 Ø F.B. 3-20 Ø st.
3 3-20 Ø st. 2-25 Ø st. Ø10@4"c/c 10"
Ø12@4"c/c(bundle)
3'-0" 3'-8" 3'-0" 6'-10" 1'-6" SECTION OF 3-3
A B C D
2-16 Ø st.
1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-1" 1'-1" 1'-1" 3'-1" 3'-10" 1'-4" 1'-4" 3'-10" 3'-7" 1'-3" 1'-3" 3'-7" 2-16 Ø st. 2-16 Ø st.
4 5 1-16 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
4 3-20 Ø st. 5 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 4-4 SECTION OF 5-5
2'-0" 12'-4" 1'-6" 15'-5" 1'-6" 14'-4" 1'-6"
D G I
2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext.
12''X24''
24"
10 Ø @ 4" c/c. 10 Ø @ 4" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
6 2-25+1-20 Ø st. 7 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø12@4"c/c(Bundle) 2-25 Ø ext.
4'-0" 4'-0" 2-25+1-20 Ø st. SECTION OF 6-6 SECTION OF 7-7
1'-3" 15'-1" 3'-0" 3'-8" 3'-0"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-20
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
A B C D E
2-16 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 3-20 Ø st.
2-20 Ø ext. 2-20 Ø ext. 2-16 Ø st.
3-20 Ø st.
3'-4" 1'-2" 1'-2" 3'-4" 4'-1" 1'-4" 5'-5" 2-16 Ø st. 2-16 Ø st.
9 10 1-20 Ø ext. 17
2-16 Ø st.
2-20 Ø ext.
24"
10 Ø @ 4" c/c.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c. 2-16 Ø st.
2-16 Ø (F.B) 2-16 Ø (F.B)
3-20 Ø st.
9 3-20 Ø st. 10 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st. 17 3-20 Ø st. 2-16 Ø st. 12"
Ø10@6"c/c Ø10@6"c/c 12" 12" Ø10@4"c/c
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c SECTION OF 17-17
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 9-9 SECTION OF 10-10
1'-0" 13'-4" 1'-3" 16'-2" 1'-0" 1'-8" 4'-11" 1'-3"
LONG SECTION OF FLOOR BEAM, F.B-5 (SIZE=12" X 24") LONG SECTION OF FLOOR BEAM, F.B-8 (SIZE=12" X 24")
C D H
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-25 Ø ext. 2-25 Ø ext.
3'-7" 1'-3" 1'-3" 3'-7" 5'-1" 1'-8" 1'-8" 5'-1" 2-20 Ø st. 2-20 Ø st.
11 12 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 4" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
11 2-25+1-20 Ø st. 12 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@6"c/c Ø10@4"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 11-11 SECTION OF 12-12
1'-6" 14'-4" 1'-6" 20'-2" 2'-0"
B C D F
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-0" 1'-4" 1'-4" 4'-0" 3'-7" 1'-3" 1'-3" 3'-7" 3'-0" 1'-0" 1'-0" 2'-11" 2-20 Ø st. 2-20 Ø st.
13 14 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
13 2-25+1-20 Ø st. 14 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 13-13 SECTION OF 14-14
1'-0" 15'-11" 1'-6" 14'-4" 1'-6" 11'-9" 2'-0"
1 3 4 6
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-6" 1'-6" 1'-6" 4'-6" 3'-2" 1'-1" 1'-1" 3'-2" 3'-7" 1'-3" 1'-3" 3'-7" 2-20 Ø st. 2-20 Ø st.
18 19 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
18 1-25+2-20 Ø st. 19 2-16 Ø F.B. 1-25+2-20 Ø st. 1-25+2-20 Ø st.
12" 12"
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 18-18 SECTION OF 19-19
1'-0" 18'-0" 1'-0" 12'-6" 2'-0" 14'-4" 1'-8"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-21
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
1 3 4 7
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-25 Ø ext. 1-25 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-25 Ø ext. 2-25 Ø ext.
4'-2" 1'-5" 1'-5" 4'-2" 3'-1" 1'-0" 1'-0" 3'-1" 5'-4" 1'-10" 1'-10" 5'-9" 2-20 Ø st. 2-20 Ø st.
20 21 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
20 3-20 Ø st. 21 2-16 Ø F.B. 2-20 Ø ext. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 20-20 SECTION OF 21-21
2'-0" 16'-9" 1'-6" 12'-3" 2'-0" 21'-5" 2'-0"
B C D
2-16 Ø st.
1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-9" 1'-4" 1'-4" 3'-9" 3'-9" 1'-3" 1'-3" 3'-9" 2-16 Ø st. 2-16 Ø st.
22 23 1-16 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
22 3-20 Ø st. 23 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 22-22 SECTION OF 23-23
1'-0" 15'-11" 1'-0" 14'-10" 1'-3"
2-20 Ø st.
1-20 Ø ext.
2-20 Ø ext.
24"
10 Ø @ 4" c/c.
2-16 Ø (F.B)
1 3 5 7 8
12"
3-20 Ø st.
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. SECTION OF 23'-23'
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-2" 1'-5" 1'-5" 4'-2" 4'-3" 1'-5" 1'-5" 4'-3" 4'-4" 1'-5" 1'-5" 4'-4"
23' 24 2-20 Ø st.
24"
10 Ø @ 6" c/c.
23' 24 2-16 Ø ext. 2-16 Ø (F.B)
3-20 Ø st. 2-16 Ø F.B.
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 12"
3-20 Ø st.
2'-0" 16'-9" 1'-6" 17'-0" 1'-6" 17'-2" 1'-6" 7'-9" 1'-6"
SECTION OF 24-24
LONG SECTION OF FLOOR BEAM, F.B-12 (SIZE=12" X 24")
1 3 5 7 10
2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
12''X24''
15''X24''
4'-3" 1'-5" 1'-5" 4'-3" 4'-4" 1'-5" 1'-5" 4'-4" 4'-2" 1'-5" 1'-5" 4'-2"
25 26
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
12"
3-20 Ø st. 12"
3-20 Ø st.
SECTION OF 25-25 SECTION OF 26-26
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-22
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
5 7 9 2-16 Ø st.
5 1-16 Ø ext.
2-16 Ø st. 2-16 Ø st.
1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext. 2-20 Ø ext.
24"
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 10 Ø @ 4" c/c.
2-16 Ø (F.B)
2-16 Ø st. 4'-5" 1'-6" 1'-6" 4'-5" 3'-10" 1'-4" 1'-4" 3'-10"
27 28 29 12"
3-20 Ø st.
SECTION OF 28-28
24"
2-16 Ø st.
27 3-20 Ø st. 28 29 2-16 Ø st.
3-20 Ø st. 2-16 Ø st. 12" 3-20 Ø st. 2-16 Ø F.B.
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
4'-0" 4'-0" SECTION OF 27-27 4'-0" 4'-0" 4'-0" 4'-0"
1'-0" 14'-4" 1'-0" 1'-0" 17'-8" 1'-0" 15'-5" 1'-0"
24"
10 Ø @ 6" c/c.
LONG SECTION OF FLOOR BEAM, F.B-14 (SIZE=12" X 24") LONG SECTION OF FLOOR BEAM, F.B-15 (SIZE=12" X 24") 2-16 Ø (F.B)
3-20 Ø st.
12"
SECTION OF 29-29
1 2 2
2-25 Ø st. 3-25 Ø st.
1-20 Ø ext. 1-25 Ø ext.
12''X24''
10''X30''
3'-3" 1'-1" 1'-1" 3'-3" 2-25 Ø st. 1-25 Ø ext. 3-25 Ø st.
30 31 1-20 Ø ext. 32
3-25 Ø ext.
2-20 Ø ext. 2-25 Ø st.
30"
24"
30"
10 Ø @ 4" c/c. 2-16 Ø (F.B) 12 Ø @ 4" c/c.(bundle) 12 Ø @ 4" c/c.(bundle)
3-25 Ø ext. 2-16 Ø (F.B) 3-25 Ø ext. 2-16 Ø (F.B) 2-25 Ø st.
3-25 Ø st.
30 2-16 Ø F.B. 3-25 Ø st. 3-25 Ø st. 3-25 Ø st. 32 2-16 Ø F.B. 3-25 Ø st. 2-25 Ø st. 3-25 Ø st.
12" 10" Ø12@4"c/c(bundle) 10"
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c 31
Ø12@4"c/c(bundle)
4'-0" 4'-0" SECTION OF 30-30 SECTION OF 31-31 SECTION OF 32-32
1'-0" 13'-0" 3'-0" 3'-2" 3'-0" 3'-0" 3'-2" 3'-0"
LONG SECTION OF FLOOR BEAM, F.B-16 (SIZE=12" X 24")&(10''x30") LONG SECTION OF FLOOR BEAM, F.B-17 (SIZE=10" X 30")
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-23
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4'-9"
1'-6"
5"
11"
1'-8"
10
10"
9
7'-1"
3'-8"
4'-11"
8
4'-11" 4'-11"
8'-11"
3'-8" 3'-8"
4'-11"
C.B
3'-8"
10"
10"
7
3'-7"
4'-3"
4'-1"
4'-9"
7'-6"
5'-8"
5'-6"
6 5'-6" 5'-6" 4'-9" 4'-9" 5'-8" 5'-8"
5'-8"
4'-9"
4'-3"
3'-7"
L.B
5 DN
5'-6"
4'-6"
4'-1"
3'-7"
4'-9"
7"
UP
1'-3"
4
10"
L.B
3'-2"
3'-2"
4'-2"
4'-2"
1'-3"
4'-2" 4'-2" 4'-2" 4'-2" 4'-9" 4'-9"
14'-0"
1'-0"
3'-2" 3'-2" 3'-2" 3'-2" 3'-7" 3'-7"
DN
L.B
4'-9"
4'-2"
4'-2"
3'-7"
3'-2"
3'-2"
7"
3'-10"
5'-1"
3
6"
4'-11"
3'-4"
3'-9"
4'-0"
4'-5"
4'-11"
5'-4"
1'-8"
7"
2
4'-5" 4'-5" 5'-4" 5'-4" 4'-11" 4'-11" 5'-1" 5'-1"
4'-11"
5'-4"
5'-1"
4'-5"
3'-10"
4'-0"
1'-0"
3'-9"
3'-4"
7" 2'-5"
7"
1
6"
7"
5"
1'-5" 14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 10'-11" 6'-3" 6'-3"
A B C D E F G H I J K
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE 1ST FLOOR SLAB DIMENSION DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-24
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4'-9"
1'-6"
5" NOTE:-
11"
1'-8"
10 (A) 10 mmØ@ 6" c/c. alt ckd
10"
9 (B) 10 mmØ@ 6" c/c. alt ckd
(C) 10 mmØ@ 7" c/c. (T/B)
7'-1"
(1) 1-10 mmØ ext. (Top)
(2) 1-12 mmØ ext. (Top)
8 1 3 (3) 1-12+1-10 mmØ ext.(Top)
3-16Ø st. 1 2
10"
8'-11"
10Ø@ 4"c/c
C.B
10"
10"
6"
3-16Ø st.
7
SECTION OF C.B 2 2 2
7'-6"
6 2 3 3 2
B
A A A
11'-5"
2 1
L.B
5 DN
4'-6"
7"
UP
1'-3"
4
10"
L.B
1 1'-3" 2 C
1 1 2 2
14'-0"
DN
B
L.B
2 2 2
7"
3 2
6"
4'-11"
A 1'-8"
7"
2
1 2 2 2
14'-1"
B B 2 B 1
A
1'-0"
7" 1 1 2'-5"
1 2
7"
1
6"
7"
5"
1'-5" 14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 10'-11" 6'-3" 6'-3"
A B C D E F G H I J K
1ST FLOOR SLAB REINFORCEMENT DETAILS
SLAB THICKNESS=6"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE 1ST FLOOR SLAB REINFORCEMENT DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-25
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
1'-6"
F.B-8(1
2 "X24")
10
9
")
2" X24
1(1
7'-1"
-1
F.B-13(12"X24")
F .B
)
24"
2"X
8
F.B-12(12"X24")
1
" )
(
X24
15
12"
8'-11"
F.B-
-11(
F.B
C.B
7
F.B-7(12"X24") F.B-7(12"X24") F.B-7(12"X24")
L.B
7'-6"
F.B-12(12"X24")
F.B-13(12"X24")
)
24"
6
F.B-10(12"X24")
X
12"
F.B-9(12"X24")
15(
F.B-
11'-5"
F.B-5(12"X24") UP
4
F.B-13(15"X24")
F.B-14(12"X24")
F.B-5(12"X24")
L.B
F.B-12(12"X24")
F.B-10(12"X24")
F.B-9(12"X24")
14'-0"
1'-0"
DN
F.B-4 F.B-4
(10"X30") (12"X30")
F.B-18(12"X24")
F.B-4(12"X24")
(10"X30")
F.B-3(12"X24") F.B-3(12"X24") F.B-3(12"X24")
(10"X30")
F.B-17
F.B-16
3
4'-11"
F.B-13(12"X24")
2
F.B-10(12"X24")
F.B-9(12"X24")
F.B-2(10"X30") F.B-2(12"X24")
F.B-12(12"X24")
F.B-16(12"X24")
14'-1"
1'-5" 14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 10'-11" 6'-3" 6'-6"
A B C D E F G H I J K
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE 3RD FLOOR BEAM LAYOUT PLAN
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-26
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
A B C D G
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-2" 1'-1" 1'-1" 3'-2" 4'-0" 1'-4" 1'-4" 4'-0" 3'-9" 1'-3" 1'-3" 3'-9" 3'-10" 1'-4" 1'-4" 3'-10"
G I J
3-20 Ø st. 3-20 Ø st.
2-25 Ø st. 2-25 Ø st.
10''X30''
12''X24''
3-20 Ø st. 2-20 Ø st. 2-20 Ø st.
3 1-20 Ø ext.
2-25 Ø st. 2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B)
30"
2-16 Ø ext. 2-16 Ø (F.B) 2-16 Ø ext.
2-16 Ø (F.B) 12 Ø @ 4" c/c.(bondle)
3-20 Ø st. 2-25 Ø st. 2-16 Ø F.B. 2-25 Ø st. 3-20 Ø st. 3-20 Ø st.
12" 12"
3 3-20 Ø st. 2-25 Ø st. Ø10@4"c/c
3-20 Ø st.
3-Leg Ø12@3.5"c/c 10" SECTION OF 1-1 SECTION OF 2-2
6'-10" 1'-6"
SECTION OF 3-3
1'-8" 6'-4" 1'-8"
A B C D
2-16 Ø st.
1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-1" 1'-1" 1'-1" 3'-1" 3'-10" 1'-4" 1'-4" 3'-10" 3'-7" 1'-3" 1'-3" 3'-7" 2-16 Ø st. 2-16 Ø st.
4 5 1-16 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
4 3-20 Ø st. 5 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 4-4 SECTION OF 5-5
2'-0" 12'-4" 1'-6" 15'-5" 1'-6" 14'-4" 1'-6"
D G I J
2-25 Ø st. 2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext.
12''X24''
3'-7" 1'-4" 1'-4" 3'-10" 2-25 Ø st. 2-25 Ø st. 2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext.
6 7 7A
24"
2-20 Ø ext. 2-25 Ø ext.
24"
30"
10 Ø @ 4" c/c. 10 Ø @ 4" c/c. 12 Ø @ 4" c/c(bundle).
2-16 Ø (F.B) 2-16 Ø (F.B) 2-16 Ø (F.B) 2-25 Ø st.
6 2-25+1-20 Ø st. 7 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø12@4"c/c(Bundle) 7A 2-25 Ø st. Ø12@4"c/c(bundle) 12" 12"
12"
2-25+1-20 Ø st.
4'-0" 4'-0" 2-25+1-20 Ø st. SECTION OF 6-6 SECTION OF 7-7
1'-3" 15'-1" 3'-0" 3'-8" 3'-0" 7'-4" 1'-0" SECTION OF 7A-7A
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-27
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
A B C D E
2-16 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 3-20 Ø st.
2-20 Ø ext. 2-20 Ø ext. 2-16 Ø st.
3-20 Ø st.
3'-4" 1'-2" 1'-2" 3'-4" 4'-1" 1'-4" 5'-5" 2-16 Ø st. 2-16 Ø st.
9 10 1-20 Ø ext. 17
2-16 Ø st.
2-20 Ø ext.
24"
10 Ø @ 4" c/c.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c. 2-16 Ø st.
2-16 Ø (F.B) 2-16 Ø (F.B)
3-20 Ø st.
9 3-20 Ø st. 10 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st. 17 3-20 Ø st. 2-16 Ø st. 12"
Ø10@6"c/c Ø10@6"c/c 12" 12" Ø10@4"c/c
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c SECTION OF 17-17
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 9-9 SECTION OF 10-10
1'-0" 13'-4" 1'-3" 16'-2" 1'-0" 1'-8" 4'-11" 1'-3"
LONG SECTION OF FLOOR BEAM, F.B-5 (SIZE=12" X 24") LONG SECTION OF FLOOR BEAM, F.B-8 (SIZE=12" X 24")
C D H
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-25 Ø ext. 2-25 Ø ext.
3'-7" 1'-3" 1'-3" 3'-7" 5'-1" 1'-8" 1'-8" 5'-1" 2-20 Ø st. 2-20 Ø st.
11 12 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 4" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
11 2-25+1-20 Ø st. 12 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@6"c/c Ø10@4"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 11-11 SECTION OF 12-12
1'-6" 14'-4" 1'-6" 20'-2" 2'-0"
B C D F
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-0" 1'-4" 1'-4" 4'-0" 3'-7" 1'-3" 1'-3" 3'-7" 3'-0" 1'-0" 1'-0" 2'-11" 2-20 Ø st. 2-20 Ø st.
13 14 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
13 2-25+1-20 Ø st. 14 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 13-13 SECTION OF 14-14
1'-0" 15'-11" 1'-6" 14'-4" 1'-6" 11'-9" 2'-0"
1 3 4 6
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-6" 1'-6" 1'-6" 4'-6" 3'-2" 1'-1" 1'-1" 3'-2" 3'-7" 1'-3" 1'-3" 3'-7" 2-20 Ø st. 2-20 Ø st.
18 19 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
18 1-25+2-20 Ø st. 19 2-16 Ø F.B. 1-25+2-20 Ø st. 1-25+2-20 Ø st.
12" 12"
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 18-18 SECTION OF 19-19
1'-0" 18'-0" 1'-0" 12'-6" 2'-0" 14'-4" 1'-8"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-28
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
1 3 4 7
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-25 Ø ext. 1-25 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-25 Ø ext. 2-25 Ø ext.
4'-2" 1'-5" 1'-5" 4'-2" 3'-1" 1'-0" 1'-0" 3'-1" 5'-4" 1'-10" 1'-10" 5'-9" 2-20 Ø st. 2-20 Ø st.
20 21 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
20 3-20 Ø st. 21 2-16 Ø F.B. 2-20 Ø ext. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 20-20 SECTION OF 21-21
2'-0" 16'-9" 1'-6" 12'-3" 2'-0" 21'-5" 2'-0"
B C D
2-16 Ø st.
1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-9" 1'-4" 1'-4" 3'-9" 3'-9" 1'-3" 1'-3" 3'-9" 2-16 Ø st. 2-16 Ø st.
22 23 1-16 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
22 3-20 Ø st. 23 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 22-22 SECTION OF 23-23
1'-0" 15'-11" 1'-0" 14'-10" 1'-3"
2-20 Ø st.
1-20 Ø ext.
2-20 Ø ext.
24"
10 Ø @ 4" c/c.
2-16 Ø (F.B)
1 3 5 7 8
12"
3-20 Ø st.
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. SECTION OF 23'-23'
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-2" 1'-5" 1'-5" 4'-2" 4'-3" 1'-5" 1'-5" 4'-3" 4'-4" 1'-5" 1'-5" 4'-4"
23' 24 2-20 Ø st.
24"
10 Ø @ 6" c/c.
23' 24 2-16 Ø ext. 2-16 Ø (F.B)
3-20 Ø st. 2-16 Ø F.B.
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 12"
3-20 Ø st.
2'-0" 16'-9" 1'-6" 17'-0" 1'-6" 17'-2" 1'-6" 7'-9" 1'-6"
SECTION OF 24-24
LONG SECTION OF FLOOR BEAM, F.B-12 (SIZE=12" X 24")
1 3 5 7 10
2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
12''X24''
15''X24''
4'-3" 1'-5" 1'-5" 4'-3" 4'-4" 1'-5" 1'-5" 4'-4" 4'-2" 1'-5" 1'-5" 4'-2"
25 26
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
12"
3-20 Ø st. 12"
3-20 Ø st.
SECTION OF 25-25 SECTION OF 26-26
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-29
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
5 7 9 2-16 Ø st.
5 1-16 Ø ext.
2-16 Ø st. 2-16 Ø st.
1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext. 2-20 Ø ext.
24"
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 10 Ø @ 4" c/c.
2-16 Ø (F.B)
2-16 Ø st. 4'-5" 1'-6" 1'-6" 4'-5" 3'-10" 1'-4" 1'-4" 3'-10"
27 28 29 12"
3-20 Ø st.
SECTION OF 28-28
24"
2-16 Ø st.
27 3-20 Ø st. 28 29 2-16 Ø st.
3-20 Ø st. 2-16 Ø st. 12" 3-20 Ø st. 2-16 Ø F.B.
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
4'-0" 4'-0" SECTION OF 27-27 4'-0" 4'-0" 4'-0" 4'-0"
1'-0" 14'-4" 1'-0" 1'-0" 17'-8" 1'-0" 15'-5" 1'-0"
24"
10 Ø @ 6" c/c.
LONG SECTION OF FLOOR BEAM, F.B-14 (SIZE=12" X 24") LONG SECTION OF FLOOR BEAM, F.B-15 (SIZE=12" X 24") 2-16 Ø (F.B)
3-20 Ø st.
12"
SECTION OF 29-29
1 2 2
2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext. 3-25 Ø st.
12''X24''
10''X30''
3'-3" 1'-1" 1'-1" 3'-3" 2-25 Ø st. 1-25 Ø ext. 3-25 Ø st.
30 31 1-20 Ø ext. 32
3-25 Ø ext.
2-20 Ø ext. 2-25 Ø st.
30"
24"
30"
10 Ø @ 4" c/c. 2-16 Ø (F.B) 12 Ø @ 4" c/c.(bundle) 12 Ø @ 4" c/c.(bundle)
3-25 Ø st. 3-25 Ø st. 2-16 Ø (F.B) 3-25 Ø st. 2-16 Ø (F.B) 2-25 Ø st.
30 2-16 Ø F.B. 3-25 Ø st. 3-25 Ø st. 3-25 Ø st. 2-16 Ø F.B. 32 3-25 Ø st. 2-25 Ø st. 3-25 Ø st.
31 12" 10" Ø12@4"c/c(bundle) 10"
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
Ø12@4"c/c(bundle)
4'-0" 4'-0" SECTION OF 30-30 SECTION OF 31-31 SECTION OF 32-32
1'-0" 13'-0" 3'-0" 3'-2" 3'-0" 3'-0" 3'-2" 3'-0"
LONG SECTION OF FLOOR BEAM, F.B-16 (SIZE=12" X 24")&(10''x30") LONG SECTION OF FLOOR BEAM, F.B-17 (SIZE=10" X 30")
2
3-20 Ø st.
2-16 Ø st.
3-20 Ø st.
33
2-16 Ø st.
24"
10 Ø @ 4" c/c.
2-16 Ø (F.B)
33 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@4"c/c 12"
SECTION OF 33-33
1'-0" 7'-2" 1'-0"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-30
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4'-9"
1'-6"
5"
11"
1'-8"
10
10"
9
7'-1"
3'-8"
4'-11"
8
1'-3"
4'-11" 4'-11"
8'-11"
3'-8" 3'-8"
4'-11"
C.B
3'-8"
10"
10"
7
3'-7"
4'-3"
4'-1"
4'-9"
7'-6"
5'-8"
5'-6"
6 5'-6" 5'-6" 4'-9" 4'-9" 5'-8" 5'-8"
5'-8"
4'-9"
4'-3"
3'-7"
L.B
5 DN
5'-6"
4'-6"
4'-1"
1'-0"
3'-7"
4'-9"
1'-0"
UP
1'-3"
4
2'-3"
7" 1'-3"
10"
L.B
3'-2"
3'-2"
4'-2"
4'-2"
4'-2" 4'-2" 4'-2" 4'-2" 4'-9" 4'-9"
14'-0"
1'-0"
3'-2" 3'-2" 3'-2" 3'-2" 3'-7" 3'-7"
DN
5'-0"
4'-9"
4'-2"
4'-2"
3'-7"
3'-2"
3'-2"
3'-10"
7"
5'-1"
3
8'-4"
6"
4'-11"
3'-4"
3'-9"
4'-0"
4'-5"
4'-11"
5'-4"
1'-8"
4'-3"
7"
2
26'-6"
4'-1"
C.S
4'-5" 4'-5" 5'-4" 5'-4" 4'-11" 4'-11" 5'-1" 5'-1"
14'-1"
6'-6"
M.S
3'-4" 3'-4" 4'-0" 4'-0" 3'-9" 3'-9" 3'-10" 3'-10"
4'-11"
5'-4"
5'-1"
4'-5"
3'-10"
4'-0"
1'-0"
3'-9"
3'-4"
7" 2'-5"
7"
6'-9"
C.S
1
6"
7"
2'-6"
5"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE 2ND FLOOR SLAB DIMENSION DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-31
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4'-9"
1'-6"
5" NOTE:-
11"
1'-8"
10 (A) 10 mmØ@ 6" c/c. alt ckd
10"
9 (B) 10 mmØ@ 6" c/c. alt ckd
(C) 10 mmØ@ 7" c/c. (T/B)
7'-1"
(D) 12 mmØ@ 8" c/c.
(E) 12 mmØ@ 5'' c/c.
8 1 3 (1) 1-10 mmØ ext. (Top)
3-16Ø st. 1 2 (2) 1-12 mmØ ext. (Top)
10"
8'-11"
(3) 1-16+1-12 mmØ ext.(Top)
10Ø@ 4"c/c (4) 2-16 mmØ ext.(Top).
C.B
6"
3-16Ø st.
7
SECTION OF C.B 2 2 2
7'-6"
6 2 3 3 2
B
A A A
11'-5"
2 1
L.B
5 DN
4'-6"
1'-0"
UP
2'-3" 1'-0"
4
1'-3"
10"
L.B
1 2 C
1 1 2 2
14'-0"
1'-0"
DN
B
2 2 2
3 2 C
4'-11"
C
A 4'-3"
2
26'-6"
3 D 4
4'-1"
C.S
1 2 2 2 4 D 3
D D
14'-1"
B B 2 B 2 1'-1"
6'-6"
M.S
A
D TH=7.5''
D
3
1'-0"
7" 1 1 1 1
4 4
6'-9"
C.S
1 D
6"
7" D 3
5"
2'-6"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE 2ND FLOOR SLAB REINFORCEMENT DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-32
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4'-9"
1'-6"
NOTE:-
10 (A) 10 mmØ@ 6" c/c. alt ckd
9 (B) 10 mmØ@ 6" c/c. alt ckd
(C) 10 mmØ@ 7" c/c. (T/B)
7'-1"
(D) 12 mmØ@ 8" c/c.
(E) 12 mmØ@ 5'' c/c.
8 1 3 (1) 1-10 mmØ ext. (Top)
3-16Ø st. 1 2 (2) 1-12 mmØ ext. (Top)
10"
8'-11"
(3) 1-16+1-12 mmØ ext.(Top)
10Ø@ 4"c/c (4) 2-16 mmØ ext.(Top).
C.B
6"
3-16Ø st.
7
SECTION OF C.B 2 2 2
7'-6"
6 2 3 3 2
B
A A A
11'-5"
2 1
L.B
5 DN
4'-6"
UP
4
L.B
1 2 C
1 1 2 2
14'-0"
DN
B
2 2 2
3 2 C
4'-11"
C
A 4'-3"
2
E
4'-1"
C.S
1 2 2 2
D TH=7.5''
14'-1"
B B 2 B 2
6'-6"
M.S
A
E D E
1 1 1 1
6'-9"
C.S
1 E
5"
2'-6"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE 2ND FLOOR SLAB REINFORCEMENT DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-33
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
1'-6"
F.B-8(1
2 "X24")
10
9
")
2" X24
1(1
7'-1"
-1
F.B-13(12"X24")
F .B
)
24"
2"X
8
F.B-12(12"X24")
1
" )
(
X24
15
12"
8'-11"
F.B-
-11(
F.B
C.B
7
F.B-7(12"X24") F.B-7(12"X24") F.B-7(12"X24")
L.B
7'-6"
F.B-12(12"X24")
F.B-13(12"X24")
)
24"
6
F.B-10(12"X24")
X
12"
F.B-9(12"X24")
15(
F.B-
11'-5"
F.B-5(12"X24") UP
4
F.B-13(15"X24")
F.B-14(12"X24")
F.B-5(12"X24")
L.B
F.B-12(12"X24")
F.B-10(12"X24")
F.B-9(12"X24")
14'-0"
1'-0"
DN
F.B-4 F.B-4
(10"X30") (12"X30")
F.B-18(12"X24")
F.B-4(12"X24")
(10"X30")
F.B-3(12"X24") F.B-3(12"X24") F.B-3(12"X24")
(10"X30")
F.B-17
F.B-16
3
4'-11"
F.B-13(12"X24")
2
F.B-10(12"X24")
F.B-9(12"X24")
F.B-2(10"X30") F.B-2(12"X24")
F.B-12(12"X24")
)
F.B-16(12"X24")
24" "X
14'-1"
(12
-19
F.B
F.B-1(12"X24") F.B-1(12"X24") F.B-1(12"X24") F.B-1(12"X24") F.B-1(12"X24")
1
5"
1'-5" 14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 10'-11" 6'-3" 6'-6"
A B C D E F G H I J K
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE TYPICAL FLOOR BEAM LAYOUT PLAN
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-34
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
A B C D G
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-2" 1'-1" 1'-1" 3'-2" 4'-0" 1'-4" 1'-4" 4'-0" 3'-9" 1'-3" 1'-3" 3'-9" 3'-10" 1'-4" 1'-4" 3'-10" 11"
G K G I J
2-20 Ø st. 3-20 Ø st. 3-20 Ø st.
1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-25 Ø st. 2-25 Ø st.
10''X30''
12''X24''
5'-2" 1'-9" 1'-9" 5'-2" 2-20 Ø st. 2-20 Ø st. 3-20 Ø st.
2 1 1-20 Ø ext. 3
2-20 Ø ext. 2-25 Ø st.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B)
30"
2-16 Ø ext. 2-16 Ø (F.B) 2-16 Ø ext. 2-16 Ø (F.B) 12 Ø @ 4" c/c.(bondle)
3-20 Ø st. 2-16 Ø ext. 2 2-16 Ø F.B. 1 3-20 Ø st. 3-20 Ø st. 3-20 Ø st. 2-25 Ø st. 2-16 Ø F.B. 2-25 Ø st.
12" 12"
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c 3 3-20 Ø st. 2-25 Ø st. Ø10@4"c/c
3-20 Ø st.
4'-0" 4'-0" SECTION OF 1-1 SECTION OF 2-2 3-Leg Ø12@3.5"c/c 10"
10" 2'-0" 20'-6" 2'-0" 6'-10" 1'-6"
SECTION OF 3-3
LONG SECTION OF FLOOR BEAM, F.B-1 (SIZE=12" X 24") PART-2 1'-8" 6'-4" 1'-8"
A B C D
2-16 Ø st.
1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-1" 1'-1" 1'-1" 3'-1" 3'-10" 1'-4" 1'-4" 3'-10" 3'-7" 1'-3" 1'-3" 3'-7" 2-16 Ø st. 2-16 Ø st.
4 5 1-16 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
4 3-20 Ø st. 5 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 4-4 SECTION OF 5-5
2'-0" 12'-4" 1'-6" 15'-5" 1'-6" 14'-4" 1'-6"
D G I J
2-25 Ø st. 2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext.
12''X24''
3'-7" 1'-4" 1'-4" 3'-10" 2-25 Ø st. 2-25 Ø st. 2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext.
6 7 7A
24"
2-20 Ø ext. 2-25 Ø ext.
24"
30"
10 Ø @ 4" c/c. 10 Ø @ 4" c/c. 12 Ø @ 4" c/c(bundle).
2-16 Ø (F.B) 2-16 Ø (F.B) 2-16 Ø (F.B) 2-25 Ø st.
6 2-25+1-20 Ø st. 7 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø12@4"c/c(Bundle) 7A 2-25 Ø st. Ø12@4"c/c(bundle) 12" 12"
12"
2-25+1-20 Ø st.
4'-0" 4'-0" 2-25+1-20 Ø st. SECTION OF 6-6 SECTION OF 7-7
1'-3" 15'-1" 3'-0" 3'-8" 3'-0" 7'-4" 1'-0" SECTION OF 7A-7A
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-35
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
A B C D E
2-16 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 3-20 Ø st.
2-20 Ø ext. 2-20 Ø ext. 2-16 Ø st.
3-20 Ø st.
3'-4" 1'-2" 1'-2" 3'-4" 4'-1" 1'-4" 5'-5" 2-16 Ø st. 2-16 Ø st.
9 10 1-20 Ø ext. 17
2-16 Ø st.
2-20 Ø ext.
24"
10 Ø @ 4" c/c.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c. 2-16 Ø st.
2-16 Ø (F.B) 2-16 Ø (F.B)
3-20 Ø st.
9 3-20 Ø st. 10 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st. 17 3-20 Ø st. 2-16 Ø st. 12"
Ø10@6"c/c Ø10@6"c/c 12" 12" Ø10@4"c/c
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c SECTION OF 17-17
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 9-9 SECTION OF 10-10
1'-0" 13'-4" 1'-3" 16'-2" 1'-0" 1'-8" 4'-11" 1'-3"
LONG SECTION OF FLOOR BEAM, F.B-5 (SIZE=12" X 24") LONG SECTION OF FLOOR BEAM, F.B-8 (SIZE=12" X 24")
C D H
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-25 Ø ext. 2-25 Ø ext.
3'-7" 1'-3" 1'-3" 3'-7" 5'-1" 1'-8" 1'-8" 5'-1" 2-20 Ø st. 2-20 Ø st.
11 12 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 4" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
11 2-25+1-20 Ø st. 12 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@6"c/c Ø10@4"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 11-11 SECTION OF 12-12
1'-6" 14'-4" 1'-6" 20'-2" 2'-0"
B C D F
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-0" 1'-4" 1'-4" 4'-0" 3'-7" 1'-3" 1'-3" 3'-7" 3'-0" 1'-0" 1'-0" 2'-11" 2-20 Ø st. 2-20 Ø st.
13 14 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
13 2-25+1-20 Ø st. 14 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 13-13 SECTION OF 14-14
1'-0" 15'-11" 1'-6" 14'-4" 1'-6" 11'-9" 2'-0"
1 3 4 6
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-6" 1'-6" 1'-6" 4'-6" 3'-2" 1'-1" 1'-1" 3'-2" 3'-7" 1'-3" 1'-3" 3'-7" 2-20 Ø st. 2-20 Ø st.
18 19 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
18 1-25+2-20 Ø st. 19 2-16 Ø F.B. 1-25+2-20 Ø st. 1-25+2-20 Ø st.
12" 12"
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 18-18 SECTION OF 19-19
1'-0" 18'-0" 1'-0" 12'-6" 2'-0" 14'-4" 1'-8"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-36
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
1 3 4 7
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-25 Ø ext. 1-25 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 3-25 Ø ext. 3-25 Ø ext.
4'-2" 1'-5" 1'-5" 4'-2" 3'-1" 1'-0" 1'-0" 3'-1" 5'-4" 1'-10" 1'-10" 5'-9" 2-20 Ø st. 2-20 Ø st.
20 21 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
20 3-20 Ø st. 21 2-16 Ø F.B. 2-25 Ø ext. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø12@6"c/c(bundle) 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø12@4"c/c(bundle) Ø12@4"c/c(bundle)
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 20-20 SECTION OF 21-21
2'-0" 16'-9" 1'-6" 12'-3" 2'-0" 21'-5" 2'-0"
B C D
2-16 Ø st.
1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-9" 1'-4" 1'-4" 3'-9" 3'-9" 1'-3" 1'-3" 3'-9" 2-16 Ø st. 2-16 Ø st.
22 23 1-16 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
22 3-20 Ø st. 23 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 22-22 SECTION OF 23-23
1'-0" 15'-11" 1'-0" 14'-10" 1'-3"
2-20 Ø st.
1-20 Ø ext.
2-20 Ø ext.
24"
10 Ø @ 4" c/c.
2-16 Ø (F.B)
1 3 5 7 8
12"
3-20 Ø st.
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. SECTION OF 23'-23'
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-2" 1'-5" 1'-5" 4'-2" 4'-3" 1'-5" 1'-5" 4'-3" 4'-4" 1'-5" 1'-5" 4'-4"
23' 24 2-20 Ø st.
24"
10 Ø @ 6" c/c.
23' 24 2-16 Ø ext. 2-16 Ø (F.B)
3-20 Ø st. 2-16 Ø F.B.
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 12"
3-20 Ø st.
2'-0" 16'-9" 1'-6" 17'-0" 1'-6" 17'-2" 1'-6" 7'-9" 1'-6"
SECTION OF 24-24
LONG SECTION OF FLOOR BEAM, F.B-12 (SIZE=12" X 24")
1 3 5 7 10
2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
12''X24''
15''X24''
4'-3" 1'-5" 1'-5" 4'-3" 4'-4" 1'-5" 1'-5" 4'-4" 4'-2" 1'-5" 1'-5" 4'-2"
25 26
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
12"
3-20 Ø st. 12"
3-20 Ø st.
SECTION OF 25-25 SECTION OF 26-26
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-37
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
5 7 9 2-16 Ø st.
5 1-20 Ø ext.
2-16 Ø st. 2-16 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 2-20 Ø ext.
24"
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 10 Ø @ 4" c/c.
2-16 Ø (F.B)
2-16 Ø st. 4'-5" 1'-6" 1'-6" 4'-5" 3'-10" 1'-4" 1'-4" 3'-10"
27 28 29 12"
3-20 Ø st.
SECTION OF 28-28
24"
2-16 Ø st.
27 3-20 Ø st. 28 29 2-16 Ø st.
3-20 Ø st. 2-16 Ø st. 12" 3-20 Ø st. 2-16 Ø F.B.
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
4'-0" 4'-0" SECTION OF 27-27 4'-0" 4'-0" 4'-0" 4'-0"
1'-0" 14'-4" 1'-0" 1'-0" 17'-8" 1'-0" 15'-5" 1'-0"
24"
10 Ø @ 6" c/c.
LONG SECTION OF FLOOR BEAM, F.B-14 (SIZE=12" X 24") LONG SECTION OF FLOOR BEAM, F.B-15 (SIZE=12" X 24") 2-16 Ø (F.B)
3-20 Ø st.
12"
SECTION OF 29-29
1 2 2
2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext. 3-25 Ø st.
12''X24''
10''X30''
3'-3" 1'-1" 1'-1" 3'-3" 2-25 Ø st. 1-25 Ø ext. 3-25 Ø st.
30 31 1-20 Ø ext. 32
3-25 Ø ext.
2-20 Ø ext. 2-25 Ø st.
30"
24"
30"
10 Ø @ 4" c/c. 2-16 Ø (F.B) 12 Ø @ 4" c/c.(bundle) 12 Ø @ 4" c/c.(bundle)
3-25 Ø st. 3-25 Ø st. 2-16 Ø (F.B) 3-25 Ø st. 2-16 Ø (F.B) 2-25 Ø st.
30 2-16 Ø F.B. 3-25 Ø st. 3-25 Ø st. 3-25 Ø st. 2-16 Ø F.B. 32 3-25 Ø st. 2-25 Ø st. 3-25 Ø st.
31 12" 10" Ø12@4"c/c(bundle) 10"
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
Ø12@4"c/c(bundle)
4'-0" 4'-0" SECTION OF 30-30 SECTION OF 31-31 SECTION OF 32-32
1'-0" 13'-0" 3'-0" 3'-2" 3'-0" 3'-0" 3'-2" 3'-0"
LONG SECTION OF FLOOR BEAM, F.B-16 (SIZE=12" X 24")&(10''x30") LONG SECTION OF FLOOR BEAM, F.B-17 (SIZE=10" X 30")
2 1 2
3-20 Ø st.
2-16 Ø st. 2-16 Ø st.
1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext.
3-20 Ø st. 3'-3" 3'-3"
1'-1" 1'-1"
33 2-16 Ø st. 2-16 Ø st.
34 35 1-20 Ø ext.
2-16 Ø st.
24"
24"
24"
2-16 Ø (F.B) 10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
33 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@4"c/c 12" 34 2-16 Ø F.B. 35 3-20 Ø st. 3-20 Ø st. 3-20 Ø st.
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c 12" 12"
SECTION OF 33-33
1'-0" 7'-2" 1'-0" 4'-0" 4'-0"
1'-0" 13'-0" 1'-0" SECTION OF 34-34 SECTION OF 35-35
LONG SECTION OF FLOOR BEAM, F.B-18 (SIZE=12" X 24")
LONG SECTION OF FLOOR BEAM, F.B-19 (SIZE=12" X 24")
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-38
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4'-9"
1'-6"
5"
11"
1'-8"
10
10"
9
7'-1"
3'-8"
4'-11"
8
1'-3"
4'-11" 4'-11"
8'-11"
3'-8" 3'-8"
4'-11"
C.B
3'-8"
10"
10"
7
3'-7"
4'-3"
4'-1"
4'-9"
7'-6"
5'-8"
5'-6"
6 5'-6" 5'-6" 4'-9" 4'-9" 5'-8" 5'-8"
5'-8"
4'-9"
4'-3"
3'-7"
L.B
5 DN
5'-6"
4'-6"
4'-1"
1'-0"
3'-7"
4'-9"
1'-0"
UP
1'-3"
4
2'-3"
7" 1'-3"
10"
L.B
3'-2"
3'-2"
4'-2"
4'-2"
4'-2" 4'-2" 4'-2" 4'-2" 4'-9" 4'-9"
14'-0"
1'-0"
3'-2" 3'-2" 3'-2" 3'-2" 3'-7" 3'-7"
DN
5'-0"
4'-9"
4'-2"
4'-2"
3'-7"
3'-2"
3'-2"
3'-10"
7"
5'-1"
3
8'-4"
6"
4'-11"
3'-4"
3'-9"
4'-0"
4'-5"
4'-11"
5'-4"
1'-8"
4'-3"
7"
2
26'-6"
3'-3"
4'-4"
4'-5" 4'-5" 5'-4" 5'-4" 4'-11" 4'-11" 5'-1" 5'-1" 4'-4" 4'-4"
14'-1"
3'-4" 3'-4" 4'-0" 4'-0" 3'-9" 3'-9" 3'-10" 3'-10" 3'-3" 3'-3"
4'-11"
5'-4"
5'-1"
4'-5"
4'-4"
3'-10"
4'-0"
1'-0"
3'-9"
3'-4"
3'-3"
7" 2'-5"
7"
3'-11"
1
6"
7"
2'-6"
5"
1'-5" 14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 2'-11" 8'-0" 6'-3" 6'-6"
A B C D E F G H I J K
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE TYPICAL FLOOR SLAB DIMENSION DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-39
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4'-9"
1'-6"
5" NOTE:-
11"
1'-8"
10 (A) 10 mmØ@ 6" c/c. alt ckd
10"
9 (B) 10 mmØ@ 6" c/c. alt ckd
(C) 10 mmØ@ 7" c/c. (T/B)
7'-1"
(1) 1-10 mmØ ext. (Top)
(2) 1-12 mmØ ext. (Top)
8 1 3 (3) 1-12+1-10 mmØ ext.(Top)
3-16Ø st. 1 2
10"
8'-11"
10Ø@ 4"c/c
C.B
10"
10"
6"
3-16Ø st.
7
SECTION OF C.B 2 2 2
7'-6"
6 2 3 3 2
B
A A A
11'-5"
2 1
2'-11"L.B
5 DN
4'-6"
UP
4
L.B
1 2 C
1 1 2 2
14'-0"
DN
B
2 2 2
7"
3 2 C
6"
4'-11"
C
A 1'-8"
4'-3"
7"
2
1 2 2 2 1
14'-1"
B B 2 B 2 B 2
A A C
1'-0"
7" 1 1 2'-5"
1 1 2
7"
1
C
6"
7"
5"
2'-6"
1'-5" 14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 8'-0" 6'-3" 6'-6"
A B C D E F G H I J K
TYPICAL FLOOR SLAB REINFORCEMENT DETAILS
SLAB THICKNESS=6"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE TYPICAL FLOOR SLAB REINFORCEMENT DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-40
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
1'-6"
F.B-8(1
2 "X24")
10
9
")
2" X24
1(1
7'-1"
-1
F.B-13(12"X24")
F .B
)
24"
2"X
8
F.B-12(12"X24")
1
" )
(
X24
15
12"
8'-11"
F.B-
-11(
F.B
C.B
7
F.B-7(12"X24") F.B-7(12"X24") F.B-7(12"X24")
L.B
7'-6"
F.B-12(12"X24")
F.B-13(12"X24")
)
24"
6
F.B-10(12"X24")
X
12"
F.B-9(12"X24")
15(
F.B-
11'-5"
F.B-5(12"X24") UP
4
F.B-13(15"X24")
F.B-14(12"X24")
F.B-5(12"X24")
L.B
F.B-12(12"X24")
F.B-10(12"X24")
F.B-9(12"X24")
14'-0"
1'-0"
DN
F.B-4 F.B-4
(10"X30") (12"X30")
F.B-18(12"X24")
F.B-4(12"X24")
(10"X30")
F.B-3(12"X24") F.B-3(12"X24") F.B-3(12"X24")
(10"X30")
F.B-17
F.B-16
3
4'-11"
F.B-13(12"X24")
2
F.B-10(12"X24")
F.B-9(12"X24")
F.B-2(10"X30") F.B-2(12"X24")
F.B-12(12"X24")
F.B-16(12"X24")
14'-1"
1'-5" 14'-5" 16'-10" 15'-10" 6'-9" 7'-3" 2'-11" 5'-4" 10'-11" 6'-3" 6'-0"
A B C D E F G H I J K
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE ROOF FLOOR BEAM LAYOUT PLAN
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-41
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
A B C D G
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-2" 1'-1" 1'-1" 3'-2" 4'-0" 1'-4" 1'-4" 4'-0" 3'-9" 1'-3" 1'-3" 3'-9" 3'-10" 1'-4" 1'-4" 3'-10"
G I J
3-20 Ø st. 3-20 Ø st.
2-25 Ø st. 2-25 Ø st.
10''X30''
12''X24''
3-20 Ø st. 2-20 Ø st. 2-20 Ø st.
3 1-20 Ø ext.
2-25 Ø st. 2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B)
30"
2-16 Ø ext. 2-16 Ø (F.B) 2-16 Ø ext.
2-16 Ø (F.B) 12 Ø @ 4" c/c.(bondle)
3-20 Ø st. 2-25 Ø st. 2-16 Ø F.B. 2-25 Ø st. 3-20 Ø st. 3-20 Ø st.
12" 12"
3 3-20 Ø st. 2-25 Ø st. Ø10@4"c/c
3-20 Ø st.
3-Leg Ø12@3.5"c/c 10" SECTION OF 1-1 SECTION OF 2-2
6'-10" 1'-6"
SECTION OF 3-3
1'-8" 6'-4" 1'-8"
A B C D
2-16 Ø st.
1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-1" 1'-1" 1'-1" 3'-1" 3'-10" 1'-4" 1'-4" 3'-10" 3'-7" 1'-3" 1'-3" 3'-7" 2-16 Ø st. 2-16 Ø st.
4 5 1-16 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
4 3-20 Ø st. 5 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 4-4 SECTION OF 5-5
2'-0" 12'-4" 1'-6" 15'-5" 1'-6" 14'-4" 1'-6"
D G I J
2-25 Ø st. 2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext.
12''X24''
3'-7" 1'-4" 1'-4" 3'-10" 2-25 Ø st. 2-25 Ø st. 2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext.
6 7 7A
24"
2-20 Ø ext. 2-25 Ø ext.
24"
30"
10 Ø @ 4" c/c. 10 Ø @ 4" c/c. 12 Ø @ 4" c/c(bundle).
2-16 Ø (F.B) 2-16 Ø (F.B) 2-16 Ø (F.B) 2-25 Ø st.
6 2-25+1-20 Ø st. 7 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø12@4"c/c(Bundle) 7A 2-25 Ø st. Ø12@4"c/c(bundle) 12" 12"
12"
2-25+1-20 Ø st.
4'-0" 4'-0" 2-25+1-20 Ø st. SECTION OF 6-6 SECTION OF 7-7
1'-3" 15'-1" 3'-0" 3'-8" 3'-0" 7'-4" 1'-0" SECTION OF 7A-7A
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-42
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
A B C D E
2-16 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 3-20 Ø st.
2-20 Ø ext. 2-20 Ø ext. 2-16 Ø st.
3-20 Ø st.
3'-4" 1'-2" 1'-2" 3'-4" 4'-1" 1'-4" 5'-5" 2-16 Ø st. 2-16 Ø st.
9 10 1-20 Ø ext. 17
2-16 Ø st.
2-20 Ø ext.
24"
10 Ø @ 4" c/c.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c. 2-16 Ø st.
2-16 Ø (F.B) 2-16 Ø (F.B)
3-20 Ø st.
9 3-20 Ø st. 10 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st. 17 3-20 Ø st. 2-16 Ø st. 12"
Ø10@6"c/c Ø10@6"c/c 12" 12" Ø10@4"c/c
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c SECTION OF 17-17
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 9-9 SECTION OF 10-10
1'-0" 13'-4" 1'-3" 16'-2" 1'-0" 1'-8" 4'-11" 1'-3"
LONG SECTION OF FLOOR BEAM, F.B-5 (SIZE=12" X 24") LONG SECTION OF FLOOR BEAM, F.B-8 (SIZE=12" X 24")
C D H
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-25 Ø ext. 2-25 Ø ext.
3'-7" 1'-3" 1'-3" 3'-7" 5'-1" 1'-8" 1'-8" 5'-1" 2-20 Ø st. 2-20 Ø st.
11 12 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 4" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
11 2-25+1-20 Ø st. 12 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@6"c/c Ø10@4"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 11-11 SECTION OF 12-12
1'-6" 14'-4" 1'-6" 20'-2" 2'-0"
B C D F
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-0" 1'-4" 1'-4" 4'-0" 3'-7" 1'-3" 1'-3" 3'-7" 3'-0" 1'-0" 1'-0" 2'-11" 2-20 Ø st. 2-20 Ø st.
13 14 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
13 2-25+1-20 Ø st. 14 2-16 Ø F.B. 2-25+1-20 Ø st. 2-25+1-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 13-13 SECTION OF 14-14
1'-0" 15'-11" 1'-6" 14'-4" 1'-6" 11'-9" 2'-0"
1 3 4 6
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-6" 1'-6" 1'-6" 4'-6" 3'-2" 1'-1" 1'-1" 3'-2" 3'-7" 1'-3" 1'-3" 3'-7" 2-20 Ø st. 2-20 Ø st.
18 19 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
18 1-25+2-20 Ø st. 19 2-16 Ø F.B. 1-25+2-20 Ø st. 1-25+2-20 Ø st.
12" 12"
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 18-18 SECTION OF 19-19
1'-0" 18'-0" 1'-0" 12'-6" 2'-0" 14'-4" 1'-8"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-43
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
1 3 4 7
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-25 Ø ext. 1-25 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 3-25 Ø ext. 3-25 Ø ext.
4'-2" 1'-5" 1'-5" 4'-2" 3'-1" 1'-0" 1'-0" 3'-1" 5'-4" 1'-10" 1'-10" 5'-9" 2-20 Ø st. 2-20 Ø st.
20 21 1-20 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
20 3-20 Ø st. 21 2-16 Ø F.B. 2-25 Ø ext. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c Ø12@6"c/c(bundle) 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø12@4"c/c(bundle) Ø12@4"c/c(bundle)
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 20-20 SECTION OF 21-21
2'-0" 16'-9" 1'-6" 12'-3" 2'-0" 21'-5" 2'-0"
B C D
2-16 Ø st.
1-16 Ø ext. 1-16 Ø ext. 1-16 Ø ext.
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
3'-9" 1'-4" 1'-4" 3'-9" 3'-9" 1'-3" 1'-3" 3'-9" 2-16 Ø st. 2-16 Ø st.
22 23 1-16 Ø ext.
2-20 Ø ext.
24"
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
22 3-20 Ø st. 23 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@6"c/c Ø10@6"c/c 12" 12"
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" SECTION OF 22-22 SECTION OF 23-23
1'-0" 15'-11" 1'-0" 14'-10" 1'-3"
2-20 Ø st.
1-20 Ø ext.
2-20 Ø ext.
24"
10 Ø @ 4" c/c.
2-16 Ø (F.B)
1 3 5 7 8
12"
3-20 Ø st.
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. SECTION OF 23'-23'
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
4'-2" 1'-5" 1'-5" 4'-2" 4'-3" 1'-5" 1'-5" 4'-3" 4'-4" 1'-5" 1'-5" 4'-4"
23' 24 2-20 Ø st.
24"
10 Ø @ 6" c/c.
23' 24 2-16 Ø ext. 2-16 Ø (F.B)
3-20 Ø st. 2-16 Ø F.B.
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0" 4'-0" 4'-0" 12"
3-20 Ø st.
2'-0" 16'-9" 1'-6" 17'-0" 1'-6" 17'-2" 1'-6" 7'-9" 1'-6"
SECTION OF 24-24
LONG SECTION OF FLOOR BEAM, F.B-12 (SIZE=12" X 24")
1 3 5 7 10
2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-25 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext.
2-20 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-25 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext.
12''X24''
15''X24''
4'-3" 1'-5" 1'-5" 4'-3" 4'-4" 1'-5" 1'-5" 4'-4" 4'-2" 1'-5" 1'-5" 4'-2"
25 26
24"
10 Ø @ 4" c/c. 10 Ø @ 6" c/c.
2-16 Ø (F.B) 2-16 Ø (F.B)
12"
3-20 Ø st. 12"
3-20 Ø st.
SECTION OF 25-25 SECTION OF 26-26
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-44
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
5 7 9 2-16 Ø st.
5 1-20 Ø ext.
2-16 Ø st. 2-16 Ø st.
1-20 Ø ext. 1-20 Ø ext. 1-20 Ø ext. 2-20 Ø ext.
24"
2-20 Ø ext. 2-20 Ø ext. 2-20 Ø ext. 10 Ø @ 4" c/c.
2-16 Ø (F.B)
2-16 Ø st. 4'-5" 1'-6" 1'-6" 4'-5" 3'-10" 1'-4" 1'-4" 3'-10"
27 28 29 12"
3-20 Ø st.
SECTION OF 28-28
24"
2-16 Ø st.
27 3-20 Ø st. 28 29 2-16 Ø st.
3-20 Ø st. 2-16 Ø st. 12" 3-20 Ø st. 2-16 Ø F.B.
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
4'-0" 4'-0" SECTION OF 27-27 4'-0" 4'-0" 4'-0" 4'-0"
1'-0" 14'-4" 1'-0" 1'-0" 17'-8" 1'-0" 15'-5" 1'-0"
24"
10 Ø @ 6" c/c.
LONG SECTION OF FLOOR BEAM, F.B-14 (SIZE=12" X 24") LONG SECTION OF FLOOR BEAM, F.B-15 (SIZE=12" X 24") 2-16 Ø (F.B)
3-20 Ø st.
12"
SECTION OF 29-29
1 2 2
2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext. 3-25 Ø st.
12''X24''
10''X30''
3'-3" 1'-1" 1'-1" 3'-3" 2-25 Ø st. 1-25 Ø ext. 3-25 Ø st.
30 31 1-20 Ø ext. 32
3-25 Ø ext.
2-20 Ø ext. 2-25 Ø st.
30"
24"
30"
10 Ø @ 4" c/c. 2-16 Ø (F.B) 12 Ø @ 4" c/c.(bundle) 12 Ø @ 4" c/c.(bundle)
3-25 Ø st. 3-25 Ø st. 2-16 Ø (F.B) 3-25 Ø st. 2-16 Ø (F.B) 2-25 Ø st.
30 2-16 Ø F.B. 3-25 Ø st. 3-25 Ø st. 3-25 Ø st. 2-16 Ø F.B. 32 3-25 Ø st. 2-25 Ø st. 3-25 Ø st.
31 12" 10" Ø12@4"c/c(bundle) 10"
Ø10@4"c/c Ø10@6"c/c Ø10@4"c/c
Ø12@4"c/c(bundle)
4'-0" 4'-0" SECTION OF 30-30 SECTION OF 31-31 SECTION OF 32-32
1'-0" 13'-0" 3'-0" 3'-2" 3'-0" 3'-0" 3'-2" 3'-0"
LONG SECTION OF FLOOR BEAM, F.B-16 (SIZE=12" X 24")&(10''x30") LONG SECTION OF FLOOR BEAM, F.B-17 (SIZE=10" X 30")
2
3-20 Ø st.
2-16 Ø st.
3-20 Ø st.
33
2-16 Ø st.
24"
10 Ø @ 4" c/c.
2-16 Ø (F.B)
33 2-16 Ø F.B. 3-20 Ø st. 3-20 Ø st.
Ø10@4"c/c 12"
SECTION OF 33-33
1'-0" 7'-2" 1'-0"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE SECTION OF FLOOR BEAM
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-45
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4'-9"
1'-6"
5"
11"
1'-8"
10
10"
9
7'-1"
3'-8"
4'-11"
8
1'-3"
4'-11" 4'-11"
8'-11"
3'-8" 3'-8"
4'-11"
C.B
3'-8"
10"
10"
7
3'-7"
4'-3"
4'-1"
4'-9"
7'-6"
5'-8"
5'-6"
6 5'-6" 5'-6" 4'-9" 4'-9" 5'-8" 5'-8"
5'-8"
4'-9"
4'-3"
3'-7"
L.B
5 DN
5'-6"
4'-6"
4'-1"
1'-0"
3'-7"
4'-9"
1'-0"
UP
1'-3"
4
2'-0"
7" 1'-3"
10"
L.B
3'-2"
3'-2"
4'-2"
4'-2"
4'-2" 4'-2" 4'-2" 4'-2" 4'-9" 4'-9"
14'-0"
1'-0"
3'-2" 3'-2" 3'-2" 3'-2" 3'-7" 3'-7"
DN
5'-0"
4'-9"
4'-2"
4'-2"
3'-7"
3'-2"
3'-2"
3'-10"
7"
5'-1"
7'-2"
3
6"
4'-11"
3'-4"
3'-9"
4'-0"
4'-5"
4'-11"
3'-1"
5'-4"
1'-8"
7"
2
26'-6"
5'-3"
C.S
4'-5" 4'-5" 5'-4" 5'-4" 4'-11" 4'-11" 5'-1" 5'-1"
14'-1"
6'-6"
M.S
3'-4" 3'-4" 4'-0" 4'-0" 3'-9" 3'-9" 3'-10" 3'-10"
4'-11"
5'-4"
5'-1"
4'-5"
3'-10"
4'-0"
1'-0"
3'-9"
3'-4"
7" 2'-5"
7"
6'-9"
C.S
1
6"
7"
2'-6"
5"
A B C D E F G H I J K
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE ROOF FLOOR SLAB DIMENSION DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-46
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4'-9"
1'-6"
5" NOTE:-
11"
1'-8"
10 (A) 10 mmØ@ 6" c/c. alt ckd
10"
9 (B) 10 mmØ@ 6" c/c. alt ckd
(C) 10 mmØ@ 7" c/c. (T/B)
7'-1"
(D) 12 mmØ@ 8" c/c.
(E) 12 mmØ@ 5'' c/c.
8 1 3 (1) 1-10 mmØ ext. (Top)
1 2 (2) 1-12 mmØ ext. (Top)
8'-11"
(3) 1-16+1-12 mmØ ext.(Top)
(4) 2-16 mmØ ext.(Top).
C.B
10"
10"
7
2 2 2
7'-6"
6 2 3 3 2
B
A A A
11'-5"
2 1
L.B
5 DN
4'-6"
UP
4
L.B
1 2 C
1 1 2 2
14'-0"
DN
B
2 2 2
7"
3 2
6"
4'-11"
3'-1"
A 1'-8"
7"
2
5'-3"
4
C.S
3 D
1 2 B 2 B 2 2 B 2 4 D 3
D D
14'-1"
1'-1"
6'-6"
M.S
A D TH=8''
D
3
1'-0"
7" 1 1 2'-5"
1 1
4 4
7"
6'-9"
C.S
1 D
6"
7" D 3
5"
A B C D E F G H I J K
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-47
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4'-9"
1'-6"
NOTE:-
10 (A) 10 mmØ@ 6" c/c. alt ckd
9 (B) 10 mmØ@ 6" c/c. alt ckd
(C) 10 mmØ@ 7" c/c. (T/B)
7'-1"
(D) 12 mmØ@ 8" c/c.
(E) 12 mmØ@ 5'' c/c.
8 1 3 (1) 1-10 mmØ ext. (Top)
3-16Ø st. 1 2 (2) 1-12 mmØ ext. (Top)
10"
8'-11"
(3) 1-16+1-12 mmØ ext.(Top)
10Ø@ 4"c/c (4) 2-16 mmØ ext.(Top).
C.B
6"
3-16Ø st.
7
SECTION OF C.B 2 2 2
7'-6"
6 2 3 3 2
B
A A A
11'-5"
2 1
L.B
5 DN
4'-6"
UP
4
L.B
1 2 C
1 1 2 2
14'-0"
DN
B
2 2 2
3 2 C
4'-11"
C 3'-1"
A
2
5'-3"
C.S
1 2 2 2 E
D TH=8''
14'-1"
B B 2 B 2
6'-6"
M.S
A
E D E
1 1 1 1
6'-9"
C.S
1 E
5"
2'-6"
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE ROOF FLOOR SLAB REINFORCEMENT DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-48
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
4 6 7
7'-5" 15'-11" 7'-6"
6'-5"
A
NOTE:-
All architectural dimension & Level
A A shall be confirmed from architectural
drawing.
15'-4"
B
OHWT DETAILS
6"
L/4 L/4
8" Ø10 @ 6" c/c. 8"
Ø10 @ 6" c/c. Ø10 @ 6" c/c . Ø10 @ 5" c/c. Ø10 @ 5" c/c.
1" Ø10 @ 5" c/c. 5'-0" Ø10 @ 5" c/c. 2" Ø10 @ 6" c/c.
1"
Ø10 @ 7" c/c. Ø10 @ 7" c/c. Ø10 @ 7" c/c.
8"
2"
2"
8"
SECTION-A-A
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE STAIR ROOF DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-49
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.
NOTE:-
(A) 10 mmØ@ 6" c/c. alt ckd
(B) 10 mmØ@ 7" c/c. alt ckd
(C) 10 mmØ@ 6" c/c. (T&B)
(1) 1-10 mmØ ext. (Top) D H
2-20 Ø st.
1-20 Ø ext. 1-20 Ø ext.
2-25 Ø ext. 2-25 Ø ext.
5'-1" 1'-8" 1'-8" 5'-1"
F.B-1(12"X24")
2-25+1-20 Ø st. 2-16 Ø F.B.
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0"
1'-6" 20'-2" 2'-0" 5'-8"
1
LONG SECTION OF FLOOR BEAM, F.B-1 (SIZE=12" X 24")
F.B-4(12"X24")
F.B-3(12"X24")
D G I
A
2-25 Ø st.
1-20 Ø ext. 1-25 Ø ext.
12''X24''
2-20 Ø ext. 2-25 Ø ext.
B 3'-7" 1'-4" 1'-4" 3'-10"
1
1
2-25+1-20 Ø st. 2-16 Ø F.B.
Ø10@4"c/c Ø10@4"c/c Ø10@4"c/c
4'-0" 4'-0"
1
F.B-2(12"X24") 3 5
C 2-20 Ø st.
1-25 Ø ext. 1-25 Ø ext.
A A 2-25 Ø ext. 2-25 Ø ext.
15''X24''
4'-3" 1'-5" 1'-5" 4'-3"
C
STAIR ROOF & MACHINE ROOM SLAB LONG SECTION OF FLOOR BEAM, F.B-3 (SIZE=12" X 24")
10mm∅@6"c/c
SLAB THICKNESS=5" Lift Core Top
2-16 Ø st.
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE STAIR ROOF DETAILS
MAHTAB HUSSAIN SIDDIQUE S - 101MIEB-A-18446 Engr.A.K.M. SAIFUL BARI (PEng) Engr. Atiqul Islam Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : 05.10.2020 This drawing is owned by
PROPOSED 7-STORIED DHAKKHIN combined with the structural design drawing is as shown MW3 Design+Partners .
HAMS GROUP MW3 Design+Partners LIFE FELLOW FIEB-8374, Second Submission :
OFFICE BUILDING FOR VANGNAHATI, B.M. ANISUR RAHMAN R-133 DMINB-CE-0011, during the construction phase. Any unauthorized copying,
VICTORIA INTIMATE LTD. SREEPUR, CDA-0128
ELECTRICAL ENGINEER: Drawing Submission ü Structural Presentation Drawing This drawing should be followed by an experienced
Read the drawing first Third Submission :
changing & distribution of SHEET NO
prior to construction. Fourth Submission : SCALE
logo.png
..\..\..\MW3
GAZIPUR, House #24, (Suite-702), Road#14 MEHEDI AMIN AA-239 engineer on the site during construction phase, this drawing is strictly prohibited.
BANGLADESH. Block:G, Niketon, Gulshan-1, Dhaka-1212
Plumbing ü Construction Drawing otherwise this design drawing is not responsible for any
Fifth Submission :
Tel :+88029840957
ALOK DAS AD-05 MD. FAISHAL HASAN
MIEB-A-18446
type of improper construction work.
For any confusion please All other drawings before the last revised drawing
contact with us. is inapplicable for any action
© Unauthorized duplication TOTAL BUILT AREA
NOT IN SCALE S-50
Electrical For Approval is a violation of applicable laws
Website: mw3.com.bd MD. RAKIBUL HASAN AH-402 The drawing is prepared as per client's program & site.