Professional Documents
Culture Documents
Execution Plan For FF Pipe at Cliff
Execution Plan For FF Pipe at Cliff
2. Construction Works
➢ Scaffolding Plan for temporary support and Sleeper Pipe
Method Of Works
Method Of Works
➢ Tie up pipe ( Double choker ) with sling belt 45 ➢ Tie up pipe with chain block ( 2-3 points ) that already prepared
degrees. Make sure inside of pipe already clean and before at temporary support. Using double chocker method for tie
blowed. Stringing fire fighting pipe using crane 50T up the pipe for preventation pipe slide down. Release the hook of
and put it slowly and careful on support of pipe. crane and the pipe already hold by chain block.
Method Of Works
➢ Slowly release the chain blocks together and pipe will slide down. Please make sure, when pipe slide down there are people will
choose as guide man to control the pipe moved. This method will continue until pipe reach the elevation.
Method Of Works
➢ Doing this method for remaining pipe line. When second pipe already at positioning, please welding the joint and continued to
next pipe.
Mobile crane 50 ton Boom truck
Load chart crane 50 ton
Plate 1200X6000X10
Fence
272
50
R20
000
SWL Point: Crane 50 ton
Boom length : 27,25 m
Max radius : 20 m
El.+27,962 SWL Manufaktur :3 Ton
Load calculation
Spool pipe FF Material Weigth : 0,75 Ton
Spool pipe FF Mobile crane 50 ton Multyply Factor : 1,05 Ton
Pipe sleeper Fence
El.+21,416 Pipe sleeper Weigth : 0,79 Ton
Lifting appliance weigth (Wa) : 0,1 Ton
Weigth of hook (Wh) : 0,6 Ton
Weigth of aux.hook (Wah) : 0 Ton
Other (Wot) : 0 Ton
Safety factor (Fs) : 2
Allowable : yes
20000
El.+8,080
Detail-2
Ladder scaffold
El.+21,416 (existing)
Detail-1
El.+14,773
B
Spool pipe Spool pipe
Scaffolding, 600 C
temporary support
480
750
Pipe sleeper
El.+8,080
200
Concrete
H beam 200x200
Detail - 2
Scale 1:50
Teflon sheet
2000
500 800
thk 6 mm
Chain block 3 ton Ashiba 1200x250 Concrete
Base plate
Spool pipe
Pipe sleeper 1250 Concrete
Potongan - C
Scale 1:25
Potongan - B
Scale 1:25
Detail - 1
Scale 1:75 Potongan - A
Scale 1:75
Scaffolding plan & detail sleeper pipe
2. 3.
1.
S-11
Chain block
S-12
S-11
Webbing sling
Chain block
Wire sling
Chain block S-10
Spool pipe
Webbing sling
S-11 Spool pipe
Chain block
S-10
Chain block
Webbing sling
S-9
Chain block
4. 5. 6.
Chain block
S-10
S-10
Chain block
Spool pipe Webbing sling
S-9
Spool pipe
Webbing sling
Chain block Chain block
Webbing sling
3000 6100