Download as pdf
Download as pdf
You are on page 1of 9
ber 4600002696 we Contract N = 4 nee oe re ‘Schedule C-1 (WORK UNIT RATES) Bare “N Refractory Serviees Contract (PR#10023800) Peis Rabon | cove DESCRIPTION ot | ae ‘Work Unit fate comprise all Contractor's direct and indirect cost, including but no limited to direct labor and supervisory labor with associated payroll additives, equipment, maintenance, transportation, overtime and Ramadan premiums, vacation 1d holiday pay, consumables, toole, equipment, temporary access and support, services. mobilization and {emobilzat on, travel Ue io and from the Work Site, site overheads, Contractor's camp facilties and operations, safety and Securty rec ements, permits processing and handling, Saudi Arabia Secial Insurance contributions, all taxes, ineurance and related costs, overheads and proft. All rates payable on account of any work performed shall apply regardless of the ‘ime of day >r night, or day of the week, or whether any glven day worked is holiday or weekend day. or00 | WORK UNIT RATES: 7 Contractor shall supply all required manpower, equipment and _ materials including but not limited to anchorage, coating, surface i | preparation, vapor barrier, boards, blanket, straps, bricks, | Shuttering, bolts & nuts, et. Refractory Materials supplied by | | Petrorabigh as per stated on each line items — Joo, | Remave Damaged castable refractory, on pressure vessel, boilers, process heater, heat exchangers furnaces, evaporators, boilers, burners, 9044340 stacks / reactors & flares, sulfur recovery unit equipment and piping: ie faa || including anchor & support removal and cleaning; dumig:to contractor |) | ‘aes aS approved by Petro Rabigh Contractor supplied | equipments. : a sae Install refractory, castable using gunning; thickness less than 200mm on pressure vessel, hollers, process heater, heat exchangers, furnaces, 9024341 | evaporators, boilers, burners, stacks / reactors & flares, sulfur recovery M2 unit equipment and piping: includes providing and welding of anchor & | support installation, coating and surface preparation as per SAES-N-110, Refractory Material supplied by Petrorabigh install refractory, castable using gunning: thickness 10Omm-200rmm on pressure vessel, boilers, process heater, heat exchangers, furnaces, | 9024342 | evaporators, boilers, burners, stacks, reactors & flares, sulfur recovery M2 unit equipment and piping; includes providing and welding of anchor & support instalation, coating and surface preparation as per SAES-N-110. Refractory Material supplied by Petrorabigh ae Install refractory, castable using gunning; thickness greater than 200mm ‘on pressure vessel, boilers, process heater, heat exchangers, furnaces, 9088383 | evaporators, boilers, burners, stacks, reactors & flares, sulfur recovery M2 unit equipment and piping includes; providing and welding of anchor & support installation, coating and surface preparation as per SAES-N-110 Refractory Material supplied by Petrorabigh \ Repair refractory, castable using gunning; thickness less than 100mm | on pressure vessel, boilers, process heater, heat exchangers, furnaces, 3048548 | evaporators, bollers, burners, stacks, reactors & flares, sufur recovery M2 unit equipment and piping; includes supplying and welding of anchor & Support installation, coating and surface preparation as per SAES-N-110. _Refractory Material supplied by Petrorabigh 923.00 1,424.00 566.00 n : are Contract Num yer 4600002696 Leaaarig ——— aaniecr womemarnareg————————] iS ‘ontract Title Refractory Serviees Contract (PR#10023800) Pevoratioh VA E is RATE = DESCRIPTION wir | Repair refractory, castable using gunning, thickness 100mmr-200mm on pressure vessel, boilers, process heater, heat exchangers, furnaces, | | 9044345 | evaporators, boilers, burners, stacks, reactors & flares, sulfur recovery | M2 Unit equipment and piping; includes supplying and welding of anchor & | support installation, coating and surface preparation as per SAFS-N-110. | Refractory Material supplied by Petrorabigh. ae Repair refractory, castable using gunning; thickness greater than 200mm on pressure vessel, boilers, process heater, heat exchangers, furnaces, 9044346 | evaporators, boilers, burners, stacks, reactors & flares, sulfur recovery, M2 Unit equipment and piping: includes supplying and welding of anchor & support installation, coating and surface preparation as per SAES-N-110. Refractory Material supplied by Petrorabigh Install refractory, castable by casting applications; thickness less than | 100mm on pressure vessel, boilers, process heater, heat exchangers, 9044347 furnaces, evaporators, boilers, burners, stacks, reactors & flares, sulfur | M2 recovery unit equipment and piping; includes supplying and welding of [anchor & support installation, coating and surface preparation SAES-N-110, Refractory Material supplied by Petrorabigh. install refractory, castable by casting applications; thickness 100mm-200mm on pressure vessel, boilers, process heater, heat exchangers, furnaces, evaporators, boilers, burners, stacks, reactors & | yyy flares, sulfur recovery unit equipment and piping; includes supplying and | 2,003.00 welding of anchor & support installation, coating and surface reparation as per SAES-N-110. Refractory Material supplied by Petia lat a as a Install refractory, castable by casting applications; thickness greater than 200mm on pressure vessel, boilers, process heater, heat ‘exchangers, furnaces, evaporators, boilers, burners, stacks, reactors & yyy flares, sulfur recovery unit equipment and piping; includes supplying and | 1564.00 welding of anchor & support installation, coating and surface | preparation as per SAES-N-110. Refractory Material supplied by Petrorabigh. eee eee i Repair refractory, castable by casting applications; thickness less than 100mm on pressure vessel, boilers, process heater, heat exchangers, 9044350 || furnaces, evaporators, boilers, burners, stacks, reactors & flares, sulfur, = M2 | recovery unit equipment and pipingjincludes supplying and welding of | anchor & support installation, coating and surface preparation as per _SAES-N-110. Refractory Material supplied by Petrorabigh. Repair refractory, casting applications; thickness | 100mm-200mm on pressure vessel, boilers, process heater, heat | aoaaas1 | exchangers, furnaces, evaporators, boilers, burners, stacks, reactors & | yy) | flares, sulfur recovery unit equipment and piping;includes supplying and 938.70 welding of anchor & support installation, coating and surface Preparation as per SAES-N-110, Refractory Material supplied by _Petrorabigh. hy —_—. 1983.00 3,528.00 576.00 9044348, 9044349 536.40 4600002696 1 ] ‘Schedule C-1 (WORK UNIT RATES) ee es _ ie —_| Sebel CHORE UNI RATES) g-gn “N Refractory Services Contract (PR#10023800) PetroRabigh iF =e RATE cope DESCRIPTION unt | Gan "Repair refractory, castable by casting applications; thickness greater | than 200mm on pressure vessel, boilers, process heater, heat | exchangers, furnaces, evaporators, boilers, burners, stacks, reactors & 904435; uz | flares, sulfur recovery unit equipment and piping; includes supply and 4,534.00 welding of anchor & support installation, coating and surface Preparation as per SAES-N-110. Refractory Material supplied by | Petrorabigh | Install refractory, Ceramic Fiber; modular construction; thickness less than 100mm; on pressure vessel, boilers, process heater, heat exchangers, furnaces, evaporators, boilers, burners, stacks, reactors & flares, sulfur recovery unit equipment and piping; inclusive of boards, blanket, straps, surface preparation & cleaning, vapor barrier, supplying, and welding of anchors, coating and supports installation as per | SAES.N-240. Refractory Material supplied by Petrorabigh, Install refractory, Ceramic Fiber; modular construction; thickness 100- 200mm; on pressure vessel, boilers, process heater, heat exchangers, furnaces, evaporators, boilers, burners, stacks, reactors & flares, sulfur recovery unit equipment and piping; inclusive of boards, blanket, 412.00 straps, surface preparation & cleaning, vapor barrier, supplying and | welding of anchors, coating and supports installation as per SAES-N-140. | _ Refractory Material supplied by Petrorabigh | Repair refractory, Ceramic Fit 1 construs = than 100mm; on pressure vessel, boilers, process heater, heat exchangers, furnaces, evaporators, boilers, burners, stacks, reactors & 5084355 ) | frares, sulfur recovery unit equipment and piping; inclusive of boards, | blanket, straps, surface preparation & cleaning, vapor barrier, supplying | | and welding of anchors, coating and supports installation as per | SAES-N-140. Refractory Material supplied by Petrorabigh. - | Repair refractory, Ceramic Fiber; modular construction; thickness 100- a 200mm; on pressure vessel, boilers, process heater, heat exchangers, goaaasg, furnaces, evaporators, boilers, burners, stacks, reactors & flares, sulfur recovery unit equipment and piping; inclusive of boards, blanket, straps, surface preparation & cleaning, vapor barrier, supplying and welding of | anchors, coating and supports as per SAES-N-140. Refractory Material ___ supplied by Petrorabigh. ae Install refractory, Ceramic Fiber; Layered Blankets and Blanket Board | i | construction; thickness less than 100mm; on pressure vessel, boilers, | process heater, heat exchangers, furnaces, evaporators, boilers, burners, | 9044357, stacks, reactors & flares, sulfur recovery unit equipment and piping, M2_—=—=343.00 inclusive of boards, blanket, straps, surface preparation & cleaning, vapor barrier, supplying and welding of anchors, coating and supports installation as per SAES-N-140. Refractory Material supplied by Petrorabigh. 9044353 207.00 9024354 M2 | m2 276.30 M2 378.90 p= yo oa 7 PAGES! Contract Numi er 4160000266 | F ocument Title Schedule C1 (WORK UNIT RATES) a Contract Title Refractory Services Contract (PR#10023800) PeoRatioh iw cope DESCRIPTION | unit RATE (SAR) Install refractory, Ceramic Fiber; Layered Blankets and Blanket Board construction; thickness 100- 200mm; on pressure vessel, boilers, process | heater, heat exchangers, furnaces, evaporators, boilers, burners, stacks , reactors & flares, sulfur recovery unit equipment and piping; inclusive of | boards, blanket, straps, surface preparation & cleaning, vapor barrier, | supplying and welding of anchors, coating and supports installation as 1 SAES-N-140, Refractory Material supplied by Petrorabigh. | Repair refractory, Ceramic Fiber; Layered Blankets and Blanket Board soaaase construction; thickness less than 100mm; on pressure vessel, boilers, process heater, heat exchangers, furnaces, evaporators, boilers, burners, 9044359 | stacks, reactors & flares, sulfur recovery unit Equipment and piping; M2 Inclusive of boards, blanket, straps, surface preparation & cleaning, vapor barrier, supplying and welding of anchors, coating and supports installation as per SAES-N-140. Refractory Material supplied by Petrorabigh. - Repair refractory, Ceramic Fiber; Layered Blankets and Blanket Board construction; thickness 100- 200mm; on pressure vessel, boilers, process heater, heat exchangers, furnaces, evaporators, boilers, Burner, tacks, yy reactors & flares, sulfur recovery unit equipment and piping; inclusive of boards, blanket, straps, surface preparation & cleaning, vapor barrier, supplying and welding of anchors, coating and supports as per SAES-N-140. Refractory Material supplied by Petrorabigh. Remove Damages refractory; ceramic Fiber, on pressure vessel, boilers, process heater, heat exchangers, furnaces, evaporators, boilers, 9044361 | burners, stacks, reactors & flares, sulfur recovery unit equipment and yg) | piping; inclusive of boards, blanket, straps, cleaning, vapor barrier, jachors and supports remove 9024360 [Install Refractory; Fireclay bricks; on pressure vessel, boilers, process. heater, heat exchangers, furnaces, evaporators, boilers, burners, stacks , | reactors & flares, sulfur recovery unit equipment and piping; includes Finstallation of expansion joints, cleaning & supports, surface preparation, supplying and welding of anchors, coating and supports installation , etc,. a5 per SAES:N-130. Contractor supplied materials including Fireclay bricks and equipments. ey Repair Refractory; Fireclay bricks; on pressure vessel, boilers, process heater, heat exchangers, furnaces, evaporators, boilers, burners, stacks reactors & flares, sulfur recovery unit equipment and piping. Includes [Installation of ‘expansion joints, cleaning & supports, surface | preparation, welding of anchors, coating and supports installation, et, 5 per SAES-N-130. Contractor supplied materials including Fireclay | bricks and equipments, Remove Refractory, bricks; on pressure vessel, boilers, process heater, heat exchangers, furnaces, evaporators, boilers, burners, stacks, reactors & flares, sulfur recovery unit equipment and piping. Includes removal of 9044362 9044363, 9044364 483.30 306.90 PAGE AIG Co vtraet Ni “| 600002696 Je De‘ument Title Schedule C1 (WORK UNIT RATES) but “N Céatract Title Refractory Services Contract (PR#10023800) Peto abigh | sone ‘DESCRIPTION ov | a T expansion joints, @eaninen® SuppORS : Esa OD © COED CHRD ""cantingency Purchase of Permanent Mat, Petrorabigh will reimburse |; po73s02: CONTRACTOR in accordance with Schedule Contractor shall not cA Ginsertanyrateforthisitem, 02.00 | SCAFFOLDING WORKS: i 3044365 Contractor shall supply all required scaffolding materials up to 12 | meters height including erection, design, maintain, dismantling & “transport scaffold. Potro Rabigh shall provide all required external | scaffolding Erect, design, maintain, dismantle & transport scaffold; interior; tower built; support from ground level to 21' high; single applicable rate, | rs, ‘inclusive of minimum rental period. Contractor supplied materials & | equipments. Erect, design, n, dismantle & transport scaffold;exterior; tower | built; support from ground level to 21' high; single applicable rate, FT3, | inclusive of minimum rental period. Contractor supplied materials & | Erect, design, maintain, dismantle & transport scaffold; interior; tower "built; support from ground level over 21’ up to 42" high; single applicable rate, inclusive of minimum rental period. Contractor supplied materials & equipments. Fra Erect, design, maintain, dismantle & transport scaffold; exterior, tower built; support from ground level over 21 up to 42' high; single applicable FT, rate, inclusive of minimum rental period. Contractor supplied materials | com Re | | Erect, design, maintain, dismantle & transport scaffold; interior, tower | | but; support from ground level over 42" high; single applicable rate, | ey3 181 Inclusive of minimum rental period. Contractor supplied materials & equipments. Erect, design, maintain, dismantle & transport scaffold; exterior, tower bull; support from ground level over 42" high; single applicable rate, gy inclusive of minimum rental period. Contractor supplied materials & 136 equipments. | Erect, design, maintain, dismantle & transport scaffold; interior, suspended; up to 21 above the ground from point of suspension; single | py3 applicable rate, inclusive of minimum rental period. Contractor supplied | sa2 materials & equipments. | Cyatract Numl er 4600002606 [Dcoment Tite ‘Schedule €-1 (WORK UNIT RATES) —| ars Ww | yntract Title Refractory Services Contract (PR#10023800) [oe ALE cove | DESCRIPTION wi | A pe “Erect, design, maintain, dismantle & transport scaffold; exterior i 044372 Suspended; up to 21" above the ground from point of suspension; single 73 applicable rate, inclusive of minimum rental period. Contractor supplied saz materials & equipments. | "| Erect, design, maintain, dismantle & transport scaffold; interior; ist suspended; | | 9044373 | point of suspension over 21° to 42" above ground; including supply, FT3_ | ggg dismantling and removal; single applicable rate, inclusive of minimum rental period. Contractor supplied materials & equipments. | ~~ Erect, design, maintain, dismantle & transport scaffold; exterior; | suspended; | 9044374 | point of suspension over 21° to 42' above ground; including supply, FT3 a0 dismantling and removal; single applicable rate, inclusive of minimum rental period. Contractor supplied materials & equipments. 7 lesign, maintain, dismantle & transport scaffold; interior, ss | suspended; i 9044375 point of suspension over 42° above ground; including supply, FT3 a | dismantling and removal; single applicable rate, inclusive of minimum | rental period. Contractor supplied materials & equipments. | Erect, design, maintain, dismantle & transport scaffold; exterior; | suspended; | | 9044376 point of suspension over 42' above ground; including supply, FT3. | dismantling and removal; single applicable rate, inclusive of minimum rental period. Contractor supplied materials & equipments, 9043651 Scaffold rental per day after 30 days minimum rental period i END OF SCHEDULE C-1 "PAGE 6 yntract Nuriber 4600002696 | — [Tocument Tile Schedule C-It (LABOR RATES) kwo2 Ww | Contract Tit! Refractory Services Contract (PR#10023800) ues at cove DESCRIPTION wir) RATE (SAR "Labor Rate -omprise all costs including but not limited to mobilization/ demobilization, site overhead, ‘camp and c3tering/ maintenance costs, all direct labor costs, Ramadan premiums, vacation pay, holiday pay, weekend pay, payroll insurance, sick pay, completion and retirement bonuses, transportation, travel | time to anc from the Work site, substances, living allowances, safety costs, tools, consumables, safety and | security rec uirements, work permits, any Government caused cost increases imposed at any time, and all burdens and overheads as well as profit. 295 | Sl PERVISOR HR €018850 | WELDER, CS, ELEC/GAS W/SAUDI ARAMCO CERTIFICATE He €018853 | WELDER, ALLOY, ELEC/GAS W/SAUDI ARAMCO CERTIFICATE THR 014570 | S/ FETY OFFICER “ MASON 106209 | F..BRICATOR doneas | af rRAcroRY TECHNICIAN eooom | wsuaron «006200 END OF SCHEDULE C-Il PAGE Iii Contract Nun ber 4600002696 hh CC*r Dhcument Tile __| Schedule C-ll (EQUIPMENT RATES) ea it ntract Title Refractory Services Contract (PR#10023800) PetioRabigh DESCRIPTION ur RAE Equipment | rates comprise all fixed and operating costs including but limited to mobilizatior /demobilization, transportation and travel time to and from the Work Site, site overheads, all | maintenance» costs including maintenance labor and catering and accommodation casts related thereto repairs, fue., lubricants, spare parts, operating supplies, tools, security and work permits, consumables, | insurance, ‘axes, and any Government caused cost increases imposed at any time associated with the supply and operation of the equipment and all averheads as well as profit. They exclude the cost of | equipment rivers or operator. [£02852 7 EL-CTRIC POWERED MORTAR STIRRER 022853 BFICK CUTTING MACHINE (022854 PHODLE WIKER | "5002863 12022868 | CIPSON MACHINE END OF SCHEDULE C-t Go wract Numb 4600002696, De sument Title Schedule C-1V (EMERGENCY RATES) Contract Title Refractory Services Contract (PR#10023800) o “RATE Cove DESCRIPTION UNIT | (BAR) Contractor shall be paid an Emergency Mobilization Fee for emergency Service Authorization ‘sued if Contractor Mobilizes within four (4) hours or less. 9¢07879 EMERGENCY MOBILIZATION END OF SCHEDULE C-1V 7 tet z

You might also like