Professional Documents
Culture Documents
DOC-20221205-WA0020. Fainal Boq
DOC-20221205-WA0020. Fainal Boq
1 n. Partition work
3" thikness partition,two side 10 mm
cement basin bord fitting with paint finis 1150/- 300/-
2 n. Storej work
gurgen plywood ,in and out side laminate
finis ,with door and soft close hingis fitting
3 n. Reception table
with lamination and duco paint finis 6.0"*3.6"*2.6D
4 n. Sofa
6 seeter sofa,with iron frem 6 n. 7500/
with black or grey razin cover
6 n. fecial beds
in and out side laminate with slading door
fittings 6.2"*2.6" 3 n. 25'000/-
7 n. bueity room sink storej
sink storej with door fittings 6'*2'*2 24 sft 1050/-
bridle room sink storej 11.11"*2' 23.84" sft 1050/-
11 n. mens section
hairwash and pedicure display 6'*8.6" 51 sft 650/-
hair wash back side storej box 7.9"*2.6" 19.375 sft 1050/-
16 n. electric work
fino lex wiring 15 watts cilling
lighting , strip lights , Roma swich, track lighting
spiker wiring and 8watt ,8n. fall cilling speeker.fitting
18 n. paint working
partition and cilling and wall
total
discount 10%
total Bill
notes
carpentry work all materials
comercial ply with soft close Hingis with laminate finis.
laminate range-1200/- to 1500/- fainal dill of work
payment conditions
1st 50% adavance payment
carpentry ruffle work,pop Chainal work.
2nd 25% for wiring and cilling work
amount
3'45'000/-
51'607/-
54'600/-
24'281/-
34'781/-
70'206/-
82'556/-
38'556/-
19'278/-
45'000/-
45'000/-
92'000/-
75'000/-
25'200/-
25'032/-
33'075/-
44'200/-
15'750/-
32'665/-
33'150/-
20'343/-
18'585/-
6982/-
15'000/-
19'400/-
39'689/-
3'70'000/-
54'000/-
2'00'000/
1'80'000/-
41'625/-
21'07'561/-
2'10'756/-
18'96'805/-
16'00'000/-