Isometric: Boddington Gold
Isometric: Boddington Gold
A A
B B
4
ISOMETRIC
MASS: 8 kg
2071
(80) (1686) 305
(n79.2 I/D)
TYP
90
°
C C
(5.4)
(n90)
305
FLOW
R305
SWEEP BEND
1026
D D
(641)
NOTES:
1. FABRICATION, WELDING AND HYDROSTATIC TESTING TO COMPLY
WITH NBG STANDARD SPECIFICATION 11147-699-50SP-0003.
2. MATERIAL SHALL COMPLY WITH NBG STANDARD SPECIFICATION
(80)
11147-699-50SP-0001 PIPING MATERIAL SPEC PE10C
3. BOLT HOLES TO EQUALLY STRADDLE VERTICAL & HORIZONTAL
ELEVATION CENTRELINES UNO.
4. NOMINAL PIPE SIZE IS Ø90
E POLYETHYLENE SPOOL 5. PIPELINE NUMBER 672005-PE10C-90-SC-N E
BODDINGTON GOLD
PO Box 48, Boddington 6390, Western Australia, Australia
ABN: 23 127 702 854 jmdengineering.com.au
Telephone +61 8 9883 8260 Facsimilie +61 8 9883 4208
www.newmont.com
JMD DOCUMENT No: 220070-109-000
NAME DATE EQUIP No.: 672-PPC-1-04, 1-05 TITLE:
F
CARBON REACTIVATION F
11147-699-50SP-0019 NBG STANDARD- SUPPLY & INSTALL OF RUBBER LINED PIPING ENGINEER NBG 05.08.2022 PROJECT No.: 22-BOD-0028 SCALE: SHOWN
QUENCH TOWER TANK PIPING
11147-699-50SP-0001 NBG STANDARD- PIPING MATERIAL SPECIFICATION DRAWN MZ 12.08.2022 DIMENSIONS IN MILLIMETRES SPOOL 672-SPL-1-009
11147-672-500-101 CARBON REACTIVATION - TRAIN 1 P&ID CHECKED SRM 12.08.2022 SHEET SIZE: A1 ARRANGEMENT & DETAILS
0 09.09.22 ISSUED FOR CONSTRUCTION NBG MZ SRM WV TN 11147-672-50X-0018 QUENCH TOWER TANK PIPING GA APPROVED WV 01.09.2022 DO NOT SCALE DRAWING No.: REV:
REV DATE REVISION DESCRIPTION ENG DRN CHK APP NBG REFERENCE DOCUMENT No. REFERENCE DOCUMENT TITLE NBG TN 09.09.2022 IF IN DOUBT ASK! 11147-672-50X-0027 0
1 2 3 4 5 6 7 8
220070-109-000