1 2 3 4 5 6 7 8

PARTS LIST - QUANTITIES SHOWN FOR ONE ASSEMBLY ONLY


4 PART QTY DESCRIPTION LENGTH WIDTH MATERIAL MASS/UNIT
3 1 1 1 DN80 STD WT (WT = 5.49) 692 89 Generic 1 kg
2 1 DN50 STD WT (WT = 3.91) 137 60 Generic 0.1 kg
2 3 2 DN80 TABLE E SOFF FLANGE AS3678-250 1.8 kg
4 1 DN50 TABLE E SOFF FLANGE AS3678-250 1.3 kg

A 1 9° A

WELD SPOOL No.


REFER NOTE 8

ISOMETRIC
TYP

RUBBER
RUBBER LINING OMITTED FOR CLARITY

3 THK
MASS: 13 kg
B B

120
3 THK 130
RUBBER
n
52 P E

TYP
PI
I/

SECTION A
D

1:2 -

END FLANGE ROTATION


(n LINI
0
17

40 NG
(

I/ )

7.8° 1
D)

(n66 I/D) 6 THK


(LINING) RUBBER
C R267 C
3D SWEEP BEND
DETAIL 1
1:1 -
45°

TYPICAL FLANGE WELD DETAIL


n78 I/D
PIPE

(23
)0
CUT PENETRATION
& PROFILE PIPE

60°
TO SUIT
FLOW

199
FOF

( 77
D 6 THK RUBBER LINING NOTES: D

)
TYP ALL INTERNAL SURFACES
FOF 1. THIS SPOOL IS RUBBER LINED

3 T BBER
2. FABRICATION, WELDING AND HYDROSTATIC TESTING TO COMPLY

RU
HK
WITH NBG STANDARD SPECIFICATION 11147-699-50SP-0003
3. MATERIAL SHALL COMPLY WITH NBG STANDARD SPECIFICATION
11147-699-50SP-0001 PIPING MATERIAL SPEC SR2
4. BOLT HOLES TO EQUALLY STRADDLE VERTICAL & HORIZONTAL
(337) CENTRELINES UNO
5. NOMINAL PIPE SIZE IS DN80 / DN50
490 6. PIPELINE NUMBER 672005-SR2-90-SC-N
7. FLANGES TO BE PROVIDED WITH JACKING SCREW HOLES IN
606 ACCORDANCE WITH NEWMONT STANDARD DRAWING
10 8. WELD SPOOL NUMBER LONGITUDINALLY ON SPOOL USING 25mm
LETTERING
E A- 9. SURFACE TREATMENT SHALL BE AS PER NBG STANDARD E
END VIEW ELEVATION SPECIFICATION 11147-699-10SP-0006. CLIENT SPECIFICATIONS
10. NDT WELDS:
MARK No: 672-SPL-1-001 - 100% VISUAL
REF: 11147-672-50X-0018 - 100% MPI
SCALE: 1:2 11. RUBBER LINING TO COMPLY WITH NBG SPECIFICATION
11147-699-50SP-0019.

BODDINGTON GOLD
PO Box 48, Boddington 6390, Western Australia, Australia
ABN: 23 127 702 854 jmdengineering.com.au
Telephone +61 8 9883 8260 Facsimilie +61 8 9883 4208
www.newmont.com
JMD DOCUMENT No: 220070-101-000
NAME DATE EQUIP No.: 672-PPC-1-04, 1-05 TITLE:
F
CARBON REACTIVATION F
11147-699-50SP-0019 NBG STANDARD- SUPPLY & INSTALL OF RUBBER LINED PIPING ENGINEER NBG 05.08.2022 PROJECT No.: 22-BOD-0028 SCALE:
QUENCH TOWER TANK PIPING
11147-699-50SP-0001 NBG STANDARD- PIPING MATERIAL SPECIFICATION DRAWN MZ 12.08.2022 DIMENSIONS IN MILLIMETRES SPOOL 672-SPL-1-001
11147-672-500-101 CARBON REACTIVATION - TRAIN 1 P&ID CHECKED SRM 12.08.2022 SHEET SIZE: A1 DETAILS
0 09.09.22 ISSUED FOR CONSTRUCTION NBG MZ SRM WV TN 11147-672-50X-0018 QUENCH TOWER TANK PIPING GA APPROVED WV 01.09.2022 DO NOT SCALE DRAWING No.: REV:
REV DATE REVISION DESCRIPTION ENG DRN CHK APP NBG REFERENCE DOCUMENT No. REFERENCE DOCUMENT TITLE NBG TN 09.09.2022 IF IN DOUBT ASK! 11147-672-50X-0019 0
1 2 3 4 5 6 7 8
220070-101-000