NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS.


2. ALL LEVELS ARE IN METER.
3. DIMENSIONS SHOWING FIXTURE LOCATION ARE SUBJECT FOR VERIFICATION / COORDINATION WITH THE ENGINEER.
4. 10MM JOINT DIMENSION
5. LEGEND (BELOW) SHOWS THE TOTAL NUMBER OF GRC ELEMENTS ON SOUTH ELEVATION, NOT JUST PARTIAL.

LEGEND:
GFRC QTY GFRC QTY GFRC QTY
Type QTY Type QTY Type QTY
GR100/T2-1 2 GR100/T5-6 2 GR200/T2-7 1
GR100/T2-2 32 GR100/T5-7 1 GR200/T2-7A 1
GR100/T2-3 3 GR100/T5-8 1 GR200/T2-8 2
GR100/T2-4 4 GR100/T5-9 1 GR200/T2-8A 2
GR100/T2-5 3 GR100/T5-10 2 GR200/T2-9 6
GR100/T2-6 4 GR100/T5-11 2 GR200/T2-9A 6
GR100/T2-7 1 GR100/T5-12 2 GR200/T2-10 2
GR100/T2-8 2 GR100/T5-13 2 GR200/T2-10A 2
GR100/T3-1 1 GR300/T1 12
GR100/T3-2 1 GR100/T1-1 9
GR100/T3-3 1 GR100/T1-2 1
GR100/T3-4 1 GR100/T1-3 1
GR100/T3-5 1 GR100/T1-4 2
GR100/T3-6 1 GR100/T1-5 2
GR100/T3-7 1 GR200/T2-1 38
GR100/T3-8 1 GR200/T2-1A 38
GR100/T3-9 1 GR200/T2-2 1
GR100/T3-10 1 GR200/T2-2A 1
RP02- INGROUND RECESSED PROJECTOR
GR100/T3-11 1 GR200/T2-3 1 1X70W HIT - NARROW BEAM
GR100/T3-12 1 GR200/T2-3A 1
GR100/T3-13 1 GR200/T2-4 1 SM05- SURFACE MOUNTED
LED PINSPOT, 6 - 9WATT
GR100/T5-1 1 GR200/T2-4A 1
GR100/T5-2 13 GR200/T2-5 1 SM01- SURFACE MOUNTED PROJECTOR
GR100/T5-3 2 GR200/T2-5A 1 1X35W HIT - NARROW BEAM

GR100/T5-4 2 GR200/T2-6 1 SM01- SURFACE MOUNTED


GR100/T5-5 2 GR200/T2-6A 1 LINEAR LED 100cm LENGTH - 120 LED/m

COORDINATED WITH THE FOLLOWING DISCIPLINE


Arch Struct Mech Plumbing Elect

CONTRACT DRAWING REFERENCES


ARCHITECTURAL STRUCTURAL MEP
DRAWING No. REV. DRAWING No. REV. DRAWING No. REV.
883-3-N01-P01N-DC02-ARC-CN-
T07-A0-03-1007
883-3-N01-P01N-DC02-ARC-CN-
N00-A0-06-3021-02
883-3-N01-P01N-DC02-ARC-CN-
N00-A0-06-3022-02
883-3-N01-P01N-CN11-ACC-SH-
000-03490-2200

REV. DESCRIPTION DATE

01 ISSUED FOR APPROVAL 20/04/2015

00 ISSUED FOR APPROVAL 01/03/2015

PROJECT NAME:

JABAL OMAR DEVELOPMENT PROJECT


IN MAKKAH
OWNER:
Jabal Omar Development Co.

PROJECT MANAGER:

MAIN CONSULTANT:

RP02
RP02
ARCREA

RP02
In association

RP02
RP02
with
STUDIO
RP02
RP02

Associated Engineers Company


RP02

RP02

URBAN DESIGNERS: DESIGN DEV'T. COORDINATOR:

ATELIERS LION
ASSOCIES
INGEROP
Engineers

SUPERVISION CONSULTANT:

MAIN CONTRACTORS:

SAUDI ARABIAN CONSTRUCTION CO.

GFRC SUBCONTRACTOR: GFRC DESIGN DEVELOPMENT:

LAMDA AGENCY DBA

Lamda Agency DBA - Abu Dhabi Branch


www.upguae.ae

DRAWING TITLE:
- P01N -
- SOUTH ELEVATION -
- EXTERNAL SIDE - PART 01 -
- GFRC GENERAL DIVISION -

DRAWN BY: J.M.; CHECKED BY: T.R.L. APPROVED BY:

DRAWING NUMBER :
Phase
Project Code Number Zone/Area Tower Name Work Package Company NameDrawing Type Floor Type Descipline Serial Number Revision

883 3 N01 P01NCN11 ACCSH 000 03490 2201 01


DATE:
20/04/2015
SCALE: (A0)
1:75

You might also like