MS CAT5cycle
MS CAT5cycle
MS CAT5cycle
Prerequisite:
1. Create Work center of 0006 Capacity category (Project Management) with Capacity category
should be 002 (Labor)
2. Link HR personnel’s (HR master data) in the Work center
3. Maintain e for Activity type & Cost center (which was assigned in the Work center in the costing
tab) 89823
4. Capacity requirement checkbox should be active at Network header level
Whenever we assign work & work center, Person assignment tab will get activated
Enter actual time against desired date to book time for this activity (lets us assume that he worked on
26th Oct 5 hours)
Actual cost gets posted for 5 hours’ time booking form CATS