Professional Documents
Culture Documents
Undercariagge HITACHI ZX 850
Undercariagge HITACHI ZX 850
UNDERCARRIAGE
CONTENTNS
Group 1 Swing Bearing Group 4 Track Adjuster
Remove and Install Remove and Install Track Adjuster.........W3-4-1
Swing Bearing ........................................ W3-1-1 Disassemble Track Adjuster...................W3-4-2
Disassemble Swing Bearing .................. W3-1-4 Assemble Track Adjuster........................W3-4-8
Assemble Swing Bearing ....................... W3-1-6
Group 5 Front Idler
Group 2 Travel Device Remove and Install Front Idler................W3-5-1
Remove and Install Travel Device.......... W3-2-1 Disassemble Front Idler..........................W3-5-2
Disassemble Travel Device.................... W3-2-4 Assemble Front Idler ..............................W3-5-6
Assemble Travel Device....................... W3-2-10 Maintenance Standard..........................W3-5-10
Disassemble Travel Motor ................... W3-2-18
Assemble Travel Motor ........................ W3-2-22 Group 6 Upper and Lower Roller
Disassemble Brake Valve .................... W3-2-28 Remove and Install Upper Roller............W3-6-1
Assemble Brake Valve ......................... W3-2-30 Remove and Install Lower Roller............W3-6-4
Maintenance Standard ......................... W3-2-32 Disassemble Upper Roller ......................W3-6-8
Assemble Upper Roller.........................W3-6-10
Group 3 Center Joint Disassemble Lower Roller ....................W3-6-12
Remove and Install Center Joint ............ W3-3-1 Assemble Lower Roller.........................W3-6-14
Disassemble Center Joint ...................... W3-3-4 Maintenance Standard..........................W3-6-16
Assemble Center Joint ........................... W3-3-8
Maintenance Standard ......................... W3-3-11 Group 7 Track
Remove and Install Track .......................W3-7-1
Maintenance Standard............................W3-7-8
17VW-3-1
(Blank)
17VW-3-2
UNDERCARRIAGE / Swing Bearing
REMOVE AND INSTALL SWING BEARING
Removal
1. Put matching marks on inner race (1) of swing
bearing and track frame (2). Matching Mark
3
CAUTION: Upperstructure weight:
19000 kg (41890 lb)
Main frame weight:
6550 kg (14440 lb)
3. Remove the main frame mounting bolts (40 used)
to remove the main frame. Then, remove the
knock pins (2 used).
: 50 mm
W3-1-1
UNDERCARRIAGE / Swing Bearing
Installation
Clean the mating surfaces of track frame and the
swing bearing.
W3-1-2
UNDERCARRIAGE / Swing Bearing
(Blank)
W3-1-3
UNDERCARRIAGE / Swing Bearing
DISASSEMBLE SWING BEARING
1 2 3
10 9, 8 7 6 5 W166-03-01-001
12
11
6
7
8
10
W111-03-01-008
W3-1-4
UNDERCARRIAGE / Swing Bearing
Disassemble Swing Bearing
CAUTION: Swing bearing weight:
• Be sure to read all “Precautions for Disassembly
1080 kg (2380 lb)
and Assembly” work thoroughly on page W1-1-1
3. Hoist the swing bearing outer race (1) horizontally
before starting the disassembly work.
and slightly using lifting tool (ST 9051).
Remove fastening rod and turnbuckles (10) (3
1. Remove pin (3) located in plug (4) section by tap- used) of seal (5) to remove seals (2 and 5).
ping from the bottom side of the swing bearing.
NOTE: The pin (3) head was crimped after being 4. Place inner race (7) of the swing bearing on
driven in. Grind off the crimped part. wooden blocks, then lift outer race (1) by crane.
5. While rotating outer race (1), pull out balls (6) (76
3 used) and supports (8) (73 used) and (9) (3 used)
from the plug hole.
Use round-bar magnet (A) to take out balls. Use
tip-bent wire (B) to pull out supports (8 and 9).
4 2
W105-03-01-007
A
7
2. pull out plug (4).
NOTE: Screw bolt (M10, Pitch 1.5) in the threaded
hole in plug (4). Tap the bolt head from the
bottom side or pull the bolt to remove the
plug. 5 W105-03-01-009
6
W105-03-01-008
8, 9 W105-03-01-010
W3-1-5
UNDERCARRIAGE / Swing Bearing
ASSEMBLE SWING BEARING
1 2 3
10 9, 8 7 6 5 W166-03-01-001
12
11
6
7
8
10
W111-03-01-008
W3-1-6
UNDERCARRIAGE / Swing Bearing
Assemble Swing Bearing 3. Remove all oil on the groove surfaces of seal (2)
thoroughly. Then, apply THREEBOND #1735 to
CAUTION: Swing bearing weight:
the groove of seal (2) and install the seal.
1080 kg (2380 lb)
Install seal (5) in the groove of the inner race and
1. Align the ball grooves in inner race and outer race fasten seal (5) with rod and turnbuckle (10).
on swing bearing. (tighten each turnbuckle 10 to 15 turns evenly)
NOTE: When fasten the turnbuckle, use a round
IMPORTANT: Apply grease to balls (6) and bar (Dia. 2 to 2.3 mm (0.08 to 0.09 in )).
supports (8 and 9).
After installing all balls (6) and sup-
ports (8 and 9), confirm that the 4. Tap plug (4) and pin (3) into outer race (1).
clearance between the last ball and Crimp the head of the pin with a punch.
the first support is 40± ±5 mm (1.6±±0.2
3
in). If not, adjust the number of sup-
ports (8 or 9) so that the specified
clearance is obtained.
2. Install balls (6) (73 used) and supports (8) (73
1
used) into the plug hole in the order of one ball (6),
one support (8), one ball (6) again and so on. In-
stall the left balls (6) (3 used) and supports (9) (3
used) alternately.
4
W142-03-01-007
6
5
W142-03-01-005
9, 8
W142-03-01-006
W142-03-01-004
W3-1-7
UNDERCARRIAGE / Swing Bearing
(Blank)
W3-1-8
UNDERCARRIAGE / Travel Device
REMOVE AND INSTALL TRAVEL DEVICE
Preparation
1. Park the machine on a level solid surface. Lower
the front attachment to the ground.
W183-01-01-001
W3-2-1
UNDERCARRIAGE / Travel Device
Removal
Before removing the travel device, the tracks must be
removed first. For removal and installation of the tracks,
refer to “Remove and Install Tracks” section on page
1
W3-7-1. Blind Bolt
In this section, the procedure starts on the premise that
the tracks have already been removed.
W3-2-2
UNDERCARRIAGE / Travel Device
Installation
5. Install blind bolts onto cover (2).
: 24 mm
CAUTION: Travel device weight: 1085 kg
(2390 lb) 1
IMPORTANT: Be sure to align the matching marks Blind Bolt
made during disassembling.
1. Hoist travel device (6) by crane to install the travel
device onto the track frame with bolts (5) (24
used).
: 41 mm
: 1400 N⋅m (143 kgf⋅m, 1030 Ibf⋅ft)
9 8 7 W16J-03-02-005
W3-2-3
UNDERCARRIAGE / Travel Device
DISASSEMBLE TRAVEL DEVICE 12
11
10
9
8
7
6
4 28 25
27
26
25 29
3
30
24
23
22
21
2
20
1 18 19 31
17
32
32
33
34
35
36
37
38
39
40
41
37 50
14 15
16
13
49
48
47
46
45
44
43 W17V-03-02-001
42
1 - Bolt (4 Used) 14 - Lock Plate 27 - Pin (3 Used) 39 - Spring Pin (4 Used)
2 - Spring Washer (4 Used) 15 - Bolt (2Used) 28 - 1st Stage Planetary Gear 40 - Pin (4 Used)
(3 Used)
3- Motor 16 - Sprocket 29 - Spring Pin (3 Used) 41 - Needle Bearing (8 Used)
4- O-Ring 17 - Spring Washer (24 Used) 30 - Spacer 42 - Shaft
5- Housing 18 - Bolt (24 Used) 31 - 1st Stage Carrier 43 - Ring Gear
6- Floating Seal 19 - 3rd Stage Carrier 32 - Thrust Plate (8 Used) 44 - Socket Bolt (30 Used)
7- Roller Bearing 20 - Spacer 33 - 2nd Stage Planetary Gear 45 - Stopper Pin
(4 Used)
8- Bolt (12 Used) 21 - 3rd Stage Sun Gear 34 - Spring Pin (4 Used) 46 - Bearing
9- Support 22 - 2nd Stage Carrier 35 - Pin (4 Used) 47 - Cover
10 - Drum 23 - Spacer 36 - Needle Bearing (4 Used) 48 - Spring Washer (18 Used)
11 - Roller Bearing 24 - 2nd Sun Gear 37 - Thrust Plate (8 Used) 49 - Bolt (18 Used)
12 - O-Ring 25 - Thrust Plate (6 Used) 38 - 3 rd Stage Planetary Gear 50 - Plug (3 Used)
(4 Used)
13 - Bearing Nut 26 - Needle Bearing (3 Used)
W3-2-4
UNDERCARRIAGE / Travel Device
Disassemble Travel Device
CAUTION: Motor (3) weight: 135 kg (300 lb)
• Be sure to read all “Precautions for Disassembly
2. Put matching marks on the mounting surface of
and Assembly Work” thoroughly on page W1-1-1
motor (3) and housing (5).
before starting the disassembly work.
Install eyebolts (M12, Pitch 1.75) (2 used) into the
motor diagonally. Remove four bolts (1), then
CAUTION: Pressure may remain in the travel hoist and remove the motor by crane. Remove O-
device. Slowly loosen the air bleed plug to ring (4) from the motor.
completely release the residual pressure. : 27 mm 5
Then, remove the drain plug and drain the
gear oil into a container. 1
If the air bleed plug is loosened quickly, the
plug may fly off and/or gear oil may spurt.
Keep your face and body away from the plug. 3
W3-2-5
UNDERCARRIAGE / Travel Device
12
11
10
9
8
7
6
28 25
27
26
25 29
30
24
23
22
21
20
19 31
32
32
33
34
35
36
37
38
39
40
41
37
14 15
16
13 49
44
43 W17V-03-02-001
42
W3-2-6
UNDERCARRIAGE / Travel Device
CAUTION: The first stage carrier (31) as- 10. Install special tool (ST 3140) onto bearing nut (13)
sembly weight: 30 kg (70 lb) to loosen and remove the bearing nut.
5. Remove shaft (42) from first stage carrier (31). At-
ST 3140
tach wire ropes on first stage carrier assemblies
(25 to 31), then hoist by crane to remove them
from second stage carriers (22). Remove second
stage sun gear (24) from the second stage carrier.
CAUTION: Ring gear (43) weight: 130 kg IMPORTANT: The mating parts of support (9) and
(290 lb) housing (5) are sliding surface. Take
7. Put matching marks on the connecting parts of care not to damage the sliding sur-
ring gear (43) and drum (10). Remove socket face and put the removed drum (10)
bolts (44) (30 used).Install eyebolts (M14, Pitch assembly onto wooden blocks.
2.0) into the bolt (49) holes (2 places) in ring gear.
Hoist and remove the ring gear by crane. Remove CAUTION: Drum (10), sprocket (16) and
O-ring (12) from the drum. other parts weight: 350 kg (770 lb)
: 17 mm 11. Fix housing (5) to workbench securely. Install
eyebolts (M22, Pitch 2.5) into the bolt (44) holes
NOTE: Apply LOCTITE #262 to socket bolt (44).
(2 places) in the drum (10).
Hoist and remove the drum assembly from the
housing by crane.
CAUTION: The third stage carrier (19) as-
At this time, the inner race of roller bearing (7) is
sembly weight: 130 kg (290 lb)
also removed along with it.
8. Wind a wire rope onto third stage carrier (19).
Hoist and remove third stage carrier assemblies
(19, 20, 37 to 41) by crane. 12. Remove the inner race of roller bearing (11) from
drum (10).
Attach nylon slings (2 used) to sprocket (16) to
9. Remove bolts (15) (2 used) to remove lock plate
turn the drum assembly over.
(14).
: 19 mm
NOTE: Apply LOCTITE #262 to bolt (15). IMPORTANT: As for handling of floating seal (6),
refer to the Precautions for Floating
Seal Handling on page W1-1-4.
13. Remove the floating seal (6) from one side on
housing (5).
14. Remove the floating seal (6) from the other side
on support (9).
W3-2-7
UNDERCARRIAGE / Travel Device
11
10
9
8
7
29
30
23
22
20
18 19 31
34
37
38
39
40
41
37
16
W17V-03-02-001
W3-2-8
UNDERCARRIAGE / Travel Device
15. Put matching marks on the connecting surface of 19. Tap spring pin (39) out from pin (40) with a round
sprocket (9) and drum (10). Remove bolts (8) (12 bar [Dia: 8 mm (0.31 in)], which is installed on the
used) to remove the support from the drum. Re- third stage carrier (19) assembly.
move the inner race of roller bearing (7) from the Remove the pin to remove third stage planetary
drum. gear (38) and thrust plates (37) (2 used) from the
: 19 mm third stage carrier.
NOTE: Apply THREEBOND #1215 to the connect- Remove needle bearings (41) (2 used) from the
ing surface of support (9) and drum (10). third stage planetary gear.
W3-2-9
UNDERCARRIAGE / Travel Device
ASSEMBLE TRAVEL DEVICE
16
4 5 6 8 9 7 11 13 10 12 44 20 19 43 22 23
31
50
30
42
3
47
46
24
45
28
1 26
27
2
29
25
21 49
48
14 15 17 18 37 41 38 40 37 39 32 33 36 32 34 35
T17V-03-05-001
W3-2-10
UNDERCARRIAGE / Travel Device
Assemble Travel Device
CAUTION: Drum (10) and others weight:
• Be sure to read all “Precautions for Disassembly
175 kg (390 lb)
and Assembly Work” thoroughly on page W1-1-1
6. Install eyebolts (M22, Pitch 2.5) into the socket
before starting the assembly work.
bolt (44) holes (2 places) in drum (10).
Lift and place the drum with the cover (47) side
CAUTION: Housing (5) weight: facing down by crane.
140 kg (310 lb) Tap the outer race of roller bearing (11) with a bar
1. Wind a nylon sling on housing (5) body. Lift and and a hammer evenly to intall it onto the drum.
place the housing with motor (3) section facing NOTE: Tap the bearing and listen to ring to see if
down by crane. the installation of the outer race is
completed into drum (10).
IMPORTANT: For handling of the floating seal (6).
Refer to the section “Precautions for
CAUTION: Sprocket (16) weight:
Floating Seal Handling” on page
150 kg (330 lb)
W1-1-4.
7. Install eyebolt (M27, Pitch 3.0) into sprocket (16),
2. Apply enough grease to the O-ring of floating seal
then pass wire rope through. Hoist the sprocket by
(6). Install one half of the floating seal on housing
crane to lower it on the drum (10) assembly.
(5) using a bamboo spatula or similar tool to guide
the seal along the periphery.
IMPORTANT: Align the matching marks between
sprocket (16) and drum (10). Apply
3. Insert one half of floating seal (6) to support (9).
LOCTITE # 262 to bolt (18).
Install bolts (8) (12 used) to the support, then put
8. Install spring washer (17) to each bolts (18) (24
them into housing (5).
used). Tighten the bolts and install sprocket (16)
: 19 mm
onto drum (10).
: 88 N⋅m (9 kgf⋅m, 65 lbf⋅ft)
: 41 mm
: 1370 N⋅m (140 kgf⋅m, 1010 lbf⋅ft)
4. Tap the inner race of roller bearing (7) with a bar
and hammer evenly to install it onto housing (5).
9. Apply THREEBOND #1215 to the matching sur-
NOTE: Tap the bearing and listen to ring to see if faces of support (9) and drum (10). Apply hydrau-
the installation of the inner race is lic oil to the inner race of bearing (7).
completed into housing (5).
CAUTION: Drum (10) weight: 170 kg (370 lb) CAUTION: Drum (10), sprocket (16) and oth-
5. Install eyebolts (M12, Pitch 1.75) into the bolt (8) ers weight: 330 kg (730 lb)
holes (2 places) in drum (10). IMPORTANT: Be sure the clearance all around
Lift and place the drum with the cover (47) side support (9) in housing (5) shall be
facing down by crane. equal.
Tap the outer race of roller bearing (7) with a bar 10. Hoist the drum (10) assembly by crane and put it
and a hammer evenly to install it onto the drum. onto support (9).
NOTE: Tap the bearing and listen to ring to see if
the installation of the outer race is
completed into drum (7).
W3-2-11
UNDERCARRIAGE / Travel Device
9 11 16 13 10 20 19
47
14
15 37 41 38 40 37 39 T17V-03-05-001
W3-2-12
UNDERCARRIAGE / Travel Device
IMPORTANT: Align the matching marks between IMPORTANT: After tightening bearing nut (13), be
support (9) and drum (10). sure to check bolts (8) (12 used) for
11. Install support (9) to drum (10) and secure it with looseness. If any bolts are loose,
bolts (8) (12 used). tighten it again to the specified
: 19 mm torque.
: 88 N⋅m (9 kgf⋅m, 65 lbf⋅ft) 16. Perform procedures 14 and 15 twice and tighten
bearing nut (13) to the specified torque.
12. Install the inner race of roller bearing (11) into : 790 N⋅m (81 kgf⋅m, 590 lbf⋅ft)
housing (5) by tapping it with a bar and a hammer
evenly. IMPORTANT: If lock Plate (14) fails to engage the
spline of housing (5), tighten bearing
IMPORTANT: Install bearing nut (13) with the nut (13) further in the tightening di-
stepped part facing roller bearing rection to align with the spline.
(11). Apply a film of grease to the Apply LOCTITE #262 to bolt (15).
threaded part of the bearing nut. 17. Install lock plate (14) onto bearing nut (13) with
13. Install bearing nut (13) onto housing (5) and bolts (15) (2 used).
tighten it by hand. : 19 mm
: 88 N⋅m (9 kgf⋅m, 65 lbf⋅ft)
NOTE: Apply a film of grease to the threaded part
of bearing nut (13) so as to tighten the nut
to the specified torque. 18. Install spacer (20) onto third stage carrier (19).
14. Install special tool (ST 3140) onto bearing nut (13) IMPORTANT: There is an identification groove in
and tighten it with a wrench. the end face of third stage planetary
: 790 N⋅m (81 kgf⋅m, 590 lbf⋅ft) gear (38). Install the third stage
planetary gear with the identification
ST 3140 groove facing cover (47).
19. Install needle bearings (41) (8 used) onto third
stage planetary gears (38) (4 used). Install the
third stage planetary gear onto third stage carrier
(19) by clamping it with thrust plates (37) (8 used).
W111-03-02-018
W3-2-13
UNDERCARRIAGE / Travel Device
5 10 12 44 20 19 43 22 23
31
30
42
3
47
24
28
26
27
29
25
21 49
37 41 38 40 37 39 32 33 36 32 34 35
T17V-03-05-001
W3-2-14
UNDERCARRIAGE / Travel Device
IMPORTANT: When installing spring pin (39), be
CAUTION: Ring Gear (43) weight:
sure to let its slit face the end of pin
130 kg (290 lb)
(40).
IMPORTANT: Be sure to align the splines of ring
21. Install spring pins (39) (4 used) into third stage
gear (43) with the teeth of third stage
carrier (19) and pin (40) with a round bar (Dia: 8
planetary gears (38) (4 used). Be
mm (0.31 in)).
39 sure to align the matching marks
both on drum (10) and ring gear.
40 27. Apply grease to O-ring (12) and install it on drum
(10). Install eyebolts (M14, Pitch 2.0) into the bolt
(49) holes (2 places) in ring gear (43). Lift the ring
Slit
gear by crane and lower it to drum.
W178-02-06-002
22. Install spacer (30) to first stage carrier (31). 28. Apply LOCTITE #262 to socket bolts (44) (30
used). Install ring gear (43) onto drum (10) with
23. Install needle bearings (26) onto first stage plane- socket bolt.
tary gears (28). Clamp the first stage planetary : 17 mm
gear with thrust plates (25) (2 used) and install the : 740 N⋅m (76 kgf⋅m, 550 lbf·ft)
first stage planetary gear onto first stage carrier
(31). 29. Install third stage sun gear (21) onto third stage
Install the left first stage planetary gears (2 used) carrier (19) with the smaller and facing cover (47).
according to the same procedure. Upper
W3-2-15
UNDERCARRIAGE / Travel Device
16
4 5 6 9 43 22
50
31
42
3
47
46
45
28
25
49
48
T17V-03-05-001
W3-2-16
UNDERCARRIAGE / Travel Device
CAUTION: The first stage carrier (31) as- CAUTION: Travel device (sprocket) weight:
sembly weight: 30 kg (70 lb) 955 kg (2110 lb)
32. Hoist first stage carrier (31) assemblies (25 to 31) 40. Wind nylon sling to the matching part of housing
by crane, then install them into second stage car- (5) flange and support (9). Lift the travel device
rier (22). and turn it over by crane.
33. Install shaft (42) into the center of the carrier to 41. Fill gear oil 19 L (5.0 gal) into travel device.
engage with first stage planetary gears (28) (3
used). 42. Apply grease to O-ring (4) and install it onto motor
(3).
34. Attach a tube bar on bearing (46). Tap the tube
bar with a hammer and install the bearing onto
cover (47). CAUTION: Motor (3) weight: 135 kg (300 Ib)
Bearing inner diameter: 35 mm (1.4 in) 43. Install eyebolts (M12, Pitch 1.75) (2 used) into the
outer diameter: 80 mm (3.1 in) sling holes in motor (3). Lift the motor and install it
onto housing (5) by crane while aligning the
splines in shaft (42) with those in the motor.
35. Attach a tube bar on stopper pin (45). Tap the tube
bar with a hammer to install the stopper pin into 5
bearing (46).
Stopper pin diameter: 26 mm (1.0 in) 9
37. Install cover (47) onto ring gear (43) with bolts
(49) (18 used), and spring washers (48) (18 44. Install motor (3) into housing (5) with the bolts (4
used). used). Install spring washers (2) (4 used) to each
: 22 mm bolts (1) (4 used).
: 205 N⋅m (21 kgf⋅m, 152 lbf⋅ft) : 27 mm
: 295 N⋅m (30 kgf⋅m, 215 Ibf⋅ft)
38. Wrap the seal tape to plugs (50) (3 used) and in-
stall the plugs into cover (47).
: 17 mm
: 88 N⋅m (9 kgf⋅m, 65 lbf⋅ft)
W3-2-17
UNDERCARRIAGE / Travel Device
DISASSEMBLE TRAVEL MOTOR
4
3
2
1 17
5 16
15
6
7 14
2
13
12
11
10
9
20
8
19
18
32
21
31
30
28
29
27
26
25
24
23
22
W17P-03-02-002
1- Casing 9- Swash Plate 17 - Roller Bearing 25 - Backup Ring
2- O-Ring (4 Used) 10 - Piston (9 Used) 18 - Friction Plate 26 - Brake Piston
3- Spring (2 Used) 11 - Retainer 19 - Friction Plate (4 Used) 27 - O-Ring
4- Piston (2 Used) 12 - Holder 20 - Friction Plate 28 - Spring (10 Used)
5- Shaft 13 - Spring (9 Used) 21 - Disc Plate (5 Used) 29 - Pin (4 Used)
6- Roller Bearing 14 - Cylinder Block 22 - Backup Ring 30 - Valve Housing
7- Oil Seal 15 - Valve Plate 23 - O-Ring 31 - Socket Bolt (9 Used)
8- Steel Ball (2 Used) 16 - Collar 24 - O-Ring 32 - Pin
W3-2-18
UNDERCARRIAGE / Travel Device
Disassemble Travel Motor 3. Remove springs (28) (10 used), O-rings (2) (4
• Be sure to read all “Precautions for Disassembly used), pins (29) (4 used) and O-ring (27) from cas-
and Assembly Work” thoroughly on page W-1-1-1 ing (1).
before starting the disassembly work.
IMPORTANT: Casing (1) may move away. Fix cas-
ing (1) securely.
CAUTION: Valve housing (30) weight:
4. Install eyebolts (M12, Pitch 1.75) onto pin (29)
40 kg (90 lb)
holes (2 places) in brake piston (26). Lift the brake
IMPORTANT: Loosen socket bolts (31) (9 used)
piston and remove it from casing (1) by crane.
evenly. When loosening the socket
bolts, valve housing (30) may come NOTE: In case casing (1) moved away, tap the pe-
up from casing (1) since there is a riphery of the casing with a plastic hammer.
spring force coming from springs
(13) and (28). Note down the clear- 5. Remove O-rings (23 and 24), backup rings (22)
ance between the casing and the and (25) from brake piston (26).
valve housing.
When removing the valve housing
from the casing, valve plate (15) will CAUTION: The cylinder block (14) assembly
come out with the valve housing, do weight: 20 kg (40 lb)
not let the plate come off. IMPORTANT: If cylinder block (14) needs to be re-
1. Put matching marks on the connecting part of placed, cylinder block assemblies
valve housing (30) and casing (1). Install eyebolts (10 to 15) with valve plate (15) should
(M12, Pitch 1.75) onto the valve housing. Remove be replace.
socket bolts (31) (9 sued). Lift the valve housing 6. Place casing (1) horizontally with the brake re-
and remove it from the casing by crane. At this lease circuit at lower side. Remove cylinder block
time, the valve housing is still with the outer race (14) assemblies (10 to 15) from casing (1).
of roller bearing (17) in.
: 14 mm
1 30 NOTE: Hold cylinder block (14) and turn it left and
right lightly by two hands to take it out
31 slowly.
W3-2-19
UNDERCARRIAGE / Travel Device
4
3
17
1
5
6
7
30
W17P-03-02-002
W3-2-20
UNDERCARRIAGE / Travel Device
IMPORTANT: Do not damage the friction surface 14. Remove oil seal (7) from casing (1).
of swash plate (9).
Piston (4) and steel ball (8) may IMPORTANT: Do not remove the inner race of
come out with the swash plate, be roller bearing (17) from shaft (5) and
sure to keep the piston and the steel the outer race of roller bearing from
ball from dropping. valve housing (30) unless necessary.
9. Remove swash plate (9) from casing (1). IMPORTANT: When replacing roller bearing, take
care not to damage the surfaces of
10. Remove pistons (4) (2 used), springs (3) (2 used) the shaft and valve housing.
and steel balls (8) (2 used) from casing (1). 15. Make a clearance between shaft (5) and the inner
NOTE: If it is difficult to remove steel ball (8), clean race of roller bearing (17) using a flat chisel and a
grease first with some kerosene or thinner hammer. Pull the inner race out with a gear puller.
with the steel ball set in casing (1), and then Insert a bar into the clearance between the bear-
take it out from casing (1) with a magnet. ing and housing, then pry them to pull the inner
race of roller bearing (17) out from housing (30).
IMPORTANT: Do not damage the spline part of
shaft (5) and contact part of oil seal
(7). Oil leakage will occur if they are
damaged.
11. Tap the spline hole in shaft (5) at the most end
with a bar and hammer. Remove shaft (5) from
casing (1). At this moment, the inner race of roller
bearing (6) is connecting with the shaft.
W3-2-21
UNDERCARRIAGE / Travel Device
ASSEMBLE TRAVEL MOTOR
3 4 5 18 20 22, 23 26 24, 25 28
31
8 32
16
30
17
1
15
29
7
27
2
6 9 12 11 13 19 21 10 14 Brake Release Circuit
W17V-03-02-002
W3-2-22
UNDERCARRIAGE / Travel Device
Assemble Travel Motor
• Be sure to read all “Precautions for Disassembly IMPORTANT: Align the spherical hole in swash
and Assembly Work” thoroughly on page W1-1-1 plate (9) with steel ball (8), then in-
before starting the assembly work. stall the swash plate.
Apply grease to matching part of
IMPORTANT: Apply grease on inside periphery of casing (1) for the swash plate.
oil seal (7) for casing (1) at the 6. Install swash plate (9) onto casing (1) with its
pressed-in part and outside periph- thicker side facing down.
ery of the oil seal.
In addition, the oil seal should be IMPORTANT: Arrange disc plates (21) (5 used) with
pressed in straight to prevent it from their notch position facing same di-
deforming. rection. Then install them onto cas-
1. Press oil seal (7) into casing (1). ing (1).
7. Install friction plate (18) onto casing (1). Then in-
IMPORTANT: Install the outer race of roller bearing stall disc plates (21) (5 used) and friction plates
(6) with the stamp mark on the outer (19) (4 used) alternately. Install friction plate (20)
race facing the swash plate (9) side. at last.
2. Tap the outer race of roller bearing (6) evenly with NOTE: Friction plates (18), (20) and (19) are in
a bar and a hammer while instaling the outer race different thickness.
into casing (1). (18), (20): 4.8 mm (0.20 in)
NOTE: Tap the bearing and listen to ring to confirm (19) : 3 mm (0.1 in)
if installation is completed. In addition, align the friction plate with the
notch position of casing (1) first, then install
it.
IMPORTANT: Install the inner race of roller bearing
(6) with its collar facing swash plate IMPORTANT: Apply hydraulic oil on the piston (10)
(9). mounting hole of cylinder block (14).
3. Tap the inner race of roller bearing (6) evenly with Pay attention to the mounting direc-
a bar and a hammer while installing it into shaft tion of retainer (11).
(5). 8. Install springs (13) (9 used) and holder (12) into
Tap and install the shaft assembly to casing (1) cylinder block (14).
with a hammer. Install pistons (10) (9 used) onto retainer (11) and
install them into the cylinder block.
IMPORTANT: Apply hydraulic oil on outside pe-
riphery of steel ball (8) and piston (4).
Apply hydraulic oil the piston and
the steel ball mounting surface of
casing (1).
4. Install springs (3) (2 used), pistons (4) (2 used)
and steel balls (8) (2 used) into casing (1).
W3-2-23
UNDERCARRIAGE / Travel Device
5 22, 23 24, 25 28
31
32
16
30
17
1
15
29
9 12 21 10 14
W17V-03-02-002
W3-2-24
UNDERCARRIAGE / Travel Device
IMPORTANT: Pay attention to the mounting direc-
CAUTION: The cylinder block (14) assembly
tion for brake piston (26), so that the
weight: 20 kg (40 lb)
notch shall be square to the pin (29)
IMPORTANT: Apply hydraulic oil to the piston (10)
holes in casing (1).
sliding surface of swash plate (9)
and the spherical surface of holder 1
(12). The inner race of roller bearing
(17) is on the tip of shaft (5). Take
care not to damage them. 26
Align the shaft splines to those of
cylinder block (14) and disc plate
Notch
(21). Position
9. Install the cylinder block (14) assembly onto shaft
(5).
Ȁ
CAUTION: The casing (1) assembly weight: 29 W16J-03-02-003
55 kg (120 lb)
10. Install eyebolts (M18, Pitch 2.5) into the socket IMPORTANT: Apply grease to the outer surface of
bolts (31) holes (2 places) in casing (1). Lift the brake piston and the inner surface of
casing and place it vertically by crane. casing (1).
12. Tap brake piston (26) with a plastic hammer to in-
IMPORTANT: Apply grease to O-rings (23 and 24) stall it into casing (1).
and backup rings (22 and 25). Full at-
tention should be paid to install O- IMPORTANT: As for springs (28) (10 used), there
ring and backup ring. are twelve spring mounting holes in
11. Install backup rings (25 and 22) and O-rings (24 brake piston (26), (so pay attention
and 23) onto brake piston (26). to where the spring should be in-
NOTE: Install backup ring (22) facing the travel serted and not make mistakes).
device side. Be sure that the free holes should be
Install backup ring (25) facing the valve in diagonal position.
housing (30) side.
26
Free Hole
28
28
W16J-03-02-003
Free Hole
W3-2-25
UNDERCARRIAGE / Travel Device
5 26
31
32
16
30
17
1
15
29
27
2
W17V-03-02-002
W3-2-26
UNDERCARRIAGE / Travel Device
IMPORTANT: Install the outer race of roller bear-
CAUTION: Valve housing (30) weight:
ing (17) with the stamp mark on the
40 kg (90 lb)
outer race facing the valve plate (15)
IMPORTANT: When installing valve housing (30)
side.
into casing (1), be sure to confirm
14. Tap the outer race of roller bearing (17) evenly
the clearance value between the cas-
with a bar and a hammer to install the outer race
ing and the valve housing is equal to
into valve housing (30).
that noted on disassembling.
Install the inner race to shaft (5).
If the value is different, disassemble
NOTE: Tap the bearing and listen to ring to confirm them and reassemble again.
if the outer race is installed to the most end IMPORTANT: Align the matching marks made
of valve housing (30). when disassembling. If the matching
marks can not be aligned with each
IMPORTANT: Apply grease to the mating surfaces other, brake piston (26) may be in-
of valve plate (15) and valve housing stalled in wrong direction.
(30). 17. Install eyebolt (M12, Pitch 1.75) into the bolt hole
15. Install collar (16) into valve housing (30). Align pin in valve housing (30).
(32) with the pin hole on valve plate (15) to install Hoist valve housing to put it onto casing (1) while
the valve plate into the valve housing. aligning the pin (29) hole in brake piston (26).
Install the valve housing onto the casing with
IMPORTANT: Apply grease to O-rings (2 and 27). socket bolts (31) (9 used).
16. Install O-rings (27) and (2) (4 used) into casing (1) : 14 mm
and install pins (29) (4 used) to valve housing : 440±22 N⋅m
(30). (45±2.2 kgf⋅m, 330±16.0 lbf⋅ft)
NOTE: Tighten socket bolts (31) (9 used) evenly.
1 30
31
Eyebolt Install-
ing Position
W16J-03-02-002
W3-2-27
UNDERCARRIAGE / Travel Device
DISASSEMBLE BRAKE VALVE
6
1 7
2 8
3 5
4 9
10 Plug
11
10 9
35
Orifice
12
36 13
37 14
38 16 15
39 18
40 20
21
48
17 22
19
24
26 5
47
49
46 28 23
10 30 25
9
41 32
27 33
42 34
43 29
44 31
4
45 3
Orifice 2
1
44
43
36 42
41
50
40
39
35
38
37
W183-03-02-010
W3-2-28
UNDERCARRIAGE / Travel Device
Disassemble Brake Valve
CAUTION: The valve housing (46) assembly IMPORTANT: Do not disassemble overload relief
weight: 40 kg (90 lb) valves (5) (2 used). The overload re-
1. Secure the valve housing (46) assembly on a firm lief valve should be replaced as as-
workbench. sembly. Attach tags on each over-
load relief valves so that they can be
2. Remove plugs (6 and 15) and O-rings (7 and 14). installed to their original positions.
Then remove spring (8). In addition, do not rotate set screw
: 10 mm (34), or the setting pressure can
change.
IMPORTANT: Remove valve assembly (13) while 5. Loosen plug (32) to remove overload relief valve
rotating it. If a little resistance is felt (5) from valve housing (46). (2 places at right and
while removing, do not try to remove left)
it by force, return to original position : 36 mm
and retry.
In addition, do not disassemble the 6. Press cap (36) while loosening socket bolts (35)
valve assembly. In case replacement (4 used) to remove the cap from valve housing
should be carried out to any parts of (46). (2 places at right and left)
it, be sure to replace it with the valve : 10 mm
housing (46) assembly including NOTE: In case cap (36) can not be removed, a
spool assembly (50), valve assembly plastic hammer can be used to tap the cap,
(13), orifices (11 and 49) and the however, the loosened socket bolts (35)
plug. should be still on the cap while tapping.
3. Press valve assembly (13) out carefully and rotate
the valve assembly by hand to remove it from 7. Remove spring seat (38), spring (39) and spring
valve housing (46). seat (40) from valve housing (46). (2 places at
right and left)
4. Remove plug (1). Then remove O-ring (2), spring
(3) and check valve (4). (2 places at right and left) IMPORTANT: Remove spool assembly (50) while
: 14 mm rotating it. In case a little resistance
is felt while removing, do not try to
remove it by force, return to original
position and retry.
8. Press spool assembly (50) out carefully. Rotate
the spool assembly by hand to remove it from
valve housing (46).
W3-2-29
UNDERCARRIAGE / Travel Device
ASSEMBLE BRAKE VALVE
Overload Relief Valve (5)
16 18 21 26 24 27 31 29 32 33
34
17, 19 20 22 23, 25 28 30
36 38
41
6
37
35 39
42
A A A
7
40
43
8
44
45
13
50
14
48 47
12
15
46
5 2 1 3 4 W17P-03-02-004
Section A-A-A
W3-2-30
UNDERCARRIAGE / Travel Device
Assemble Brake Valve
W3-2-31
UNDERCARRIAGE / Travel Device
MAINTENANCE STANDARD
W507-02-04-009
Piston
W107-02-06-140
Casing
W3-2-32
UNDERCARRIAGE / Travel Device
Sprocket
C
D
E
A
W105-03-07-042
Unit: mm (in)
Standard Dimension Allowable Limit Remedy
A 114 (4.5) -
B 104.5 (4.1) 99.5 (3.9)
Cladding by weld-
C 139 (5.5) -
ing and finishing
D 162 (6.4) 157 (6.2)
E 260.35 (10.2) -
W3-2-33
UNDERCARRIAGE / Travel Device
(Blank)
W3-2-34
UNDERCARRIAGE / Center Joint
REMOVE AND INSTALL CENTER JOINT
Preparation
1. Park the machine on a level solid surface. Lower
the front attachment to the ground.
W183-01-01-001
W3-3-1
UNDERCARRIAGE / Center Joint
Removal
Front
9- From the right side of travel motor for right travel device
10 - To P2 port in travel motor for right travel device
11 - To P1 port in travel motor for right travel device
12 - From the upper side of travel motor for right travel device
13 - From the upper side of travel motor for left travel device
14 - To P2 port in travel motor for left travel device
15 - To P1 port in travel motor for left travel device
16 - From the left side of travel motor for left travel device
W3-3-2
UNDERCARRIAGE / Center Joint
Installation
16 17 Center Joint
9
CAUTION: Center joint weight: 52 kg (110 lb) 10
IMPORTANT: Align the matching marks made dur-
ing disassembling.
1. Install spring washers onto each bolts (17). Install Track
the center joint to the track frame with bolts (4 Frame
used).
: 24 mm
: 210 N⋅m (21.5 kgf⋅m, 156 lbf⋅ft) 15
14 11
2. Connect hoses (9 to 16) to the lower side of the 13 W16J-03-03-003
center joint. 12
: 22 mm
: 39 N⋅m (4 kgf⋅m, 29 lbf⋅ft)
: 27 mm Front
: 93 N⋅m (9.5 kgf⋅m, 69 lbf⋅ft)
: 41 mm 9- From the right side of travel motor for right travel device
: 205 N⋅m (21 kgf⋅m, 152 lbf⋅ft) 10 - To P2 port in travel motor for right travel device
11 - To P1 port in travel motor for right travel device
12 - From the upper side of travel motor for right travel device
3. Install spring washers onto bolts (8). Insert the 13 - From the upper side of travel motor for left travel device
washers between stopper (7) and the spindle. In- 14 - To P2 port in travel motor for left travel device
stall the stopper into the spindle with the bolts (2 15 - To P1 port in travel motor for left travel device
16 - From the left side of travel motor for left travel device
used).
: 22 mm
Front
: 137 N⋅m (14 kgf⋅m, 101 lbf⋅ft)
7 8 1
4. Connect hoses (3 and 4) to the spindle. 2
: 27 mm
6
: 93 N⋅m (9.5 kgf⋅m, 69 lbf⋅ft)
: 19 mm
: 29.5 N⋅m (3 kgf⋅m, 21.5 lbf⋅ft)
W3-3-3
UNDERCARRIAGE / Center Joint
DISASSEMBLE CENTER JOINT
1
3
4
9
6
10
11
12
W16J-03-03-001
W3-3-4
UNDERCARRIAGE / Center Joint
Disassemble Center Joint
• Be sure to read all “Precautions for Disassembly 5. Install special tool (ST 1930) onto body (7) with
and Assembly” work thoroughly on page W1-1-1 bolts (12) (2 used).
before starting the disassembly work. : 19 mm
ST 1020
ST 1930 12
CAUTION: Center joint weight: 52 kg (110 lb)
1. Remove bolts (12) (2 used) in diagonal position
from cover (11). Install eyebolts (M12, Pitch 1.75)
into the bolt holes for using wire rope. 7
Lift and place the center joint on workbench by
crane.
: 19 mm
Eyebolts
W183-03-03-004
11
CAUTION: Spindle (2) weight: 22 kg (50 lb)
Body (7) weight: 29 kg (60 lb)
12
6. Tighten pressing bolt (ST 1020) of special tool (ST
1930) and press spindle (2) down out of body (7).
WorkBench When the spindle head makes contact with floor,
remove the special tool. Install eyebolt (M12, Pitch
1.75) into the bolt (12) holes (2 places) in the body
W183-03-03-003
and attach wire ropes through them. Press the
spindle while hoisting and removing the body by
crane.
2. Remove bolts (12) (2 used) and eyebolts (2 used)
to remove cover (11) from body (7).
: 19 mm IMPORTANT: It is easier to remove oil seal (6) if
two pins are used. However, take
care not to damage the seal groove
3. Remove O-ring (10), retaining ring (9) and ring (8)
with the pins.
from body (7).
7. Remove oil seals (6) (6 used) from body (7).
Matching Marks 7
7 6
W105-03-03-015
W142-03-03-004
W3-3-5
UNDERCARRIAGE / Center Joint
3
4
W16J-03-03-001
W3-3-6
UNDERCARRIAGE / Center Joint
8. Remove dust seal (3) and O-ring (4) from body
(7).
W3-3-7
UNDERCARRIAGE / Center Joint
ASSEMBLE CENTER JOINT
8
10
12
9
11
W183-03-08-001
W3-3-8
UNDERCARRIAGE / Center Joint
Assemble Center Joint
• Be sure to read all “Precautions for Disassembly
and Assembly” work thoroughly on page W1-1-1 CAUTION: Spindle (2) weight: 22 kg (50 lb)
before starting the assembly work. Body (7) weight: 29 kg (60 lb)
IMPORTANT: Apply grease to the slide surface for
dust seal (3) on spindle (2) and inner
IMPORTANT: Apply grease to the bushing (5)
surfaces of oil seal (6) and bushing
mounting portion on body (7).
(5).
1. When bushing (5) is removed, press bushing (5)
4. Place spindle (2) on a workbench with its upside
into body (7) first. (Refer to page W3-3-10)
down. Install eyebolts (M12, Pitch 1.75) into the
bolt (12) holes (2 places) in body (7). Lift and
IMPORTANT: Apply grease to the dust seal (3) place the body while aligning the matching mark
mounting portion on body (7). The with that of spindle by crane.
lip portion of dust seal must face the
body side.
2. Install O-ring (4) and dust seal (3) onto body (7).
5. Tap the circumference of body (7) evenly with a
plastic hammer while installing the body into spin-
3. Install oil seals (6) (6 used) onto body (7). dle (2).
IMPORTANT: The clearance between body (7) and IMPORTANT: Install ring (8) with the chamfered
spindle (2) is approx. 0.05 mm (0.002 edge facing the inside of body (7).
in). So that the center of the body is 6. Install ring (8) into body (7).
aligned with that of spindle (2) dur-
ing installation.
IMPORTANT: Install retaining ring (9) with its
Be sure to slowly push the spindle
chamfered edge facing ring (8).
into the body. Failure to do so may
7. Install retaining ring (9) into spindle (2).
damage seals.
No steps are allowed to form at por-
tion A (the mounting position for 8. Install O-ring (10) into body (7) and install cover
ring (8)) shown below. (11) with bolts (12) (4 used).
: 19 mm
: 88 N⋅m (9 kgf⋅m, 65 Ibf⋅ft)
2
0.05 mm (0.002 in)
A
W105-03-03-024
W3-3-9
UNDERCARRIAGE / Center Joint
When replacing the body or spindle with a new one,
the following procedures are required.
1
ST 2670
2
7
Sleeve
0.4 mm
(0.02 in)
or more
5
Detail D
W136-03-03-031
W135-03-03-001
W105-03-03-029
ST 2559
Ball
W157-03-03-004
W3-3-10
UNDERCARRIAGE / Center Joint
MAINTENANCE STANDARD
T157-01-01-040
W3-3-11
UNDERCARRIAGE / Center Joint
(Blank)
W3-3-12
UNDERCARRIAGE / Track Adjuster
REMOVE AND INSTALL TRACK AD-
JUSTER
Removal W142-03-04-002
Installation
1. As illustrated, install track adjuster (1) into spring
guide (3) on track frame (2).
At that time, make sure that track adjuster (1) is A
inserted exactly with its end face touching the face
of plate (4).
W17V-03-04-002
2 3
Viewed from A
W17V-03-04-003
W3-4-1
UNDERCARRIAGE / Track Adjuster
DISASSEMBLE TRACK ADJUSTER
1
2
3
4
5
6
7
8
9
10
11
12
13
18
17
14
15
16
W162-03-04-001
W3-4-2
UNDERCARRIAGE / Track Adjuster
Disassemble Track Adjuster
• Be sure to read all “Precautions for Disassembly IMPORTANT: Compress the spring until the clear-
and Assembly” work thoroughly on page W1-1-1 ance between bracket (15) and nut
before starting the disassembly work. (16) is approximately 10 mm (0.4 in).
Use a pump unit which has the maximum pres- 2. Loosen valve (17). Compress track adjuster
2
sure of 69 MPa (700 kgf/cm , 9950 psi) and the spring (13) using special tool (ST 4932).
flow rate of 8 to 10 liters (2.1 to 2.6 gal). Be sure : 24 mm
to set the main relief pressure to 49 MPa (500
2
kgf/cm , 7110 psi) (80 tons) or lower. 13
Clearance 10 mm (0.4 in)
16 18
CAUTION: Carefully perform disassembly 10
and assembly work because the spring force 17
of the track adjuster is extremely large.
Thoroughly inspect the special tool for any
damage to prevent personal injury.
W17V-03-04-006
CAUTION: Track adjuster assembly weight:
545 kg (1200 lb) IMPORTANT: Put matching marks on rod (10) and
1. Position the track adjuster on the rest of special nut (16).
tool (ST 4932) by crane. 3. Remove valve (17) and bolt (18) to remove nut
(16).
: 24 mm, 19 mm, 140 mm
ST 4932
Rest
W142-03-04-019
W3-4-3
UNDERCARRIAGE / Track Adjuster
12
13
14
15 W162-03-04-001
W3-4-4
UNDERCARRIAGE / Track Adjuster
4. Slowly return the piston of special tool (ST 4932)
CAUTION: Cylinder (12) assembly weight:
until spring (13) extends to its free length.
170 kg (370 lb)
NOTE: Spring (13) free length: 1005 mm (39.6 in) 7. Remove the lifting belt attached from spring (13).
Attach a lifting belt on cylinder (12) and pass the
belt through the eyebolt. Lift and remove cylinder
CAUTION: Track adjuster weight:
(12) assembly from the spring.
540 kg (1190 lb)
5. Bind bracket (15) and spring (13) together with
Eyebolt
wire. Attach a lifting belt to spring on track ad-
juster. Lift and remove track adjuster from special
tool (ST 4932) by crane. 12
ST 4932
13
13
15
Rest
W17V-03-04-004
W142-03-04-005
CAUTION: Spring (13) weight: 305 kg (670 lb)
6. Install eyebolt (M16, Pitch 2.0) onto piston rod (4). 8. Remove the wire fastening spring (13) and
Attach a lifting belt around spring (13). Through bracket (15). Lift and remove the spring by crane.
the eyebolt then, lift and position the assembly on
the rest by crane, as illustrated.
CAUTION: Bracket (15) weight: 35 kg (80 Ib)
Eyebolt 9. Remove spacer (14) and bracket (15) out of the
rest.
4
13
Rest
W142-03-04-006
W3-4-5
UNDERCARRIAGE / Track Adjuster
1
2
3
4
5
6
7
8
9
10
11
12
W162-03-04-001
W3-4-6
UNDERCARRIAGE / Track Adjuster
12
10 8 W162-03-04-002
W142-03-04-010
W3-4-7
UNDERCARRIAGE / Track Adjuster
ASSEMBLE TRACK ADJUSTER
3 1 12 8, 9 11 14 10 16 18 17
Grease Outlet
2 4 5 6, 7 B 13 15 W17V-03-04-005
W3-4-8
UNDERCARRIAGE / Track Adjuster
Assemble Track Adjuster
IMPORTANT: Apply grease to wear ring (5), CAUTION: Piston rod (4) weight: 50 kg (110 Ib)
backup ring (6), U-ring (7) and plate IMPORTANT: Fill chamber (B) in cylinder (12) with
(8). Install the U-ring with the lip side grease and insert piston rod (4) to
facing rod (10). bleed air completely out from cham-
After applying hydraulic oil to the in- ber (B) and from the inside of rod
ner surface of cylinder (12), to the (10).
rod and piston rod (4), reassemble 3. Fill cylinder (12) fully with grease. Install eyebolt
them. (M16, Pitch 2.0) into piston rod (4) and lift it up by
1. After cleaning all parts, install wear ring (5), crane. Install the piston rod into cylinder (12) after
backup ring (6), U-ring (7), plate (8) and retaining being applied with grease.
ring (9) onto piston rod (4).
4 IMPORTANT: Fill V-groove in guide (3) with
5 grease.
6 4. Install O-ring (2) after being applied with grease
7 onto guide (3). Install the guide onto piston rod (4).
8 Apply LOCTITE #262 to socket bolts (1) (6 used)
9 and tighten them.
: 12 mm
: 140 N⋅m (14 kgf⋅m, 101 lbf⋅ft)
2
3 1
Lifting Hole
10
12
11
W17V-03-04-001
W3-4-9
UNDERCARRIAGE / Track Adjuster
12 14
Grease Outlet
4 13 15
W17V-03-04-005
W3-4-10
UNDERCARRIAGE / Track Adjuster
13
ST 4932
W142-03-04-005
W3-4-11
UNDERCARRIAGE / Track Adjuster
10 13 15 18 17
Grease Outlet
16
W3-4-12
UNDERCARRIAGE / Track Adjuster
IMPORTANT: Be sure to slowly compress spring
(13) while aligning the center of rod
(10) with the center of bracket (15)
using a crowbar.
Take care not to damage the threads
in rod. 13
9. Remove wire from spring (13). Compress spring
ST 4932
(13) by operating the cylinder of special tool (ST
4932) until the specified spring length is obtained.
(Specified Spring Length: 805 mm (31.7 in)) 15
W3-4-13
UNDERCARRIAGE / Track Adjuster
(Blank)
W3-4-14
UNDERCARRIAGE / Front Idler
REMOVE AND INSTALL FRONT IDLER
Removal
Before removing the front idler, the tracks must be
removed first. For removal and installation of the
tracks, refer to “Remove and Install Tracks” section.
In this section, the procedure starts on the premise that
the tracks have already been removed.
2. Attach lifting belts to bearing (5) and yoke (4) Removing Direction
sections as shown. Lift and remove the front idler
assembly from track frame (2) by crane. 1
2
3. Loosen bolts (3) and remove guard (1) from yoke
(4).
Wooden Block
Wooden Block
Installation
CAUTION: Front idler weight: 490 kg (1080 Ib)
1. The procedures to install front idler are just the re-
verse of those for removal. However, pay attention W105-03-05-003
to following:
• Apply grease to the bearing (5) sliding surface on
track frame (2) after cleaning. Installing Direction
W142-03-05-005
W3-5-1
UNDERCARRIAGE / Front Idler
DISASSEMBLE FRONT IDLER
1
2
3 8
7
4
6
6 9
5
10
4
3
2 11
8 14 13 12
W162-03-05-001
W3-5-2
UNDERCARRIAGE / Front Idler
Disassemble Front Idler
• Be sure to read all “Precautions for Disassembly
and Assembly” work thoroughly on page W1-1-1 CAUTION: Bearing weight: 30 kg (70 lb)
before starting the disassembly work. Idler and other weight:
300 kg (660 lb)
Axle weight + bearing weight:
1. Remove bolts (10) (4 used) to remove guard (9),
75 kg (170 lb)
spring washers (11) (4 used) from yoke (12).
4. Set idler (7) assembly onto press. Press out axle
: 19 mm
from idler assembly with a press. At this time,
bearing (2) on other side will be removed together
CAUTION: Idler assembly weight: with the axle.
370 kg (820 lb)
Yoke weight: 80 kg (180 lb)
IMPORTANT: Keep idler (7) steady with wooden Press
blocks to prevent it from tilting over.
2 5
2. Attach a nylon sling to yoke (12) and hold idler (7)
vertically by crane. Remove bolts (13) (4 used)
1
and spring washers (14) (4 used) to remove the
yoke.
Remove plug (8) from the end of bearing (2) to 7
drain oil.
: 36 mm
: 6 mm
2
3. Put matching marks to bearing (2) and axle (5).
Tap pin (1) out from the bearing with a bar (Dia. 25 W17P-03-05-002
3
7
4
5
W105-03-05-009
W3-5-3
UNDERCARRIAGE / Front Idler
1
2
4
6
6
5
4
2
1
W162-03-05-001
W3-5-4
UNDERCARRIAGE / Front Idler
IMPORTANT: For handling of floating seal (3), re- IMPORTANT: Do not remove bushing (6) unless
fer to the section “Precautions for necessary.
Floating Seal Handling” on page 9. When replacing bushing (6), pull the bushing out
W1-1-4. with bushing pulling tool (ST 1914) and press.
6. Remove floating seals (3) from idler (7) and bear-
ing (2).
Press
4
1
2
Wooden
Block
W105-03-05-010
W3-5-5
UNDERCARRIAGE / Front Idler
ASSEMBLE FRONT IDLER
2 3 6 4 1 9 10, 11 12 13, 14
7 5 8
W162-03-05-002
W3-5-6
UNDERCARRIAGE / Front Idler
Assemble Front Idler
CAUTION: Idler (7) weight: 290 kg (640 lb) IMPORTANT: For handling of floating seal (3), re-
1. Install bushings (6) (2 used) into both sides of fer to the section “Precautions for
idler (7) with a press. Floating Seal Handling” on page
W1-1-4.
Apply grease to O-ring on the floating
seal.
CAUTION: Axle (5) weight: 45 kg (100 Ib)
4. Install one of pair floating seal (3) (1 used) into
IMPORTANT: Support axle (5) to prevent it from
idler (7) and bearing (2).
tilting over.
2. Attach a nylon sling on axle (5). Lift and place the
axle vertically by crane. Apply enough grease onto CAUTION: Axle (5) assembly weight:
O-ring (4) and install the O-ring (1 used) onto the 75 kg (170 lb)
upper side of the axle. IMPORTANT: Support axle (7) to prevent it from
tilting over.
IMPORTANT: Align the matching marks put during 5. Attach a nylon sling to bearing (2) for the axle (5)
disassembling. assembly. Lift the axle assembly by crane and
3. Apply grease onto inner diameter of bearing (2). insert it into idler (7) from the side where floating
Insert the bearing to axle (5) at the side where O- seal (3) is installed already.
ring is installed. Tap the end face of bearing
evenly with a plastic hammer while aligning the 7
hole for pin (1). Insert the pin into bearing with a
bar and hammer. 3
2
5
5
2
W157-03-05-006
W3-5-7
UNDERCARRIAGE / Front Idler
3 2 4 1 9 10, 11 12 13, 14
W162-03-05-002
7 5 8
W3-5-8
UNDERCARRIAGE / Front Idler
IMPORTANT: Apply grease to the O-ring of float- IMPORTANT: Apply LOCTITE #503 to plug (8).
ing seal (3). 12. Install plug (8) to bearing (2).
7. Install the other floating seal (3) into idler (7) and : 6 mm
bearing (2). : 20 N⋅m (2 kgf⋅m, 14.5 lbf⋅ft)
CAUTION: Bearing weight: 30 kg (70 lb) CAUTION: Yoke (12) weight: 80 kg (180 lb)
IMPORTANT: Align the matching marks put during 13. Attach a nylon sling to yoke (12). Lift and align the
disassembling. bolt (13) hole in the yoke with that in bearing (2).
8. Apply grease on inner diameter of bearing (2). Tap
the end face of bearing (2) evenly with a plastic 14. Install spring washers (14) (4 used) onto each bolt
hammer while aligning the hole for pin (1). Insert (13) (4 used). Install yoke (12) onto bearing (2)
the pin into bearing with a bar and hammer. with the bolts (4 used) on both sides.
2 : 36 mm
3 : 690 N⋅m (70 kgf⋅m, 510 lbf⋅ft)
5
4
15. Install spring washers (11) onto each bolt (10) (4
used). Install guard (9) onto yoke (12) with bolts (4
used).
: 19 mm
: 88 N⋅m (9 kgf⋅m, 65 Ibf⋅ft)
7
W17P-03-05-003
W3-5-9
UNDERCARRIAGE / Front Idler
MAINTENANCE STANDARD
C D
A W166-03-05-001
Unit: mm (in)
Standard Allowable Limit Remedy
A 126 (5.0) −
B 260 (10.2) −
Clad by welding and
C 800 (31.5) 780 (30.7)
finish or replace
D 845 (33.3) −
E 22.5 (0.9) 32.5 (1.3)
Unit: mm (in)
Standard Allowable Limit Remedy
Axle Outside Dia. 120 (4.7) [119.2 (4.7)]
Inside Dia. 120 (4.7) [121 (4.8)] Replace
Bushing
Flange Thickness 6 (0.2) [5.2 (0.2)]
W3-5-10
UNDERCARRIAGE / Upper and Lower Roller
REMOVE AND INSTALL UPPER ROLLER
Removal
CAUTION: Grease pressure in the adjusting
cylinder is high. Do not loosen valve (1)
quickly or loosen it too much as the valve
may fly off or high-pressure grease in the ad-
justing cylinder may gush out.
Loosen carefully and keep body parts and
face away from the valve. Never loosen
grease fitting (2).
IMPORTANT: Clean off any mud or gravel packed W105-03-06-001
between sprockets and tracks be-
fore loosening valve (1). It is enough 2 1
to loosen the valve by 1 to 1.5
turns.
1. Loosen valve (1) on the track adjuster to drain
grease to release the tension of track link.
: 24 mm
Grease Outlet
M116-07-094
Oil Jack
3. Insert wooden blocks under upper roller (3).
Wooden Block
5 3
W116-03-06-001
Wooden Block
W116-03-06-002
W3-6-1
UNDERCARRIAGE / Upper and Lower Roller
4. Remove mounting bolts (6) (4 used) from upper
roller (3). 3
: 30 mm
6
W116-03-06-002
3 5
W116-03-06-003
4
Installation
CAUTION: Upper roller weight: 60 kg (130 lb)
1. Lift upper roller (3) and insert it between track
frame (5) and track (4) by crane.
Insert wooden blocks between upper roller and
the track frame to hold the upper roller. Align the
holes for bolt (6) and install upper roller with bolts
(4 used).
: 30 mm
: 540 N⋅m (55 kgf⋅m, 400 lbf⋅ft) 3
W116-03-06-003
5
2. Remove the wooden blocks and oil jack.
6
W116-03-06-002
W3-6-2
UNDERCARRIAGE / Upper and Lower Roller
3. Tighten valve (1) on the track adjuster.
: 24 mm 2 1
: 147 N⋅m (15 kgf⋅m, 108 lbf⋅ft)
W157-03-06-002
W3-6-3
UNDERCARRIAGE / Upper and Lower Roller
REMOVE AND INSTALL LOWER ROLLER
Removal
CAUTION: Track guard weight: 86 kg (190 Ib)
1. Remove the track guard. 1
: 41 mm
W105-03-06-008
90° to 110°
2 M104-07-067
Grease Outlet
M116-07-094
W3-6-4
UNDERCARRIAGE / Upper and Lower Roller
5
W105-03-06-010
Installation
CAUTION: Lower roller weight: 143 kg (320 lb)
1. Put lower roller (5) under track frame (2) using a
fork lift.
5 W105-03-06-011
W105-03-06-008
W3-6-5
UNDERCARRIAGE / Upper and Lower Roller
4. Tighten valve (3) on track adjuster.
: 24 mm 4 3
: 147 N⋅m (15 kgf⋅m, 108 lbf⋅ft)
W157-03-06-002
W3-6-6
UNDERCARRIAGE / Upper and Lower Roller
(Blank)
W3-6-7
UNDERCARRIAGE / Upper and Lower Roller
DISASSEMBLE UPPER ROLLER
11
9 10
8
7 12
6
5
4
3
2
1
W17V-03-06-001
W3-6-8
UNDERCARRIAGE / Upper and Lower Roller
Disassemble Upper Roller
• Be sure to read all “Precautions for Disassembly 6. When bushings (8), (10) are to be replaced, pull
and Assembly” work thoroughly on page W1-1-1 the bushing out with bushing pulling tool (ST
before starting the disassembly work. 1967) and a press .
ST 1967
2. Put matching marks to roller (9) and cover (4).
Remove bolts (1) (3 used) to remove cover (4). 8
: 17 mm
NOTE: Insert a driver between cover (4) and roller
(9). Pry the cover to remove it with the 10
driver.
W3-6-9
UNDERCARRIAGE / Upper and Lower Roller
ASSEMBLE UPPER ROLLER
11 12
10 9 8 7
W142-03-06-002
W3-6-10
UNDERCARRIAGE / Upper and Lower Roller
Assemble Upper Roller
• Clean all parts before reassembling. 6. Align the matching marks put during disassem-
• For any part scored or with coarse surface, be bling. Install cover (4) to roller (9) and tighten it
sure to finish them with an oil stone. with bolts (1) (3 used).
• In a general way, parts, such as O-rings and seals, : 17 mm
should be replaced with new ones. : 49 N⋅m (5 kgf⋅m, 36 lbf⋅ft)
NOTE: If the bolt (1) hole is failure to be aligned, a
IMPORTANT: The force can be applied to press in bar can be used to move cover (4) so as to
the bushing of roller (9) when replac- align bolt holes both in roller (9) and the
ing bushings (8), (10). cover.
Force for bushing (8): 20 ton
Force for bushing (10): 2.1 to 3.7 ton 7. Fill engine oil via plug (3) hole in cover (4).
1. Press bushings (8), (10) to roller (9). Engine oil: API CD class SAE#30
Capacity: 0.2 L (0.053 gal.)
IMPORTANT: Apply grease to the O-ring part on
floating seal (12) and apply oil to the 8. Apply LOCTITE #503 or equivalent to plug (3),
steel ring. then install the plug into cover (4).
As for handling of floating seal , re- : 6 mm
fer to the section “Precautions for : 20 N⋅m (2 kgf⋅m, 14.5 lbf⋅ft)
Floating Seal Handling” on page
W1-1-4.
2. Install floating seal (12) onto axle (11) and roller
(9).
NOTE: Install O-ring with grease applied to the
seal ring. Push into the O-ring with a driver
and install it to the axle and roller.
Take care not to damage O-ring when the
driver is used.
W3-6-11
UNDERCARRIAGE / Upper and Lower Roller
DISASSEMBLE LOWER ROLLER
5
4
3 6
7
5
6 7
1
3
4
W166-03-06-006
W3-6-12
UNDERCARRIAGE / Upper and Lower Roller
Disassemble Lower Roller
• Be sure to read all “Precautions for Disassembly 5. Remove floating seal (1) from roller (8) and collar
and Assembly” work thoroughly on page W1-1-1 (4).
before starting the disassembly work.
4 1 8 1
IMPORTANT: Put matching marks to collar (4) and
axle (2).
1. Remove plug (6) from the end of collar (4) to drain 1
oil. (at 2 places). Pull pin (5) out from collar (4) (at
2 places) with a bar (Dia. 25 mm (1.0 in)) and 4
hammer.
: 6 mm
press, remove the collar from axle. 6. Set axle (2) assembly on press and push the axle
out from collar (4).
NOTE: Collar (4) can be removed if axle (2) is
pressed down by approx. 55 mm (2.2 in) 4
with a press.
CAUTION: Axle (2) weight + collar (4) weight: 7. Remove O-ring (3) from axle (2).
48 kg (110 lb) NOTE: Replace O-ring (3) because the O-ring is
4. Push axle (2) assembly out from roller (8). damaged when disassembling.
ST 1973
W105-03-06-028
W3-6-13
UNDERCARRIAGE / Upper and Lower Roller
ASSEMBLE LOWER ROLLER
4 5 6
8 2 7 1 3
W162-03-06-002
W3-6-14
UNDERCARRIAGE / Upper and Lower Roller
Assemble Lower Roller
CAUTION: Roller (8) weight: 81 kg (180 lb) CAUTION: Axle assembly weight: 48 kg (110 Ib)
Axle (2) weight: 38 kg (80 lb) 4. Insert axle (2) into roller (8). Install O-ring (3) with
1. Install bushings (7) (2 used) onto roller (8) with a the grease applied over the axle. Install the other
press. Take care not to dent the flange surface of floating seal (1) to collar (4) in same procedures.
bushing (7). Then secure them with pin (5).
Apply a coat of grease to O-ring (3) and install the
O-ring onto axle (2). 5 1 2 8
W105-03-06-024
1 4
W157-03-06-008
W3-6-15
UNDERCARRIAGE / Upper and Lower Roller
MAINTENANCE STANDARD
Upper Roller
• Roller
B
W166-03-06-007
Unit: mm (in)
Standard Allowable Limit Remedy
A 118 (4.6) −
Clad by welding and
B 240 (9.4) −
finish or replace
C 200 (7.9) 180 (7.1)
Unit: mm (in)
Standard Remedy
Axle Outside Dia. 75 (3.0)
Inside Dia. 75 (3.0) Replace
Bushing
Flange Thickness 4.5 (0.2)
W3-6-16
UNDERCARRIAGE / Upper and Lower Roller
Lower Roller
• Roller
W157-03-06-003
Unit: mm (in)
Standard Allowable Limit Remedy
A 274 (10.8) −
B 356 (14.0) − Clad by welding and
C 41 (1.6) − finish or replace
D 240 (9.4) 220 (8.7)
Unit: mm (in)
Allowable Limit Remedy
Axle Outside Dia. 110 (4.3)
Inside Dia. 110 (4.3) Replace
Bushing
Flange Thickness 6 (0.2)
W3-6-17
UNDERCARRIAGE / Upper and Lower Roller
(Blank)
W3-6-18
UNDERCARRIAGE / Track
REMOVE AND INSTALL TRACKS
Removal
CAUTION: Grease pressure in the adjusting IMPORTANT: It is enough to loosen the valve (2)
cylinder is high. Do not loosen valve (2) by 1 to 1.5 turns. Do not loosen it
quickly or loosen it too much as high- over that degree.
pressure grease in the adjusting cylinder may 2. Loosen valve (2) for track adjuster to drain grease
gush out. out.
Loosen carefully and keep body parts and : 24 mm
face away from the valve. Never loosen
grease fitting (1).
1 2
W105-03-07-001
Wooden
Block
W105-03-07-006
W3-7-1
UNDERCARRIAGE / Track
3. Remove pin (7), which is used to secure the mas-
ter pin (5). If it is difficult to remove the pin from
master pin (6), drive in the master pin first with a
hammer to make clearance between the pin and 6
master link before attempting to pull out the pin.
5
7
W116-03-07-001
W105-03-07-008
Pin
Removing
Direction
Master
Pin
W17V-03-07-001
W3-7-2
UNDERCARRIAGE / Track
Boom Arm
CAUTION: Support the raised machine se-
curely and steady with wooden block.
5. Raise the machine as illustrated with the angle be-
tween the boom and the arm held at 90° to 110°
and the bucket round bottom section placed on 90° to 110°
the ground. At this time, put a support under the
track frame to support the machine.
M104-07-067
Support
W105-03-07-011
W3-7-3
UNDERCARRIAGE / Track
Installation
W105-03-07-013
W105-03-07-014
3. With the machine kept raised, slowly operate the
lever for the side being installed with track in the
forward direction. Turn travel device (9) while
winding the track around the raised track frame.
9
W105-03-07-015
3
W105-03-07-016
Wooden Block
W3-7-4
UNDERCARRIAGE / Track
IMPORTANT: Apply a coat of grease onto the outer ST 1971
diameter of master pin (5) and inner
diameter of bushing.
Master pin (5) has its directivity. Be 5
sure to remove it by tapping special
tool in from the opposite side of the
pin.
5. Install special tool (ST 1971) of master pin to tap
master pin (5) in.
Pin
W105-03-07-017
Installing
Direction
Master Pin
W166-03-07-02
W116-03-07-001
M116-07-094
W3-7-5
UNDERCARRIAGE / Track
W157-03-06-002
W3-7-6
UNDERCARRIAGE / Track
Assemble Link
In case link is disassembled, assemble it by follow- • Insert the pin further until it is contact with the sur-
ing procedures. face of workbench.
• Apply fully grease to the out surface of the half
IMPORTANT: Do not apply grease to the dust seal part of pin where is left to outside of bushing.
when assembling. • Place the bushing horizontally.
IMPORTANT: Install the dust seal with its flat side • Pull the pin in while rotating it until the pin comes
facing inside. to the center of the bushing.
1. Install the dust seal to the links (both right and
left).
Link
Dust Seal
W17P-03-07-001
Install links at both right and left sides of the pin.
Pin
Insert Pin in While
Rotating It
Be Sure Grease
Bushing Flows Out Here
Grease
Press Bushing
Down to the
Work Bench Bench
W17P-03-07-002
W3-7-7
UNDERCARRIAGE / Track
MAINTENANCE STANDARD
Link
A
W155-03-07-001
Unit: mm (in)
Standard Allowable Limit Remedy
A 1041.4 (41.0) 1062.2 (41.8) Clad by welding and
B 152 (6.0) 144.1 (5.7) finish or replace
Master Pin
W142-03-07-003
Unit: mm (in)
Standard Remedy
A 301 (11.9)
Replace
B 56.8 (2.2)
W3-7-8
UNDERCARRIAGE / Track
Master Bushing
W105-03-07-023
Unit: mm (in)
Standard Remedy
A 204.15 (8.0)
B 57.65 (2.3) Replace
C 85.35 (3.4)
Grouser Shoe
W105-03-07-024
Unit: mm (in)
Shoe Size 650 mm (25.6 in) Grouser Shoe
Standard Allowable Limit Remedy
A 302 (11.9) −
B 20 (0.8) − Replace
C 50 (2.0) 24 (0.9)
W3-7-9
UNDERCARRIAGE / Track
Bushing
W105-03-07-023
Unit: mm (in)
Standard Allowable Limit Remedy
A 218.95 (8.6) -
B 58.15 (2.3) - Replace
C 85.35 (3.4) 78.55 (3.1)
Pin
A W142-03-07-004
Unit: mm (in)
Standard Remedy
A 319.5 (12.6)
Replace
B 57.0 (2.2)
W3-7-10