Professional Documents
Culture Documents
InstallationRequirements AL250
InstallationRequirements AL250
I
NSTALLATI
ON
REQUI
REM ENTS
Table of Contents
1 Dimension Requirements 4
1-1 Access Doors Dimension Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1-2 Room Dimensions Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1-3 Trainer Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2 Power Requirements 8
2-1 European Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2-2 North American Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3 Miscellaneous Requirements 10
3-1 Environmental Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3-2 EASA Certification Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3-3 Documents to supply to Alsim . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1 Dimension Requirements
1-1 Access Doors Dimension Requirements
Minimum site access door dimensions for the installation*:
*Any access door dimensions inferior to the above will be subject to a specific site survey by Alsim’s
engineers.
CAUTION
! All doors that lead to the installation room must comply with the
CAUTION
dimension requirements above.
4/13 Information, drawings and pictures shown in this document are indicative. print date: June 21, 2018
Configuration and technical features are subject to change without notice. v 1.2
AL250 Installation Requirements Chapter 1. Dimension Requirements
1-2. Room Dimensions Requirements
*Rooms with dimensions inferior to the above will be subject to a specific site survey by Alsim’s
engineers.
print date: June 21, 2018 Information, drawings and pictures shown in this document are indicative. 5/13
v 1.2 Configuration and technical features are subject to change without notice.
Chapter 1. Dimension Requirements AL250 Installation Requirements
1-3. Trainer Dimensions
6/13 Information, drawings and pictures shown in this document are indicative. print date: June 21, 2018
Configuration and technical features are subject to change without notice. v 1.2
AL250 Installation Requirements Chapter 1. Dimension Requirements
1-3. Trainer Dimensions
print date: June 21, 2018 Information, drawings and pictures shown in this document are indicative. 7/13
v 1.2 Configuration and technical features are subject to change without notice.
Chapter 2. Power Requirements AL250 Installation Requirements
2 Power Requirements
2-1 European Standards
Trainer Projectors
Electrical power 230V, 50Hz 230V, 50Hz
Plug in circuit breaker 16A, C curve 16A, C curve
Power consumption 2.1 kW (3 kVA UPS) 2.1 kW (3 kVA UPS)
Protection 300 mA GFCI or equivalent 30 mA GFCI or equivalent
8/13 Information, drawings and pictures shown in this document are indicative. print date: June 21, 2018
Configuration and technical features are subject to change without notice. v 1.2
AL250 Installation Requirements Chapter 2. Power Requirements
2-2. North American Standards
Trainer Projectors
Electrical power 115V, 60Hz 115V, 60Hz
Plug in circuit breaker 15A, C curve 15A, C curve
Power consumption 2.1 kW (3 kVA UPS) 2.1 kW (3 kVA UPS)
CAUTION
! Electrical safety: upstream from the two UPS, electrical protection
CAUTION
(supplied independently by customer) must be evaluated and verified
by the master electrician, according to North American standards.
print date: June 21, 2018 Information, drawings and pictures shown in this document are indicative. 9/13
v 1.2 Configuration and technical features are subject to change without notice.
Chapter 3. Miscellaneous Requirements AL250 Installation Requirements
3 Miscellaneous Requirements
3-1 Environmental Requirements
Temperature from 10˚C to 25˚C, 50˚F to 80˚F (stable temperature recommended)
Humidity inferior to 80%
Air conditioning is recommended (7 kW is recommended for use in temperate climate conditions).
Appropriately prepared flat floor surface.
The simulator room must be equipped with a wired internet connection for maintenance.
NOTE
If internet access restrictions exist, please contact us for further details.
NOTE
CAUTION
! Even though the cockpit is mounted on wheels to facilitate installation,
CAUTION
the flight trainer must not to be moved once installed and qualified!
Moving an already qualified flight trainer would necessitate a new qual-
ification.
10/13 Information, drawings and pictures shown in this document are indicative. print date: June 21, 2018
Configuration and technical features are subject to change without notice. v 1.2
AL250 Installation Requirements Chapter 4. Summary to Send to Alsim
print date: June 21, 2018 Information, drawings and pictures shown in this document are indicative. 11/13
v 1.2 Configuration and technical features are subject to change without notice.
Chapter 4. Summary to Send to Alsim AL250 Installation Requirements
4-1. European Standards
12/13 Information, drawings and pictures shown in this document are indicative. print date: June 21, 2018
Configuration and technical features are subject to change without notice. v 1.2
AL250 Installation Requirements Chapter 4. Summary to Send to Alsim
4-2. North American Standards
print date: June 21, 2018 Information, drawings and pictures shown in this document are indicative. 13/13
v 1.2 Configuration and technical features are subject to change without notice.