Technical Specification For Dual Fuel Fire Tube Boiler
Technical Specification For Dual Fuel Fire Tube Boiler
Sr No Description Specification
01. Suppler will arrange test, trail , installation and operational training
02. Manufacturer should be submitting design and drawing and boiler authorize approval.
03. Supplier should provide all tested document which is relevant with Quality Control
during boiler delivery period.
a. Butt weld 100% Test by Radiography Testing by ISO Certify third party Company and test
report should be submit with boiler document
b. Fillet Weld 100% Test by Phased Array Ultrasonic Testing by third party Company.
c. Heat Treatment Report with Testing Graphs.
d. Hydraulic Test Report
Boiler structure can be made local or foreign but spare and accessories should be use world
renowned manufacturer only.
01 Year warranty