TABLE-1: Number of occupant load for building-UAE code on page:181

LAND KEY :
LEGEND FOR FIRE FIGHTING

2 HOUR FIRE RESISTANCE WALL


BUILDING BUILDING AREA TYPE OF TYPE OF OCCUPANT OCCUPANT TYPE OF FIRE PROTECTION
FIRE ALARM
1 HOUR FIRE RESISTANCE WALL NUMBER NAME (m²) USE OCCUPANCY LOAD FACTOR LOAD CONSTRUCTION SYSTEM
(m²/person)
TD:TRAVEL DISTANCE TO EXIT
FIRE ALARM AND
1 G.F -2375.06 SHOP 255 *ASS, *FHC, *FE SMOKE
EXIT EXIT LIGHT SHOP INDUSTRIAL 9.3m² TYPE II(222) GENERAL NOTES :
DETECTION SYSTEM
60 Minutes FIRE RESISTANCE DOOR
FD1
WITH SELF CLOSING AND LATCH

90 Minutes FIRE RESISTANCE DOOR


FD2
WITH SELF CLOSING AND LATCH

LANDING VALVE TOTAL 255

MULTIPURPOSE (ABC)
DRY POWDER TYPE 4.5KG EXTINGUISHER

Note:- FIRE HOSE REEL CABINET


1. All portions of this building shall be fully covered by CONSISTING:
smoke detection system and fully covered by announcement system and FHC
1 No: Ø40X30 Mtr. LONG HOSE & NOZZLE ON RACK
REV. NO. DESCRIPTION Date
these systems shall be connected with the existing system according to
UAE fire and life safety code and NFPA 72. 1 No: Ø40 PRESSURE REDUCING ANGLE VALVE
21 21' 22 23 24 25 26 27 28 29
2. Exit sign and emergency lighting shall be providing in this
EMERGENCY DOOR MASTER DEVELOPER :
building according to UAE fire and life safety code and NFPA
00 47 600 377 400 600 600 400 400 600
3. All standpipe system in this building shall be used as
dry riser system according to NFPA
*ASS AUTOMATIC SPRINKLER SYSTEM
100
4. All portions of these building shall be fully protected by
automatic sprinklers system according to (NFPA 13) and UAE fire and 120 330 120 FHC 850 1030

12010120
life safety code
*FHC FIRE HOSE REEL

250
5. Shop drawings shall be provided for civil defense approval
1 2 3 4 5 6 7 8 1
FD2 1422
6.Fire contractor is responsible for the installation of fire fighting &
fire alarm system as per UAE fire code % NFPA
7.All interior finishes materials shall be provided according to CORRIDOR PATH
UAE fire and life safety code and NFPA requirement 2012 1980

8.

9.
OWNER
* ALL PORTION OF THIS BUILDING SHALL BE FULLY COVERED BY
SMOKE DETECTION SYSTEM AND FULLY COVERED BY
ANNOUNCEMENT SYSTEM ACCORDING TO UAE FIRE AND LIFE
SAFETY CODE AND NFPA 72

* ALL PORTION OF THIS BUILDING SHALL BE FULLY PROTECTED BY


AUTOMATIC SPRINKLERS SYSTEM ACCORDING TO UAE FIRE AND LIFE
SAFETY CODE AND NFPA 13

* EXIT SIGN AND EMERGENCY LIGHTING SHALL BE PROVIDING IN THIS


BUILDING ACCORDING TO UAE FIRE AND LIFE SAFETY CODE AND NFPA

* ALL STANDPIPE SYSTEM IN THIS BUILDING SHALL BE USED AS CONSULTANT :


WET RISER SYSTEM ACCORDING TO NFPA 14

T.D 28.60M
GENERAL NOTE:
1- ALL ITEMS IN THESE DOCUMENTS ARE GUIDANCE ONLY ,

2980
DETAILED OF FIRE ALARM, FIREFIGHTING AND ALL VENTILATION
SYSTEM IN ALL AREAS SHALL BE SUBMITTED IN SHOP DRAWING
SUBMITTAL.

2- FIRE PUMP CAPACITY SHALL BE CALCULATED ACCORDING TO


THE BUILDING TYPE & CIVIL DEFENSE REQUIREMENT AND SHALL
BE SUBMITTED IN SHOP DRAWING SUBMITTAL
AS PER (UAE FIRE AND LIFE SAFETY CODE)

3- FIRE RESERVE WATER TANK SHALL BE CALCULATED ACCORDING


TO THE BUILDING TYPE & CIVIL DEFENSE REQUIREMENT AND
SHALL BE SUBMITTED IN SHOP DRAWING SUBMITTAL.
2012 1980 PROJECT NAME :
AS PER (UAE FIRE AND LIFE SAFETY CODE)

4- THERE ARE NO INSTALLATIONS FOR LPG CENTRAL SYSTEMS IN


THESE BUILDINGS.

5- ALL GAS PIPING(LPG CENTRAL SYSTEM) SHALL BE EXPOSED ON


THE OUT SIDE ELEVATIONS (FILLING LINE AND RISERS)IF THE
SYSTEM IS PROVIDED.
ZONE : PLOT NO :
6- DETERMINE THE TOTAL AREA OF OPENING BETWEEN ADJACENT
FAÇADE OF TWO DIFFERENT BUILDINGS AS PERCENTAGE AS PER MUSAFFAH 114 ,115 &116
(UAE FIRE AND LIFE SAFETY CODE AND INTERNATIONAL CODES).
7- ALL STAIRWAYS SHALL BE PROVIDED WITH MARKING SIGN. 1980
8- ALL SMOKE MANAGEMENT SYSTEM & ELEVATORS SHALL BE
INTERLOCKING WITH THE ALARM SYSTEM. EXISTING SECTOR NO :
9- ALL HORIZONTAL & VERTICAL OPENING (ON EXTERNAL FAÇADE, 480 480
ON INTERNAL, SHAFTS OR VOIDS ) SHALL BE FIRE RATED
1500
M43
ACCORDING TO THE RATING DEGREE OF THE COMPARTMENT 1532 3030303030303030 30303030303030

120 10 120

120 10 120
(WITHIN THE BUILDING OR ON ELEVATION ) .
1 2 3 4 5 6 7 8 9 9 8 7 6 5 4 3 2 1

250

250

270
10- ALL PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED AS
PER (UAE FIRE AND LIFE SAFETY CODE & NFPA10). PROJECT DESCRIPTION :
5960

5960
11- EMERGENCY LIGHT AND EXIT SIGNS SHALL BE PROVIDED
ACCORDING TO (UAE FIRE AND LIFE SAFETY CODE & NFPA101)
12- ALL STRUCTURE ELEMENTS SHALL HAVE THE RESISTANCE
RATING ACCORDING TO (NFPA 5000 & OTHER INTERNATIONAL
STANDARDS).

13- ALL STAIRWAYS SHALL BE PROVIDED WITH TWO WAYS FIRE


TELEPHONE COMMUNICATION.

14- ALL PORTIONS OF THESE BUILDING AND COMMON AND


SERVICES AREAS WILL BE FULLY COVERED BY SMOKE DETECTIONS FIRE PROTECTED BY FIRE PROTECTED BY
AND FULLY COVERED BY VOICE ANNOUNCEMENT SYSTEM ACCORD- AUTOMATIC SPRINKLER SYSTEM AUTOMATIC SPRINKLER SYSTEM
ING TO (NFPA 72).

15- ALL PORTIONS OF THESE BUILDING WILL BE FULLY PROTECTED


BY AUTOMATIC SPRINKLERS SYSTEM ACCORDING TO (NFPA 13).
DRAWING TITLE :
16- STAND PIPE SYSTEM SHALL BE PROVIDED IN THESE BUILDING

STORE
ACCORDING TO (NFPA 14)

WORKSHOP
17- ALL FIRE DOOR AND WINDOWS SHALL BE ACCORDING TO
(NFPA 80 )
18- ALL TYPES OF SMOKE MANAGEMENT SYSTEMS (INCLUDE PRES-
SURE DIFFERENCE BETWEEN ADJACENT ZONES) SHALL BE FOLLO-

+30
WING(NFPA 90A, NFPA 92A, NFPA 92B AND OTHER INTERNATIONAL
CODES AND STANDARDS) AND SHALL BE SUBMITTED IN SHOP
DRAWING SUBMITTAL.
19- ALL INTERIOR FINISHING MATERIAL SHALL BE PROVIDED AS
+30
(UAE FIRE AND LIFE SAFETY CODE & NFPA 101 )
20- FIRE COMMAND CENTER ROOM SHALL BE PROVIDED ACCORD-
ING TO (UAE FIRE AND LIFE SAFETY CODE & NFPA REQUIREMENT)
DRAWING NO : REVISION NO:
21- CO² MONOXIDE DETECTOR SHALL BE PROVIDED TO DETECT
0
THE CO² CONCENTRATION.
22- CENTRAL BATTERY SYSTEM FOR EMERGENCY LIGHTING SYSTE-
T.D 28.60M
MS AND OTHER SYSTEM SHALL BE PROVIDED.
23- INTERNAL ROADS INDICATING HOW FIRE-MEN EMERGENCY
TRACKS WILL MANEUVER ON THE SITE AND OCCUPANTS ASSEMBL- SUBMISSION DATE : SCALE :
IES AREAS.
24- TOTAL DURATION TIME OF FULL EVACUATION OF THE BUILDING
AT DISCHARGING LEVEL, UP TO ASSEMBLIES AREAS(ASSEMBLIES 20-APR-2021
SHALL BE SIZED ACCORDING TOTAL NUMBER OF OCCUPANTS).

25- ALL CURTAIN WALLS AND CLADDING INSULATION, EXTERIOR


WALL CLADDING AND ROOFING SYSTEM SHALL BE AS UAE FIRE
PROJECT ID : PLAN ID :
AND LIFE SAFETY CODE ANNEXURE A 121 AND INTERNATIONAL
CODES AND STANDARD, AFTER TENDER IS APPROVED BRING SHOP B1A-2020-006446-P02-A02
DRAWING AND SUPPORT INFORMATION FOR CIVIL DEFENSE
APPROVAL.
26- FIRE PUMP AND FIRE WATER TANK SHALL BE LISTED AND OFFICE USE ONLY :
TESTED ACCORDING TO CIVIL DEFENSE REQUIREMENT AND
INTERNATIONAL STANDARDS .

27- ALL OPEN SPACE FLOORS SHALL BE USED AS A SINGLE TENANT


310
FLOOR ONLY .IF IT USED AS A MULTIPLE TENANCY, THEN FIRE
220

RATED CORRIDOR NOT LESS THAN ONE HOUR SHALL BE CONNEC-


TED TO THE BOTH STAIR CASES .
400

28- FIRE OR SMOKE DAMPER SHALL BE PROVIDED IN THESE BUIL-


DING ON ALL DUCT SHAFT ACCORDING TO (UAE FIRE AND LIFE OFFICE
FEMALE
MEN
SAFETY CODE AND NFPA 90A, NFPA 90B) ANDSHALL BE SUBMITTED 300 1350
IN SHOP DRAWING SUBMITTAL.

29- ALL PENETRATIONS THROUGH FIRE RESISTANCE RATED WALLS


120 10 120

120 10 120
12010120

SHALL BE PROTECTED BY APPROVED FIRE STOP SYSTEM AND


ELE
270

270

120
250

250

MATERAILS, INSTALLED AND TESTED IN ACCORDANCE WITH ASTM 1532


200

E 814 OR UL 1479. 1 2 3 4 5 6 7 8 9 9 8 7 6 5 4 3 2 1
8 1 1280
30- ALL MEANS OF EGRRESS COMPONENTS DETAILS AND DIMENSI- FHC 3030303030303030 3030303030303030 FHC 200
NS SHALL BE PROVIDED AND CONSTRUCTED ACCORDING TO
(UAE FIRE AND LIFE SAFETY CODE AND NFPA 101 AND 5000). 910 200 910

31-CONSULTANT AND CONTRACTORS SHALL COMPLY WITH UAE


FIRE AND LIFE SAFETY CODE CHAPTER 12 IN TERMS OF REQUIRE-
MENTS OF BUILDING UNDER CONSTRUCTION.
32- EMERGENCY ACTION PLAN SHALL BE IMPLEMENTING IN THESE
BUILDINGS ACCORDING TO UAE ANNEXURE B2 IN THE UAE FIRE
AND LIFE SAFETY CODE.

33- CONSULTANT AND CONTRACTORS SHALL COMPLY WITH UAE


FIRE AND LIFE SAFETY CODE ANNEXURE B.1 IN TERMS OF THE
REQUIREMENTS OF BALCONY ,TERRACE AND WINDOWS.
34- PRIVATE FIRE HYDRANT SHALL PROVIDED AROUND
THESE BUILDING AS PER (UAE FIRE AND LIFE SAFETY CODE)
35- CONSULTANT AND CONTRACTORS MUST COMPLY WITH THE
GENERAL NOTES AND APPLICABLE CODES AND STANDARDS EVEN
IF THE CODE REQUIREMENT WAS MISSED DURING PLAN REVIEW.
TABLE-1: Number of occupant load for building-UAE code on page:181 LAND KEY :
LEGEND FOR FIRE FIGHTING

2 HOUR FIRE RESISTANCE WALL


BUILDING BUILDING AREA TYPE OF TYPE OF OCCUPANT OCCUPANT TYPE OF FIRE PROTECTION
FIRE ALARM
1 HOUR FIRE RESISTANCE WALL NUMBER NAME (m²) USE OCCUPANCY LOAD FACTOR LOAD CONSTRUCTION SYSTEM
(m²/person)
TD:TRAVEL DISTANCE TO EXIT

MEZZANINE F.F - 599.57 FIRE ALARM AND


EXIT EXIT LIGHT 1 STORE INDUSTRIAL 27.9m² 21 TYPE II(222) *ASS, *FHC, *FE GENERAL NOTES :
SMOKE
60 Minutes FIRE RESISTANCE DOOR DETECTION SYSTEM
FD1
WITH SELF CLOSING AND LATCH

90 Minutes FIRE RESISTANCE DOOR


MEZZANINE F.F - 590.04 STORE INDUSTRIAL 27.9m² 21
FD2
WITH SELF CLOSING AND LATCH

LANDING VALVE TOTAL 42

MULTIPURPOSE (ABC)
DRY POWDER TYPE 4.5KG EXTINGUISHER

Note:- FIRE HOSE REEL CABINET


1. All portions of this building shall be fully covered by CONSISTING:
smoke detection system and fully covered by announcement system and
these systems shall be connected with the existing system according to
FHC
1 No: Ø40X30 Mtr. LONG HOSE & NOZZLE ON RACK REV. NO. DESCRIPTION Date
UAE fire and life safety code and NFPA 72. 1 No: Ø40 PRESSURE REDUCING ANGLE VALVE

2. Exit sign and emergency lighting shall be providing in this MASTER DEVELOPER :
building according to UAE fire and life safety code and NFPA

3. All standpipe system in this building shall be used as *ASS AUTOMATIC SPRINKLER SYSTEM
dry riser system according to NFPA 1 21' 22 23 24 25 26 27 28 29
4. All portions of these building shall be fully protected by
automatic sprinklers system according to (NFPA 13) and UAE fire and
life safety code
FIRE HOSE REEL 47 600 377 400 600 600 400 400 600
*FHC
5. Shop drawings shall be provided for civil defense approval

6.Fire contractor is responsible for the installation of fire fighting &


fire alarm system as per UAE fire code % NFPA 150

12010 120
CORRIDOR PATH

FD2
7.All interior finishes materials shall be provided according to 24 23 22 21 20 19 18 17 16 15 14 13

250
UAE fire and life safety code and NFPA requirement

1422 1980
1 2 3 4 5 6 7 8 9 10 11 12

8.
140 330 120

9.
OWNER
* ALL PORTION OF THIS BUILDING SHALL BE FULLY COVERED BY
SMOKE DETECTION SYSTEM AND FULLY COVERED BY
ANNOUNCEMENT SYSTEM ACCORDING TO UAE FIRE AND LIFE
SAFETY CODE AND NFPA 72

* ALL PORTION OF THIS BUILDING SHALL BE FULLY PROTECTED BY


AUTOMATIC SPRINKLERS SYSTEM ACCORDING TO UAE FIRE AND LIFE

STORE
SAFETY CODE AND NFPA 13

* EXIT SIGN AND EMERGENCY LIGHTING SHALL BE PROVIDING IN THIS


BUILDING ACCORDING TO UAE FIRE AND LIFE SAFETY CODE AND NFPA

* ALL STANDPIPE SYSTEM IN THIS BUILDING SHALL BE USED AS


+30 CONSULTANT :
WET RISER SYSTEM ACCORDING TO NFPA 14

GENERAL NOTE:
EXISTING
1- ALL ITEMS IN THESE DOCUMENTS ARE GUIDANCE ONLY ,
DETAILED OF FIRE ALARM, FIREFIGHTING AND ALL VENTILATION
SYSTEM IN ALL AREAS SHALL BE SUBMITTED IN SHOP DRAWING

2980
SUBMITTAL.

2980
2- FIRE PUMP CAPACITY SHALL BE CALCULATED ACCORDING TO
THE BUILDING TYPE & CIVIL DEFENSE REQUIREMENT AND SHALL
BE SUBMITTED IN SHOP DRAWING SUBMITTAL
2710

AS PER (UAE FIRE AND LIFE SAFETY CODE)

3- FIRE RESERVE WATER TANK SHALL BE CALCULATED ACCORDING


TO THE BUILDING TYPE & CIVIL DEFENSE REQUIREMENT AND
SHALL BE SUBMITTED IN SHOP DRAWING SUBMITTAL. PROJECT NAME :
AS PER (UAE FIRE AND LIFE SAFETY CODE)

4- THERE ARE NO INSTALLATIONS FOR LPG CENTRAL SYSTEMS IN


THESE BUILDINGS.
1980
5- ALL GAS PIPING(LPG CENTRAL SYSTEM) SHALL BE EXPOSED ON
THE OUT SIDE ELEVATIONS (FILLING LINE AND RISERS)IF THE
ZONE : PLOT NO :
WORKSHOP
SYSTEM IS PROVIDED.

6- DETERMINE THE TOTAL AREA OF OPENING BETWEEN ADJACENT 2012


FAÇADE OF TWO DIFFERENT BUILDINGS AS PERCENTAGE AS PER
+30 MUSAFFAH 114 ,115 &116
(UAE FIRE AND LIFE SAFETY CODE AND INTERNATIONAL CODES).
7- ALL STAIRWAYS SHALL BE PROVIDED WITH MARKING SIGN.

8- ALL SMOKE MANAGEMENT SYSTEM & ELEVATORS SHALL BE


INTERLOCKING WITH THE ALARM SYSTEM.
SECTOR NO :
9- ALL HORIZONTAL & VERTICAL OPENING (ON EXTERNAL FAÇADE,
ON INTERNAL, SHAFTS OR VOIDS ) SHALL BE FIRE RATED
ACCORDING TO THE RATING DEGREE OF THE COMPARTMENT
M43
(WITHIN THE BUILDING OR ON ELEVATION ) .

10- ALL PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED AS


PROJECT DESCRIPTION :
5960

PER (UAE FIRE AND LIFE SAFETY CODE & NFPA10).

11- EMERGENCY LIGHT AND EXIT SIGNS SHALL BE PROVIDED


ACCORDING TO (UAE FIRE AND LIFE SAFETY CODE & NFPA101)
1532 360 120 120 360
1500

120 10120

120 10120
1 2 3 4 5 6 7 8 9 10 11 12 13 13 12 11 10 9 8 7 6 5 4 3 2 1
12- ALL STRUCTURE ELEMENTS SHALL HAVE THE RESISTANCE

250
250
RATING ACCORDING TO (NFPA 5000 & OTHER INTERNATIONAL
120

120
26 25 24 23 22 21 20 19 18 17 16 15 14 14 15 16 17 18 19 20 2122 23 24 25 26

STANDARDS). 120 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
120
13- ALL STAIRWAYS SHALL BE PROVIDED WITH TWO WAYS FIRE
TELEPHONE COMMUNICATION.

14- ALL PORTIONS OF THESE BUILDING AND COMMON AND


SERVICES AREAS WILL BE FULLY COVERED BY SMOKE DETECTIONS

T.
AND FULLY COVERED BY VOICE ANNOUNCEMENT SYSTEM ACCORD-
ING TO (NFPA 72).

15- ALL PORTIONS OF THESE BUILDING WILL BE FULLY PROTECTED


BY AUTOMATIC SPRINKLERS SYSTEM ACCORDING TO (NFPA 13).

1m D DRAWING TITLE :
16- STAND PIPE SYSTEM SHALL BE PROVIDED IN THESE BUILDING
ACCORDING TO (NFPA 14)
. 9 18
17- ALL FIRE DOOR AND WINDOWS SHALL BE ACCORDING TO
(NFPA 80 )

1 8 .9
18- ALL TYPES OF SMOKE MANAGEMENT SYSTEMS (INCLUDE PRES-
SURE DIFFERENCE BETWEEN ADJACENT ZONES) SHALL BE FOLLO-

D 1m
.
WING(NFPA 90A, NFPA 92A, NFPA 92B AND OTHER INTERNATIONAL

T
CODES AND STANDARDS) AND SHALL BE SUBMITTED IN SHOP
DRAWING SUBMITTAL.
19- ALL INTERIOR FINISHING MATERIAL SHALL BE PROVIDED AS FIRE PROTECTED BY FIRE PROTECTED BY
(UAE FIRE AND LIFE SAFETY CODE & NFPA 101 ) AUTOMATIC SPRINKLER SYSTEM AUTOMATIC SPRINKLER SYSTEM
20- FIRE COMMAND CENTER ROOM SHALL BE PROVIDED ACCORD-
ING TO (UAE FIRE AND LIFE SAFETY CODE & NFPA REQUIREMENT)
DRAWING NO : REVISION NO:
0
STORE
21- CO² MONOXIDE DETECTOR SHALL BE PROVIDED TO DETECT

STORE
THE CO² CONCENTRATION.
22- CENTRAL BATTERY SYSTEM FOR EMERGENCY LIGHTING SYSTE-
MS AND OTHER SYSTEM SHALL BE PROVIDED.
+450 +450
23- INTERNAL ROADS INDICATING HOW FIRE-MEN EMERGENCY
TRACKS WILL MANEUVER ON THE SITE AND OCCUPANTS ASSEMBL- SUBMISSION DATE : SCALE :
IES AREAS.
Area 599.57 sq.m Area 590.04 sq.m
2980

2980
24- TOTAL DURATION TIME OF FULL EVACUATION OF THE BUILDING
AT DISCHARGING LEVEL, UP TO ASSEMBLIES AREAS(ASSEMBLIES 20-APR-2021
SHALL BE SIZED ACCORDING TOTAL NUMBER OF OCCUPANTS).

25- ALL CURTAIN WALLS AND CLADDING INSULATION, EXTERIOR


WALL CLADDING AND ROOFING SYSTEM SHALL BE AS UAE FIRE
MEZZANINE=48.93% MEZZANINE=48.92% PROJECT ID : PLAN ID :
AND LIFE SAFETY CODE ANNEXURE A 121 AND INTERNATIONAL
CODES AND STANDARD, AFTER TENDER IS APPROVED BRING SHOP B1A-2020-006446-P02-A02
DRAWING AND SUPPORT INFORMATION FOR CIVIL DEFENSE
APPROVAL.
26- FIRE PUMP AND FIRE WATER TANK SHALL BE LISTED AND
1980
OFFICE USE ONLY :
2012
m
T.

TESTED ACCORDING TO CIVIL DEFENSE REQUIREMENT AND


INTERNATIONAL STANDARDS .
D

27- ALL OPEN SPACE FLOORS SHALL BE USED AS A SINGLE TENANT


FLOOR ONLY .IF IT USED AS A MULTIPLE TENANCY, THEN FIRE
.2
19

RATED CORRIDOR NOT LESS THAN ONE HOUR SHALL BE CONNEC-


TED TO THE BOTH STAIR CASES .
19

28- FIRE OR SMOKE DAMPER SHALL BE PROVIDED IN THESE BUIL-


.2

DING ON ALL DUCT SHAFT ACCORDING TO (UAE FIRE AND LIFE


SAFETY CODE AND NFPA 90A, NFPA 90B) ANDSHALL BE SUBMITTED
5

IN SHOP DRAWING SUBMITTAL.


T.
m

29- ALL PENETRATIONS THROUGH FIRE RESISTANCE RATED WALLS


SHALL BE PROTECTED BY APPROVED FIRE STOP SYSTEM AND
MATERAILS, INSTALLED AND TESTED IN ACCORDANCE WITH ASTM
E 814 OR UL 1479.
620 620
30- ALL MEANS OF EGRRESS COMPONENTS DETAILS AND DIMENSI-
0 FD2 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 FD2 1360
12010 120

12010 120

NS SHALL BE PROVIDED AND CONSTRUCTED ACCORDING TO


(UAE FIRE AND LIFE SAFETY CODE AND NFPA 101 AND 5000). 1392 26 25 24 23 22 21 20 19 18 17 16 15 14 14 15 16 17 18 19 20 2122 23 24 25 26
270

250
250
65

270 5
250

1 2 3 4 5 6 7 8 9 10 11 12 13 13 12 11 10 9 8 7 6 5 4 3 2 1
31-CONSULTANT AND CONTRACTORS SHALL COMPLY WITH UAE
FIRE AND LIFE SAFETY CODE CHAPTER 12 IN TERMS OF REQUIRE- 130 360 120 120 360 130
MENTS OF BUILDING UNDER CONSTRUCTION.
32- EMERGENCY ACTION PLAN SHALL BE IMPLEMENTING IN THESE
BUILDINGS ACCORDING TO UAE ANNEXURE B2 IN THE UAE FIRE
AND LIFE SAFETY CODE.

33- CONSULTANT AND CONTRACTORS SHALL COMPLY WITH UAE


FIRE AND LIFE SAFETY CODE ANNEXURE B.1 IN TERMS OF THE
REQUIREMENTS OF BALCONY ,TERRACE AND WINDOWS.
34- PRIVATE FIRE HYDRANT SHALL PROVIDED AROUND
THESE BUILDING AS PER (UAE FIRE AND LIFE SAFETY CODE)
35- CONSULTANT AND CONTRACTORS MUST COMPLY WITH THE
GENERAL NOTES AND APPLICABLE CODES AND STANDARDS EVEN
IF THE CODE REQUIREMENT WAS MISSED DURING PLAN REVIEW.