Projects Network
Projects Network
OR
•1
•24-May-23
WBS/Work
Packages to
Network
FIGURE 6.1
•2
•24-May-23
(Assumes that C
minimum of A + B >
minimum of C in
length of times to
complete A B D
activities.)
•3
•24-May-23
Activity-on-Node Fundamentals
FIGURE 6.2
•4
•24-May-23
Network Information
TABLE 6.1
FIGURE 6.3
FIGURE 6.4
•5
•24-May-23
Description
Many important optimization problems can be
analyzed by means of graphical or Project network
representation. In this section the following network
models will be discussed:
•6
•24-May-23
Activity A Must Be
Completed Before
Activity B Can Begin
Activity A Must Be
Completed Before
Activities B and C
Can Begin
•7
•24-May-23
Violation of Rule 5
•8
•24-May-23
1st Step
A
2nd Step
3
A
1
B 2
C8 3rd Step
3
A6
1 Dummy
B9 2
•9
•24-May-23
C8 4th Step
3 5
A6
D7
1 Dummy
B9 2 4
C8 F 12
3 5
A6
D7
1 Dummy
E 10
B9 2 4
5th Step
Node 1 = starting node
Node 6 = finish node
C8 F 12
3 5 6
A6
D7
1 Dummy
E 10
B9 2 4
6th Step and
Node 1 = starting node
Node 6 = finish node Completed
•10
•24-May-23
4 6
4
3 ET (3) 8 14
ET ( 6 ) max ET ( 4 ) 4 12
5 ET (5) 3 13
Thus, the earliest time that node 6 can occur is 14, and ET(6) = 14.
Dr. Faraz Akbar
•11
•24-May-23
•12
•24-May-23
LT (2) 9 0
LT (1) min
LT (3) 6 3
Total Float
For an arbitrary arc representing activity (i,
j), the total float, represented by TF(i,j), of
the activity represented by (i, j) is the
amount by which the starting time of
activity (i, j) could be delayed beyond its
earliest possible starting time without
delaying the completion of the project
(assuming no other activities are delayed).
•13
•24-May-23
Critical path
•14
•24-May-23
Free Float
Free float is the amount by which the starting time of the
activity corresponding to arc(i,j) can be delayed without
delaying the start of any later activity beyond the
earliest possible starting time.
Suppose the occurrence of node i, or the duration of
activity (i,j), is delayed by k units. Then the earlist that
node j can occur is ET(i) + tij + k. Thus, if ET(I) + tij + k
<= ET(j), or k <= ET(j) –ET(I) –tij, then node j will not be
delayed. If node j is not delayed, then no other activities
will be delayed beyond their earliest possible starting
times. Therefore,
FF(i,j)=ET(j)-ET(i)-tij
Activity B: FF(1,2)=9-0-9=0
Activity A: FF(1,3)=9-0-6=3
Activity D: FF(3,4)=16-9-7=0
Activity C: FF(3,5)=26-9-8=9
Activity E: FF(4,5)=26-16-10=0
Activity F: FF(5,6)=38-26-12=0
TABLE A6.2
•15
•24-May-23
Practice Problem
PERT
•16