The fairy truss installation activity has not yet Access/stairs for the fairy truss activity has
installed access/stairs up and down
been installed
DIlaporkan oleh :
Bpk. Rio (HSE)
The Playwwod material rets on bluenet Playwood material has been lowed
21
HARYONO DATA 7 July PT. SAM CLOSE : 7
CENTRE July
Dilaporkan Oleh :
Bpk. Indra
HARYONO DATA
CENTRE
21
The edge of the slab/floor casting area in the direction of the apartment is properly protected/tarpaulin
HARYONO DATA
CENTRE
Safety Performance Board Updated The activity of installing the fairy truss has a good lifeline