USAHA TEGAS MAINTENANCE CONSULTANT SDN BHD

Equipment Name: 1 B Pump #2 Date / Time: 7/15/2022

Location: Aligned By: Joe/Ruthran

ANGULAR MISALIGNMENT OFFSET MISALIGNMENT

mm mm/100

RPM Excellent Acceptable Excellent Acceptable


0000-1000 0.06 0.1 0.07 0.13
1000-2000 0.05 0.8 0.05 0.1
2000-3000 0.04 0.7 0.03 0.07
3000-4000 0.03 0.6 0.02 0.04
4000-5000 0.02 0.5 0.01 0.03

DIMENSION: A 150mm B 230mm C 425mm

(INITIAL ALIGNMENT CONDITION)


BEFORE
VERTICAL HORIZONTAL

ANGULARITY 0.21 -0.25

OFFSET -2.08 -0.31

F1 -1.44 F1 -1.07
FOOT POSITIONS
F2 -0.54 F2 -2.12
REMARK :

(After Vertical & Horizontal Correction)


AFTER
VERTICAL HORIZONTAL

ANGULARITY -0.05 -0.04

OFFSET 0.04 -0.09

F1 -0.12 F1 -0.22
FOOT POSITIONS
F2 -0.35 F2 -0.41