Professional Documents
Culture Documents
Method Statement - 465 - 467 - Geylang Road
Method Statement - 465 - 467 - Geylang Road
9. All debris and rubbish shall be disposed and removed from site.
10. Backfill and level the ground to gradually slope towards the roadside drain.
11. All demolition works shall be carried out in accordance with Code of Practice 55
557:2010