Done?

work Due By Done By

a Reply to insulatio mail to L&T/20.05.2015


V14- dimensinal report
Down pipe details in sewon drawing

Lurgi columns internals drawings to send for review


a mds to revise to status "u" issued for purchase

Attachment drawing to sewon, 21-C-2410/2411 and


a other
Mail to LEHQ for contact person at ENCS for PEW
Packing load in GA
a Impingement detail alignment column/internals 12.06.2015
UOP skirt change to be discussed with ENCR
Instrument aligment
22-C-6812-Guide support as per ENPP mail dtd : 22-
C-6812
corrosion acceptance sheet to send to vendors
You can use this to-do list to help
Notes you keep track of tasks that you
need to complete.
°
done 25.05.2015 Enter your own project names,
tasks, and notes to personalize the
checklist for the things you need to
get done.

Then you can either print the list


done on 09.06.2016 and check off each item as you
complete it, or you can type the
letter a in the Done? column to
make a check mark appear.

6/10/2015 If you continue to work with this


to-do list on your computer, you
can use the AutoFilter feature of
Excel to quickly identify the tasks
done for 2.1/2.2 that you have done or that you still
need to complete. In the Done?
column, click on the arrow to view
filtered lists.

To see filtered lists:


To see a list of items that are not
completed and still need to be
checked off, select (Blanks) in the
drop-down menu.

To see a list of items that are


checked off, select a in the drop-
down menu.

To see all the tasks again, select


(All) in the drop-down menu.

When you're finished using these


instructions, delete this text box by
selecting it and pressing DELETE.
o list to help
s that you

t names,
rsonalize the ±±
s you need to

rint the list


m as you
n type the
column to
ppear.

k with this
puter, you
er feature of
fy the tasks
that you still
the Done?
rrow to view

:
that are not
ed to be
lanks) in the

that are
n the drop-

gain, select
n menu.

using these
s text box by
ng DELETE.
Top of TSR ( tray#1) to bottom of down pipe flange including gasket = 909
Down pipe length ( L&T Scope ) = 1691
Gap between splash plate and down pipe = 150
Distance between gallery tray TSR (top) to splash plate = 650

Total 3400
mm
mm
mm
mm

mm