CONSTRUCTION SCHEDULE
ITEM % OF QUANTIT
DESCRIPTION UNIT UNIT COST AMOUNT 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER
NO. TOTAL Y
1 Mobilization / Demobilization 3.23% lot 1.00 5,000.00 5,000.00
2 Excavation 1.29% lot 1.00 2,000.00 2,000.00
3 Removal of Existing Structure 3.23% lot 1.00 5,000.00 5,000.00
5 Reinforcing Steel Works 18.06% lot 1.00 28,000.00 28,000.00
6 Formworks and Scaffoldings 17.81% sq.m 92.0 300.00 27,600.00
7 Reinforced Concrete Works 56.39% sq.m 92.00 950.00 87,400.00
100.00% 155,000.00