M/S AYUSH NIRMAN SEWA PVT LTD

Client M/S Kajaria Ramesh Tiles Ltd


Project: Ayush Nirman sewa Pvt Ltd
Location/Structure : Plant Under Construction
Bar Bending schedule for RMB 1 Drawing Release date 9-Jun-2023
Nos Per
S. No Bar Description bar shape Bar dia cutlength No Of Set Total Nos Total Length Unit weight Total Weight Remarks
set

1.0 Isolated Footing F1 ( TOP & Bottom bar) 150 150 12 2000 54 26 1404 2808000 0.889 2496.000 level 0.000
1700

level 0.000 to
2.0 C1 COLUMN (SIZE 400*400) 575 16 6410 54 12 648 4153680 1.580 6563.840
+ 5835
5835
320 80
2.1 C1 COLUMN stirups (SIZE400*400) 320 320 8 1440 54 45 2430 3499200 0.395 1382.400
320 80
320 80
2.2 C1 COLUMN stirups (SIZE400*400) 190 190 8 1180 54 45 2430 2867400 0.395 1132.800
320 80
190 80
2.3 C1 COLUMN stirups (SIZE400*400) 320 320 8 1180 54 45 2430 2867400 0.395 1132.800
190 80
285 80
2.4 C1 COLUMN stirups (SIZE400*400) 285 285 8 1300 54 45 2430 3159000 0.395 1248.000
285 80
Plinth tie beam THRU Grid 1,2,3,4,5,6,7
3.0 (SIZE300*450) top & bottom bar Section 565 565 16 13655 6 14 84 1147020 1.580 1812.575 level+ 0.500
A,B,C,D,E,F, 12525
Plinth tie beam Grid 1,2,3,4,5,6,7
3.1 (SIZE300*450)Top EXTRA bar Section 565 16 2225 14 10 140 311500 1.580 492.247 level+ 0.500
A,B,C,D,E,F, 1660
Plinth tie beam Grid 1,2,3,4,5,6,7
3.2 (SIZE300*450) Top Mid EXTRA bar 16 3400 7 5 35 119000 1.580 188.049 level+ 0.500
Section A,B,C,D,E,F, 3400
Plinth tie beam Grid 1,2,3,4,5,6,7
3.3 (SIZE300*450) ExtravBottom bar Section 16 2500 14 4 56 140000 1.580 221.235 level+ 0.500
A,B,C,D,E,F, 2500
Plinth tie beam THRU Grid A-A,F-F
3.4 (SIZE300*450) top & bottom bar Section 16 84790 2 7 14 1187060 1.580 1875.848 level+ 0.500
1,2,3,4,5,6,7 84790
Plinth tie beam Grid A-A,F-F
3.5 (SIZE300*450) top EXTRA bar Section 16 2110 2 4 8 16880 1.580 26.675 level+ 0.500
1,2,3,4,5,6,7 2110
Plinth tie beam T Grid A-A,F-F
3.6 (SIZE300*450) Top Mid span bar Section 16 4300 2 22 44 189200 1.580 298.983 level+ 0.500
1,2,3,4,5,6,7 4300
Plinth tie beam Grid A-A,F-F
3.7 (SIZE300*450)Extra Bottom bar Section 16 3250 2 24 48 156000 1.580 246.519 level+ 0.500
1,2,3,4,5,6,8 3250
Floor tie beam THRU Grid 1,2,3,4,5,6,7
4.0 (SIZE300*450) top & bottom bar Section 565 565 16 13655 6 14 84 1147020 1.580 1812.575 level+ 2.250
A,B,C,D,E,F, 12525
Floor tie beam Grid 1,2,3,4,5,6,7
4.1 (SIZE300*450)Top EXTRA bar Section 565 16 2225 14 10 140 311500 1.580 492.247 level+ 2.250
A,B,C,D,E,F, 1660
Floor tie beam Grid 1,2,3,4,5,6,7
4.2 (SIZE300*450) Top Mid EXTRA bar 16 3400 7 5 35 119000 1.580 188.049 level+ 2.250
Section A,B,C,D,E,F, 3400
Floor tie beam Grid 1,2,3,4,5,6,7
4.3 (SIZE300*450) ExtravBottom bar Section 16 2500 14 4 56 140000 1.580 221.235 level+ 2.250
A,B,C,D,E,F, 2500
Floor tie beam THRU Grid A-A,F-F
4.4 (SIZE300*450) top & bottom bar Section 16 84790 2 7 14 1187060 1.580 1875.848 level+ 2.250
1,2,3,4,5,6,7 84790
Floor tie beam Grid A-A,F-F
4.5 (SIZE300*450) top EXTRA bar Section 16 2110 2 4 8 16880 1.580 26.675 level+ 2.250
1,2,3,4,5,6,7 2110
Floor tie beam T Grid A-A,F-F
4.6 (SIZE300*450) Top Mid span bar Section 16 4300 2 22 44 189200 1.580 298.983 level+ 2.250
1,2,3,4,5,6,7 4300
Floor tie beam Grid A-A,F-F
4.7 (SIZE300*450)Extra Bottom bar Section 16 3250 2 24 48 156000 1.580 246.519 level+ 2.250
1,2,3,4,5,6,8 3250
Floor tie beam THRU Grid 1,2,3,4,5,6,7
5.0 (SIZE300*450) top & bottom bar Section 565 565 16 13655 6 14 84 1147020 1.580 1812.575 level+ 4.500
A,B,C,D,E,F, 12525
Floor tie beam Grid 1,2,3,4,5,6,7
5.1 (SIZE300*450)Top EXTRA bar Section 565 16 2225 14 10 140 311500 1.580 492.247 level+ 4.500
A,B,C,D,E,F, 1660
Floor tie beam Grid 1,2,3,4,5,6,7
5.2 (SIZE300*450) Top Mid EXTRA bar 16 3400 7 5 35 119000 1.580 188.049 level+ 4.500
Section A,B,C,D,E,F, 3400
Floor tie beam Grid 1,2,3,4,5,6,7
5.3 (SIZE300*450) ExtravBottom bar Section 16 2500 14 4 56 140000 1.580 221.235 level+ 4.500
A,B,C,D,E,F, 2500
Floor tie beam THRU Grid A-A,F-F
5.4 (SIZE300*450) top & bottom bar Section 16 84790 2 7 14 1187060 1.580 1875.848 level+ 4.500
1,2,3,4,5,6,7 84790
Floor tie beam Grid A-A,F-F
5.5 (SIZE300*450) top EXTRA bar Section 16 2110 2 4 8 16880 1.580 26.675 level+ 4.500
1,2,3,4,5,6,7 2110
Floor tie beam T Grid A-A,F-F
5.6 (SIZE300*450) Top Mid span bar Section 16 4300 2 22 44 189200 1.580 298.983 level+ 4.500
1,2,3,4,5,6,7 4300
Floor tie beam Grid A-A,F-F
5.7 (SIZE300*450)Extra Bottom bar Section 16 3250 2 24 48 156000 1.580 246.519 level+ 4.500
1,2,3,4,5,6,8 3250

6.0 C1 COLUMN Lapping (SIZE 400*400) 16 4300 54 12 648 2786400 1.580 4403.200
4300
320 80
6.1 C1 COLUMN stirups (SIZE400*400) 320 320 8 1440 54 31 1674 2410560 0.395 952.320
320 80
320 80
6.2 C1 COLUMN stirups (SIZE400*400) 190 190 8 1180 54 31 1674 1975320 0.395 780.373
320 80
190 80
6.3 C1 COLUMN stirups (SIZE400*400) 320 320 8 1180 54 31 1674 1975320 0.395 780.373
190 80
285 80
6.4 C1 COLUMN stirups (SIZE400*400) 285 285 8 1300 54 31 1674 2176200 0.395 859.733
285 80
KG 37218.228