J213-AHC-EMD-MS-C-04-R0 ITP For Substructure Waterprooing Bitumen Coat
H-HOLD POINT A stage in the production cycle when inspection and /or test to
R&A- REVIEW & APPROVE A Document to be Reviewed by Responsible Authority and App
Witness point – A stage in the production cycle when a third p
W-WITNESS POINT an item for further processing ( Required Inspection Documen
NA Not applicable
RE WATERPROOFING (BITUMEN COAT -MIB COAT-RBE 5)
inspection and /or test to be performed to determine the acceptability of an item for further processing.
onsible Authority and Approval or Approved with Comments required to proceed for Further processing.
ction cycle when a third party inspector/Consultant, Client representative witnesses any inspection and or test to determine th
ired Inspection Document like RFI,MIR etc)
e checked/Witness the ongoing process to meet the Specs & Procedure Requirements ( no any documents required)
REMARKS
cessing.
essing.
n and or test to determine the acceptability of