Plumbing Workings for a Hospital

A B C D E F G K L M N O

56 cm180 cm 96 cm

CW CW CW CW CW CW CW
ϕ 25 mm ϕ 25 mm ϕ 25 mm ϕ 25 mm ϕ 40 mm ϕ 40 mm ϕ 25 mm
BOP: 294 cm BOP: 294 cm BOP: 294 cm BOP: 294 cm BOP: 293 cm BOP: 293 cm BOP: 294 cm

GENERAL NOTES

162 cm 130 cm68 cm


A. THE ORIENTATION OF BUILDING  IS DEFINED  BY 

72 cm
89 cm ITS  RELEVANT  NORTH DIRECTION SIGN 

BOP: 294 cm
ϕ 25 mm
BOP: 78 cm
ϕ 40 mm

126 cm
CW
ILLUSTRATED ON THE PROJECT KEY PLAN 

CW
30 cm
SHOWN IN EACH DRAWING.

BOP: 293 cm BOP: 293 cm
ϕ 40 mm

129 cm
B. DO NOT SCALE FROM DRAWINGS. 

CW
1

162 cm
1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION 
WITH SPECIFICATIONS.

ϕ 32 mm
CW
CW
ϕ 25 mm D.  BEFORE COMMENCEMENT OF WORK , THE 
19 cm
BOP: 292 cm BOP: 294 cm CONTRACTOR SHOULD SUBMIT ALL REQUIRED 
ϕ 63 mm

SHOP DRAWINGS FOR THE ENGINEER'S 
CW

26 cm
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE 
CW IN MILLIMETERS,AND LEVELS IN METERS 
ϕ 40 mm UNLESS OTHERWISE STATED .
BOP: 293 cm

BOP: 293 cm
F.  THE CONTRACTOR IS TO VERIFY AND RESOLVE , 

ϕ 50 mm
CW
UNDER THE GUIDANCE OF THE ENGINEER, ALL 
1553 cm

2 2
61 cm DISCREPANCIES OF ANY ACTIVITY BEFORE 
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND
47 cm

CW CW

BOP: 293 cm
ϕ 50 mm
ϕ 63 mm ϕ 63 mm

CW
BOP: 292 cm BOP: 303 cm

3 3

BOP: ‐108 cm
ϕ 63 mm
CW
Section 01

381 cm
CW
ϕ 63 mm
BOP: 292 cm CW
ϕ 50 mm
BOP: 292 cm

BOP: 293 cm
ϕ 63 mm
CW

4 4
1714 cm

1067 cm

CW CW CW CW
ϕ 63 mm ϕ 63 mm ϕ 25 mm ϕ 25 mm
BOP: 292 cm BOP: 292 cm BOP: 294 cm BOP: 294 cm
5 5
BOP: 55 cm
ϕ 40 mm
CW

BOP: 55 cm BOP: 54 cm
119 cm100 cm

ϕ 50 mm
CW
ϕ 40 mm
CW

6 6
BOP: 55 cm
ϕ 40 mm

306 cm
CW

295 cm
1143 cm PROJECT NAME.
Hospital
CONSULTANT.
1067 cm

7 7
1918 cm

GENERAL  CONTRACTOR.
BOP: 293 cm
ϕ 40 mm
CW
94 cm

61 cm ELECTROMECH  CONTRACTOR.

Section 01
CW CW CW
ϕ 40 mm
BOP: 293 cm
ϕ 50 mm
BOP: 293 cm
ϕ 40 mm
BOP: 293 cm
1:25
8 DISCIPLINE Ground Floor ‐ Cold Water 8

DESIGNED BY Ahmed Akram

CHECKED BY

SCALE SHEET NO REV CODE


Ground Floor - Cold Water B C
1:110
A B C D E F G K L M N O
A B C D E F G K L M N O
4620
cmcm 2822 cm 24 cm 270 cm 259 cm 10 cm 458 cm 12 cm 363 cm

HW RHW HW HW HW RHW
RHW HW
ϕ 40 mm ϕ 25 mm ϕ 25 mm ϕ 25 mm ϕ 25 mm ϕ 25 mm
ϕ 25 mm ϕ 25 mm
BOP: 283 cm BOP: 284 cm BOP: 284 cm BOP: 284 cm BOP: 284 cm BOP: 284 cm
BOP: 284 cm BOP: 284 cm

GENERAL NOTES

26 cm
A. THE ORIENTATION OF BUILDING  IS DEFINED  BY 
ITS  RELEVANT  NORTH DIRECTION SIGN 
ILLUSTRATED ON THE PROJECT KEY PLAN 

BOP: 284 cm
ϕ 25 mm

30 cm
SHOWN IN EACH DRAWING.
HW B. DO NOT SCALE FROM DRAWINGS. 
1 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION 
HW WITH SPECIFICATIONS.
ϕ 25 mm D.  BEFORE COMMENCEMENT OF WORK , THE 
BOP: 284 cm
20 cm CONTRACTOR SHOULD SUBMIT ALL REQUIRED 
SHOP DRAWINGS FOR THE ENGINEER'S 
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE 
41 cm IN MILLIMETERS,AND LEVELS IN METERS 
UNLESS OTHERWISE STATED .
1829 cm

F.  THE CONTRACTOR IS TO VERIFY AND RESOLVE , 
BOP: 283 cm
ϕ 40 mm

UNDER THE GUIDANCE OF THE ENGINEER, ALL 
HW

2 2
DISCREPANCIES OF ANY ACTIVITY BEFORE 
COMMENCEMENT OF THEIR RELEVANT WORKS.
BOP: 284 cm
ϕ 25 mm
RHW

SYMBOL LEGEND

RHW
ϕ 32 mm
BOP: 283 cm

3 3
BOP: ‐118 cm
ϕ 63 mm
HW
29 cm

RHW
ϕ 25 mm
BOP: 284 cm

4 4
BOP: 284 cm
ϕ 25 mm
RHW

BOP: 283 cm
ϕ 50 mm
HW

5 5

HW
2999 cm

ϕ 32 mm
BOP: 283 cm
RHW HW
ϕ 25 mm ϕ 50 mm
BOP: 284 cm BOP: 283 cm

RHW
ϕ 25 mm
BOP: 284 cm

6 6

RHW
ϕ 15 mm
BOP: 284 cm PROJECT NAME.
Hospital
CONSULTANT.
BOP: 283 cm
ϕ 40 mm
HW

7 7
GENERAL  CONTRACTOR.
BOP: 284 cm
ϕ 20 mm
RHW
9 cm

ELECTROMECH  CONTRACTOR.

Ground Floor - Hot Water


779 cm

8 DISCIPLINE Ground Floor - Hot Water 8


1:110 DESIGNED BY Ahmed Akram

CHECKED BY

SCALE SHEET NO REV CODE


HW RHW
ϕ 25 mm ϕ 15 mm A B C
BOP: 284 cm BOP: 284 cm

A B C D E F G K L M O
A B C D E F G K L M N O

IC

SP WP WP WP
ϕ 110 mm ϕ 90 mm ϕ 60 mm ϕ 48 mm
BOP: ‐30 cm BOP: ‐17 cm BOP: ‐8 cm BOP: ‐5 cm WP
0.50% 2.74% 1.01% 1.00% WP WP WP WP ϕ 48 mm
ϕ 60 mm ϕ 48 mm ϕ 48 mm ϕ 42 mm BOP: ‐13 cm
BOP: ‐12 cm BOP: ‐13 cm BOP: ‐10 cm BOP: ‐7 cm 1.14% GENERAL NOTES
0.50% Gully Trap 1.00% 1.00% 1.43%
IC
Gully Trap A. THE ORIENTATION OF BUILDING  IS DEFINED  BY 
ITS  RELEVANT  NORTH DIRECTION SIGN 

190 cm 54 cm
ILLUSTRATED ON THE PROJECT KEY PLAN 

148 cm
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS.  1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION 
WITH SPECIFICATIONS.

393 cm
VP
ϕ 60 mm D.  BEFORE COMMENCEMENT OF WORK , THE 
BOP: ‐28 cm
0.00%
CONTRACTOR SHOULD SUBMIT ALL REQUIRED 
SHOP DRAWINGS FOR THE ENGINEER'S 
WP
ϕ 60 mm APPROVAL.

139 cm
BOP: ‐7 cm E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE 
1.03%
IN MILLIMETERS,AND LEVELS IN METERS 
WP UNLESS OTHERWISE STATED .
ϕ 48 mm F.  THE CONTRACTOR IS TO VERIFY AND RESOLVE , 
BOP: ‐4 cm
2 1.00% UNDER THE GUIDANCE OF THE ENGINEER, ALL  2
DISCREPANCIES OF ANY ACTIVITY BEFORE 
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3
3067 cm

4 4

SP SP SP
ϕ 110 mm ϕ 110 mm ϕ 110 mm
BOP: ‐22 cm BOP: ‐19 cm BOP: ‐20 cm
5 0.50% 0.91% 0.50% 5
250 cm

WP
ϕ 110 mm
BOP: ‐20 cm
0.00%
87 cm141 cm

IC
Gully Trap

6 6

From Sump Pit

PROJECT NAME.
Hospital
858 cm

WP
ϕ 90 mm CONSULTANT.
BOP: ‐27 cm
0.00% WP
ϕ 60 mm
7 BOP: ‐14 cm 7
1.01%
Gully Trap
GENERAL  CONTRACTOR.
114 cm 174 cm45 cm

SP
ϕ 110 mm
BOP: ‐21 cm
IC 0.50% ELECTROMECH  CONTRACTOR.

WP
ϕ 60 mm
8 SP
BOP: ‐24 cm DISCIPLINE Ground Floor - Drainage 8
0.10%
ϕ 110 mm
666 cm

BOP: ‐27 cm
0.49%
Ground Floor - Drainage DESIGNED BY Ahmed Akram
1:110 CHECKED BY

SCALE SHEET NO REV CODE


A B C

A B C D E F G K L M O
A B C D E F G K L M N O

219 cm 1500 cm 2000 cm 1900 cm 201 cm

WP WP WP WP WP
GENERAL NOTES
ϕ 110 mm ϕ 110 mm ϕ 110 mm ϕ 110 mm ϕ 110 mm A. THE ORIENTATION OF BUILDING  IS DEFINED  BY 
BOP: ‐37 cm BOP: ‐48 cm BOP: ‐55 cm BOP: ‐45 cm BOP: ‐45 cm
0.50% 1.00% 0.50% 0.30% 0.50% ITS  RELEVANT  NORTH DIRECTION SIGN 
ILLUSTRATED ON THE PROJECT KEY PLAN 
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS.  1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION 
WITH SPECIFICATIONS.
D.  BEFORE COMMENCEMENT OF WORK , THE 
CONTRACTOR SHOULD SUBMIT ALL REQUIRED 
SHOP DRAWINGS FOR THE ENGINEER'S 
APPROVAL.
1272 cm

E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE 
IN MILLIMETERS,AND LEVELS IN METERS 

BOP: ‐35 cm
UNLESS OTHERWISE STATED .

ϕ 110 mm

0.50%
WP
F.  THE CONTRACTOR IS TO VERIFY AND RESOLVE , 
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL  2
DISCREPANCIES OF ANY ACTIVITY BEFORE 
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3
1053 cm

BOP: ‐31 cm
ϕ 110 mm

0.55%
WP
4 4
WP
ϕ 110 mm
BOP: ‐59 cm
3.50%
1217 cm

WP
ϕ 110 mm
BOP: ‐69 cm
ϕ 110 mm

0.50%

BOP: ‐69 cm
WP

5.00%

WP
ϕ 110 mm
BOP: ‐75 cm
0.50%
5 5

WP
273 cm

ϕ 110 mm
BOP: ‐72 cm
0.50% Submersible Pump
6 GPM
35 Ft H2O
BOP: ‐70 cm
ϕ 110 mm

1.50%
WP
624 cm

6 Sump Pit : 0.25 m3 6

P
W  mm m
PROJECT NAME.
0 c
11 4 
ϕ P: ‐6 % Hospital
BOP: ‐70 cm

3
ϕ 110 mm

O
B 2. 3
2.00%
WP

CONSULTANT.
1091 cm

7 7
GENERAL  CONTRACTOR.

ELECTROMECH  CONTRACTOR.
166 cm

Basement - Drainage
8 DISCIPLINE Basement - Drainage 8
1:125
WP WP
DESIGNED BY Ahmed Akram
ϕ 110 mm ϕ 110 mm
BOP: ‐58 cm BOP: ‐39 cm
2.00% 0.50% CHECKED BY

SCALE SHEET NO REV CODE


B C

A B C D E F G K L M N O
A B C D E F G K L M N O

1650 cm 2656 cm 1360 cm 33 cm

VP
ϕ 60 mm
BOP: ‐15 cm GENERAL NOTES
Not Computed
A. THE ORIENTATION OF BUILDING  IS DEFINED  BY 
ITS  RELEVANT  NORTH DIRECTION SIGN 

ϕ 110 mm
BOP: 4 cm
ϕ 110 mm
BOP: 4 cm

ϕ 110 mm
BOP: 4 cm
ϕ 110 mm
BOP: 4 cm
0.67%
0.67%

0.67%
0.67%
SP
SP

SP
SP
ILLUSTRATED ON THE PROJECT KEY PLAN 
VP
Roof Drain
SHOWN IN EACH DRAWING.
ϕ 60 mm
1 Roof Drain Roof Drain
BOP: ‐7 cm Roof Drain B. DO NOT SCALE FROM DRAWINGS.  1
VP 5320343.73% C. DRAWINGS SHOULD BE READ IN CONJUNCTION 
ϕ 60 mm WITH SPECIFICATIONS.
BOP: ‐22 cm
Not Computed D.  BEFORE COMMENCEMENT OF WORK , THE 
CONTRACTOR SHOULD SUBMIT ALL REQUIRED 
SHOP DRAWINGS FOR THE ENGINEER'S 
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE 
IN MILLIMETERS,AND LEVELS IN METERS 
UNLESS OTHERWISE STATED .
F.  THE CONTRACTOR IS TO VERIFY AND RESOLVE , 
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL  2
DISCREPANCIES OF ANY ACTIVITY BEFORE 
COMMENCEMENT OF THEIR RELEVANT WORKS.
2283 cm

SYMBOL LEGEND

VP
ϕ 63 mm
3 BOP: 32 cm 3
BOP: 23 cmNot Computed
ϕ 32 mm

0.00%
RHW

BOP: 25 cm
ϕ 63 mm

0.00%
CW

HW
SP ϕ 63 mm
ϕ 110 mm BOP: 22 cm
BOP: ‐6 cm 0.00%
0.67%

4 Roof Drain 4
819 cm

RHW
6 Electrical Water Heater
ϕ 32 mm
300 Lit Each
BOP: 26 cm
7 KW Each 1208 cm
0.00%
BOP: 25 cm
ϕ 63 mm

0.00%
CW

1067 cm
5 5
Booster Pump
55 GPM
1 Bar
BOP: 25 cm
BOP: 25 cm

ϕ 50 mm
ϕ 50 mm

0.00%
0.00%

CW
CW
2509 cm

VP
ϕ 48 mm
BOP: ‐20 cm 601 cm
1107021.38% 577 cm
6 6

VP
ϕ 60 mm
BOP: ‐28 cm
Not Computed
Potable Water Tank Potable Water Tank PROJECT NAME.
Volume = 20 m3
Filling Pipe = 2"
Volume = 20 m3
Filling Pipe = 2" Hospital
Drain Pipe = 3" Drain Pipe = 3"
BOP: 6 cm
ϕ 90 mm

Over Flow Pipe = 2" Over Flow Pipe = 2"


0.00%
CW

CONSULTANT.
CW
ϕ 90 mm
7 BOP: 6 cm 7
0.00%

GENERAL  CONTRACTOR.
BOP: 6 cm
ϕ 90 mm

0.00%
CW

Sand Filter
ϕ 92 cm
ELECTROMECH  CONTRACTOR.
CW
ϕ 90 mm
From Lifting Pump BOP: 6 cm
Lifting Pump Gpm = 90 Gpm 0.00%
Lifiting Pump Head = 15 m h2o
651 cm

8 DISCIPLINE Roof 8
SP
ϕ 110 mm
BOP: ‐6 cm
0.67%
Roof DESIGNED BY Ahmed Akram

Roof Drain
1:110 CHECKED BY
186 cm

SCALE SHEET NO REV CODE


B C

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING  IS DEFINED  BY 
ITS  RELEVANT  NORTH DIRECTION SIGN 
ILLUSTRATED ON THE PROJECT KEY PLAN 
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS.  1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION 
WITH SPECIFICATIONS.
D.  BEFORE COMMENCEMENT OF WORK , THE 
CONTRACTOR SHOULD SUBMIT ALL REQUIRED 
SHOP DRAWINGS FOR THE ENGINEER'S 
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE 
IN MILLIMETERS,AND LEVELS IN METERS 
UNLESS OTHERWISE STATED .
F.  THE CONTRACTOR IS TO VERIFY AND RESOLVE , 
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL  2
DISCREPANCIES OF ANY ACTIVITY BEFORE 
3D : View Basement - Drainage COMMENCEMENT OF THEIR RELEVANT WORKS.
1:50
SYMBOL LEGEND

3 3

4 4

5 5

6 6

PROJECT NAME.
Hospital
CONSULTANT.

7 7
GENERAL  CONTRACTOR.

ELECTROMECH  CONTRACTOR.

3D : Ground Floor - Bathrrom


8 DISCIPLINE 3D Views 8
1:50
DESIGNED BY Ahmed Akram

CHECKED BY

SCALE SHEET NO REV CODE


A B C

A B C D E F G K L M O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING  IS DEFINED  BY 
ITS  RELEVANT  NORTH DIRECTION SIGN 
ILLUSTRATED ON THE PROJECT KEY PLAN 
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS.  1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION 
WITH SPECIFICATIONS.
D.  BEFORE COMMENCEMENT OF WORK , THE 
CONTRACTOR SHOULD SUBMIT ALL REQUIRED 
SHOP DRAWINGS FOR THE ENGINEER'S 
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE 
IN MILLIMETERS,AND LEVELS IN METERS 
UNLESS OTHERWISE STATED .
F.  THE CONTRACTOR IS TO VERIFY AND RESOLVE , 
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL  2
DISCREPANCIES OF ANY ACTIVITY BEFORE 
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

6 6

PROJECT NAME.
Hospital
CONSULTANT.

7 7
GENERAL  CONTRACTOR.

ELECTROMECH  CONTRACTOR.
3D View : Central Heaters
1:15
8 DISCIPLINE Roof 8

DESIGNED BY Ahmed Akram

CHECKED BY

SCALE SHEET NO REV CODE


A B C

A B C D E F G K L M O

You might also like