Plumbing Workings For A Hospital
Plumbing Workings For A Hospital
A B C D E F G K L M N O
56 cm180 cm 96 cm
CW CW CW CW CW CW CW
ϕ 25 mm ϕ 25 mm ϕ 25 mm ϕ 25 mm ϕ 40 mm ϕ 40 mm ϕ 25 mm
BOP: 294 cm BOP: 294 cm BOP: 294 cm BOP: 294 cm BOP: 293 cm BOP: 293 cm BOP: 294 cm
GENERAL NOTES
72 cm
89 cm ITS RELEVANT NORTH DIRECTION SIGN
BOP: 294 cm
ϕ 25 mm
BOP: 78 cm
ϕ 40 mm
126 cm
CW
ILLUSTRATED ON THE PROJECT KEY PLAN
CW
30 cm
SHOWN IN EACH DRAWING.
BOP: 293 cm BOP: 293 cm
ϕ 40 mm
129 cm
B. DO NOT SCALE FROM DRAWINGS.
CW
1
162 cm
1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
ϕ 32 mm
CW
CW
ϕ 25 mm D. BEFORE COMMENCEMENT OF WORK , THE
19 cm
BOP: 292 cm BOP: 294 cm CONTRACTOR SHOULD SUBMIT ALL REQUIRED
ϕ 63 mm
SHOP DRAWINGS FOR THE ENGINEER'S
CW
26 cm
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
CW IN MILLIMETERS,AND LEVELS IN METERS
ϕ 40 mm UNLESS OTHERWISE STATED .
BOP: 293 cm
BOP: 293 cm
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
ϕ 50 mm
CW
UNDER THE GUIDANCE OF THE ENGINEER, ALL
1553 cm
2 2
61 cm DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
47 cm
CW CW
BOP: 293 cm
ϕ 50 mm
ϕ 63 mm ϕ 63 mm
CW
BOP: 292 cm BOP: 303 cm
3 3
BOP: ‐108 cm
ϕ 63 mm
CW
Section 01
381 cm
CW
ϕ 63 mm
BOP: 292 cm CW
ϕ 50 mm
BOP: 292 cm
BOP: 293 cm
ϕ 63 mm
CW
4 4
1714 cm
1067 cm
CW CW CW CW
ϕ 63 mm ϕ 63 mm ϕ 25 mm ϕ 25 mm
BOP: 292 cm BOP: 292 cm BOP: 294 cm BOP: 294 cm
5 5
BOP: 55 cm
ϕ 40 mm
CW
BOP: 55 cm BOP: 54 cm
119 cm100 cm
ϕ 50 mm
CW
ϕ 40 mm
CW
6 6
BOP: 55 cm
ϕ 40 mm
306 cm
CW
295 cm
1143 cm PROJECT NAME.
Hospital
CONSULTANT.
1067 cm
7 7
1918 cm
GENERAL CONTRACTOR.
BOP: 293 cm
ϕ 40 mm
CW
94 cm
61 cm ELECTROMECH CONTRACTOR.
Section 01
CW CW CW
ϕ 40 mm
BOP: 293 cm
ϕ 50 mm
BOP: 293 cm
ϕ 40 mm
BOP: 293 cm
1:25
8 DISCIPLINE Ground Floor ‐ Cold Water 8
DESIGNED BY Ahmed Akram
CHECKED BY
HW RHW HW HW HW RHW
RHW HW
ϕ 40 mm ϕ 25 mm ϕ 25 mm ϕ 25 mm ϕ 25 mm ϕ 25 mm
ϕ 25 mm ϕ 25 mm
BOP: 283 cm BOP: 284 cm BOP: 284 cm BOP: 284 cm BOP: 284 cm BOP: 284 cm
BOP: 284 cm BOP: 284 cm
GENERAL NOTES
26 cm
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
BOP: 284 cm
ϕ 25 mm
30 cm
SHOWN IN EACH DRAWING.
HW B. DO NOT SCALE FROM DRAWINGS.
1 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
HW WITH SPECIFICATIONS.
ϕ 25 mm D. BEFORE COMMENCEMENT OF WORK , THE
BOP: 284 cm
20 cm CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
41 cm IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
1829 cm
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
BOP: 283 cm
ϕ 40 mm
UNDER THE GUIDANCE OF THE ENGINEER, ALL
HW
2 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
BOP: 284 cm
ϕ 25 mm
RHW
SYMBOL LEGEND
RHW
ϕ 32 mm
BOP: 283 cm
3 3
BOP: ‐118 cm
ϕ 63 mm
HW
29 cm
RHW
ϕ 25 mm
BOP: 284 cm
4 4
BOP: 284 cm
ϕ 25 mm
RHW
BOP: 283 cm
ϕ 50 mm
HW
5 5
HW
2999 cm
ϕ 32 mm
BOP: 283 cm
RHW HW
ϕ 25 mm ϕ 50 mm
BOP: 284 cm BOP: 283 cm
RHW
ϕ 25 mm
BOP: 284 cm
6 6
RHW
ϕ 15 mm
BOP: 284 cm PROJECT NAME.
Hospital
CONSULTANT.
BOP: 283 cm
ϕ 40 mm
HW
7 7
GENERAL CONTRACTOR.
BOP: 284 cm
ϕ 20 mm
RHW
9 cm
ELECTROMECH CONTRACTOR.
CHECKED BY
A B C D E F G K L M O
A B C D E F G K L M N O
IC
SP WP WP WP
ϕ 110 mm ϕ 90 mm ϕ 60 mm ϕ 48 mm
BOP: ‐30 cm BOP: ‐17 cm BOP: ‐8 cm BOP: ‐5 cm WP
0.50% 2.74% 1.01% 1.00% WP WP WP WP ϕ 48 mm
ϕ 60 mm ϕ 48 mm ϕ 48 mm ϕ 42 mm BOP: ‐13 cm
BOP: ‐12 cm BOP: ‐13 cm BOP: ‐10 cm BOP: ‐7 cm 1.14% GENERAL NOTES
0.50% Gully Trap 1.00% 1.00% 1.43%
IC
Gully Trap A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
190 cm 54 cm
ILLUSTRATED ON THE PROJECT KEY PLAN
148 cm
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
393 cm
VP
ϕ 60 mm D. BEFORE COMMENCEMENT OF WORK , THE
BOP: ‐28 cm
0.00%
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
WP
ϕ 60 mm APPROVAL.
139 cm
BOP: ‐7 cm E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
1.03%
IN MILLIMETERS,AND LEVELS IN METERS
WP UNLESS OTHERWISE STATED .
ϕ 48 mm F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
BOP: ‐4 cm
2 1.00% UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
3067 cm
4 4
SP SP SP
ϕ 110 mm ϕ 110 mm ϕ 110 mm
BOP: ‐22 cm BOP: ‐19 cm BOP: ‐20 cm
5 0.50% 0.91% 0.50% 5
250 cm
WP
ϕ 110 mm
BOP: ‐20 cm
0.00%
87 cm141 cm
IC
Gully Trap
6 6
PROJECT NAME.
Hospital
858 cm
WP
ϕ 90 mm CONSULTANT.
BOP: ‐27 cm
0.00% WP
ϕ 60 mm
7 BOP: ‐14 cm 7
1.01%
Gully Trap
GENERAL CONTRACTOR.
114 cm 174 cm45 cm
SP
ϕ 110 mm
BOP: ‐21 cm
IC 0.50% ELECTROMECH CONTRACTOR.
WP
ϕ 60 mm
8 SP
BOP: ‐24 cm DISCIPLINE Ground Floor - Drainage 8
0.10%
ϕ 110 mm
666 cm
BOP: ‐27 cm
0.49%
Ground Floor - Drainage DESIGNED BY Ahmed Akram
1:110 CHECKED BY
A B C D E F G K L M O
A B C D E F G K L M N O
WP WP WP WP WP
GENERAL NOTES
ϕ 110 mm ϕ 110 mm ϕ 110 mm ϕ 110 mm ϕ 110 mm A. THE ORIENTATION OF BUILDING IS DEFINED BY
BOP: ‐37 cm BOP: ‐48 cm BOP: ‐55 cm BOP: ‐45 cm BOP: ‐45 cm
0.50% 1.00% 0.50% 0.30% 0.50% ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
1272 cm
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
BOP: ‐35 cm
UNLESS OTHERWISE STATED .
ϕ 110 mm
0.50%
WP
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
1053 cm
BOP: ‐31 cm
ϕ 110 mm
0.55%
WP
4 4
WP
ϕ 110 mm
BOP: ‐59 cm
3.50%
1217 cm
WP
ϕ 110 mm
BOP: ‐69 cm
ϕ 110 mm
0.50%
BOP: ‐69 cm
WP
5.00%
WP
ϕ 110 mm
BOP: ‐75 cm
0.50%
5 5
WP
273 cm
ϕ 110 mm
BOP: ‐72 cm
0.50% Submersible Pump
6 GPM
35 Ft H2O
BOP: ‐70 cm
ϕ 110 mm
1.50%
WP
624 cm
P
W mm m
PROJECT NAME.
0 c
11 4
ϕ P: ‐6 % Hospital
BOP: ‐70 cm
3
ϕ 110 mm
O
B 2. 3
2.00%
WP
CONSULTANT.
1091 cm
7 7
GENERAL CONTRACTOR.
ELECTROMECH CONTRACTOR.
166 cm
Basement - Drainage
8 DISCIPLINE Basement - Drainage 8
1:125
WP WP
DESIGNED BY Ahmed Akram
ϕ 110 mm ϕ 110 mm
BOP: ‐58 cm BOP: ‐39 cm
2.00% 0.50% CHECKED BY
A B C D E F G K L M N O
A B C D E F G K L M N O
VP
ϕ 60 mm
BOP: ‐15 cm GENERAL NOTES
Not Computed
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ϕ 110 mm
BOP: 4 cm
ϕ 110 mm
BOP: 4 cm
ϕ 110 mm
BOP: 4 cm
ϕ 110 mm
BOP: 4 cm
0.67%
0.67%
0.67%
0.67%
SP
SP
SP
SP
ILLUSTRATED ON THE PROJECT KEY PLAN
VP
Roof Drain
SHOWN IN EACH DRAWING.
ϕ 60 mm
1 Roof Drain Roof Drain
BOP: ‐7 cm Roof Drain B. DO NOT SCALE FROM DRAWINGS. 1
VP 5320343.73% C. DRAWINGS SHOULD BE READ IN CONJUNCTION
ϕ 60 mm WITH SPECIFICATIONS.
BOP: ‐22 cm
Not Computed D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
2283 cm
SYMBOL LEGEND
VP
ϕ 63 mm
3 BOP: 32 cm 3
BOP: 23 cmNot Computed
ϕ 32 mm
0.00%
RHW
BOP: 25 cm
ϕ 63 mm
0.00%
CW
HW
SP ϕ 63 mm
ϕ 110 mm BOP: 22 cm
BOP: ‐6 cm 0.00%
0.67%
4 Roof Drain 4
819 cm
RHW
6 Electrical Water Heater
ϕ 32 mm
300 Lit Each
BOP: 26 cm
7 KW Each 1208 cm
0.00%
BOP: 25 cm
ϕ 63 mm
0.00%
CW
1067 cm
5 5
Booster Pump
55 GPM
1 Bar
BOP: 25 cm
BOP: 25 cm
ϕ 50 mm
ϕ 50 mm
0.00%
0.00%
CW
CW
2509 cm
VP
ϕ 48 mm
BOP: ‐20 cm 601 cm
1107021.38% 577 cm
6 6
VP
ϕ 60 mm
BOP: ‐28 cm
Not Computed
Potable Water Tank Potable Water Tank PROJECT NAME.
Volume = 20 m3
Filling Pipe = 2"
Volume = 20 m3
Filling Pipe = 2" Hospital
Drain Pipe = 3" Drain Pipe = 3"
BOP: 6 cm
ϕ 90 mm
CONSULTANT.
CW
ϕ 90 mm
7 BOP: 6 cm 7
0.00%
GENERAL CONTRACTOR.
BOP: 6 cm
ϕ 90 mm
0.00%
CW
Sand Filter
ϕ 92 cm
ELECTROMECH CONTRACTOR.
CW
ϕ 90 mm
From Lifting Pump BOP: 6 cm
Lifting Pump Gpm = 90 Gpm 0.00%
Lifiting Pump Head = 15 m h2o
651 cm
8 DISCIPLINE Roof 8
SP
ϕ 110 mm
BOP: ‐6 cm
0.67%
Roof DESIGNED BY Ahmed Akram
Roof Drain
1:110 CHECKED BY
186 cm
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
3D : View Basement - Drainage COMMENCEMENT OF THEIR RELEVANT WORKS.
1:50
SYMBOL LEGEND
3 3
4 4
5 5
6 6
PROJECT NAME.
Hospital
CONSULTANT.
7 7
GENERAL CONTRACTOR.
ELECTROMECH CONTRACTOR.
CHECKED BY
A B C D E F G K L M O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
4 4
5 5
6 6
PROJECT NAME.
Hospital
CONSULTANT.
7 7
GENERAL CONTRACTOR.
ELECTROMECH CONTRACTOR.
3D View : Central Heaters
1:15
8 DISCIPLINE Roof 8
CHECKED BY
A B C D E F G K L M O