INSTALLATION MANUAL
DJ Model
Notes to Users
Refer to read this manual and Exhibit A before Absorption Chiller/Heater installation.
If you need any information about maintenance contract or any other inquiries,
please contact Carrier/SANYO service agent.
814-6-0502-946-00-0
Note: The contents of this manual are subject to change without notice.
Absorption Chiller/heater Installation Manual
<Direct-Fired type>
Table of Contents
1. INSTALLATION
1-1. USE ENVIRONMENT ………………………………………………………………1
1-2. SAFETY INSTALLATION ………………………………………………………………7
1-3. DELIVERY INSPECTION ………………………………………………………………7
1-4. RIGGING ………………………………………………………………9
1-5. SLIDING ………………………………………………………………9
1-6. SETTING ON THE FOUNDATION ………………………………………………………………9
1-7. LEVELING ……………………………………………………………10
1-8. FIELD ASSEMBLY ……………………………………………………………12
1-9. PIPING ……………………………………………………………19
1-10. FIELD WIRING ……………………………………………………………20
1-11. PURGING ……………………………………………………………21
1-12. INSULATION ……………………………………………………………25
2. TEST OPERATION
2-1. EXTERNAL VISUAL INSPECTION ……………………………………26
2-2. SOLUTION CHARGE ……………………………………26
2-3. ELECTRICAL CHECK ……………………………………28
2-4. INITIAL SETTING FOR operation board AND INVERTER
……………………………………30
2-5. DAMPER SETTING AND VALVE POSITION ……………………………………30
2-6. PURGING ……………………………………30
2-7. FUNCTION TEST ……………………………………31
2-7. BURNER AND FUEL PIPING ……………………………………35
2-8. OPERATION ……………………………………37