CM 021 236 00
CM 021 236 00
2. Standard
No leak and the finish is good.
Refer to following A. to D. and document "Typical field assembly method CM-021-231"
3. Welder
The qualified person perform welding work.
4. Note
4-1. After finish the welding all pipe, perform leak test by installation manual.
4-2. If leak is found, modify it immediately. And leak test again.
A. Grooving
45+5o or-5o
0.5--2.4mm
0.02--0.1inch
20A -- 100A
3/4 inch
--4inch
30+5o or-5o
1.0--3.5mm
0.04--0.14inch
Over 100A
Over 4inch
1/2
B. Root spacing CM-021-236-00
2.0--4.0mm
0.08--0.16inch
under 2.5mm
under 0.1inch
D. Offset
x mm
x inch
PART Offset
Cooling water under 3.2mm
pipe under 0.13inch
under 2.5mm
Other pipes under 0.1inch
2/2