Makati Development Corporation Project: COG 4 Tryne Enterprise Plaza (Xavier B1)
MDC Corporate Center Radian Street ARCA South Estate  
Western Bicutan
Taguig,  1630
P: 0287590800
 
 

Submittal #08800-RFA-ALV109-AR-SD-08800-0223.0 - ALV-109 TRYNE


-APPROVAL OF UPDATED PANEL MODULATION AT 2ND FLOOR TO ROOF
DECK BY FASCLAD
08800 - Glazing
 

Revision 0 Submittal Manager Keybette Jintalan (Makati Development


Corporation)

Status Open Date Created Mar 9, 2023

Issue Date Mar 17, 2023 Spec Section 08800 - Glazing

Responsible Received From


Contractor

Received Date   Submit By  

Final Due Date Apr 4, 2023 Lead Time 14 day(s)

Cost Code

Location Tower1 Type SD: Shop Drawing

This Period
Accomplishment:

Reconciled This
Period
Accomplishment:

Approvers Benidicto Gavino (Benedicto Limjap Gaviño Façade Design Consultancy), Kristian Jayme (Benedicto Limjap Gaviño Façade
Design Consultancy), Joey Laroco (Benedicto Limjap Gaviño Façade Design Consultancy), AURORA LIM (VisionArch Inc.), Ian
Antonio (Alveo Land Corp.), Pauline Conde (ALVEO - IDG), Keybette Jintalan (Makati Development Corporation), Alpha Tenebro
(Makati Development Corporation)

Ball in Court Keybette Jintalan (Makati Development Corporation)

Distribution Christine Joy Gesmundo (Makati Development Corporation), Cedrick Martin (Makati Development Corporation), Marry An
Vergara (Makati Development Corporation), Bonifacio Mape (Makati Development Corporation), Vanessa Belen (Makati
Development Corporation), Alpha Tenebro (Makati Development Corporation), Mae Joyce Catacutan (Makati Development
Corporation), JOHN ROIE DAWANG (Makati Development Corporation), BRENDELL FORTUNATO (Makati Development
Corporation), ARNETH GUIZON (Makati Development Corporation), Yvette Marie Sotelo (Makati Development Corporation),
Nikko Lean Ramos (Makati Development Corporation), Cristy Legaspi (Makati Development Corporation), Donabee Siasico
(Makati Development Corporation), Ma. Vienna Garcia , NEILBERT CATIPON (Makati Development Corporation), AMBER
MARIE AYSON (Makati Development Corporation), NATHANIEL VILLANUEVA (Makati Development Corporation), VITO
CARLO SUBEJANA (Makati Development Corporation), Kristofer Cuaresma (Makati Development Corporation)

Description Good day Maám/Sir,
 
Please see attached file for your comments and approval.
 
Thank you.
 
 
FOR CHANGE ORDERS ONLY

Category Cost Element

Original Contract Cost Impact (PhP)


Amount (Php)

 
Makati Development Corporation Page 1 of 2 Printed On: Aug 7, 2023 13:45 +08
   
Submittal #08800-RFA-ALV109-AR-SD-08800-0223.0 - ALV-109 TRYNE
-APPROVAL OF UPDATED PANEL MODULATION AT 2ND FLOOR TO Project: COG 4 Tryne Enterprise Plaza (Xavier B1)
ROOF DECK BY FASCLAD
 
Time Impact (Days) Proposed Amount
(Php)

Reconciled Amount With Approved


(Php) Budget / SBAR

Awarded Plans NOC Number

WAO Number
 
 
FOR ACCOUNTS PAYABLE ONLY

AP Status Reason for


Rejection
 
 
Submittal Workflow
Name Sent Date Due Date Returned Date Response Attachments

General Information         TYPICAL FLOOR PLAN - PANEL
Attachments MODULATION.pdf 

Benidicto Gavino Mar 9, 2023 Mar 23, 2023   Pending

Kristian Jayme Mar 9, 2023 Mar 23, 2023   Pending

Joey Laroco Mar 9, 2023 Mar 23, 2023 Apr 12, 2023 For Record Only TYPICAL FLOOR PLAN - PANEL


MODULATION_BLG COMMENTED.pdf  

AURORA LIM Apr 12, 2023 Mar 28, 2023 Apr 13, 2023 Approved with tryne_enterprise_plaza-submittal#rfa-


Comment alv109-rev-0-updated panel modulation.pdf  

Comment -NO OPERABLE PANELS AT ROOF DECK (NOT APPLICABLE)
-SEE COMMENTS ON THE ATTACHED DRAWING.
-APPROVED ON WINDOW MODULATION ONLY. FACADE DETAILS FOR FURTHER APPROVAL BY THE FACADE
CONSULTANT.
-FOR FINAL APPROVAL OF CM AND PROPONENT. 

Ian Antonio Apr 13, 2023 Mar 31, 2023   Pending

Pauline Conde Apr 13, 2023 Mar 31, 2023 Jul 17, 2023 Approved with RFA-ALV109-AR-SD-08800-0223-ALV-


Comment 109_TRYNE-
APPROVAL_OF_UPDATED_PANEL.pdf  
RFA-ALV109-AR-SD-08800-0223-ALV-
109_TRYNE-
APPROVAL_OF_UPDATED_PANEL.pdf  

Comment - Provide signed-off approval of shop drawings for panel modulation as reference to fabrication.
-  Ensure panels fronting the columns are labeled as spandrels covering the entire column; preferably on center. Provide
also backpan detail in the interior. Refer to previous IDG comments on spandrel locations.
- Revise and resubmit separate RFA for bank panels subject for approval. 
- Inform team if columns are visible from outside for teams final approval.
 
Note: All approvals made by the owner do not relieve the contractor of its responsibilities to ensure the correctness of the
dimensions, details, and design of adequate connection and details contained in the shop drawings. The owner's approval
shall also not relieve the contractor from its obligation to ensure that the approved devices, materials, and similar submittals
strictly comply with the requirement of the design. 
 

Keybette Jintalan Apr 20, 2023 Apr 4, 2023 Aug 2, 2023 Approved with


Comment

Comment ok to proceed. ensure compliance with BLG, VA and IDGs comments.

Alpha Tenebro Aug 2, 2023 Apr 4, 2023 Aug 2, 2023 For Record Only

 
Makati Development Corporation Page 2 of 2 Printed On: Aug 7, 2023 13:45 +08
PROPRIETARY NOTE:
This drawing sheet and the contents herein are the sole property of
GSSI INC. Use of this drawing,contents, or design concepts for purpose
other than estimating,drawing preparation, and/or manufacturing

SINGLE AWNING for GSSI INC. shall be cause for legal recourse by GSSI INC.

KEY PLAN

PROJECT

ALVEO XAVIER
ARCA SOUTH TAGUIG

ARCHITECT

VISIONARY
BLG COMMENTS ARCHITECTURE
1. THIS NOTED OWNER

2. ENSURE BASED ON THE LATEST AND APPROVED PLANS AND DETAILS OF THE DESIGN ARCHITECT AYALA LAND INC.
AND STRUCTURAL ENGINEER
3. ENSURE COMPLIANCE TO APPROVED FACADE TECHNICAL SPECIFICATIONS CONCEPT DESIGNER
4. FOR FURTHER REVIEW AND COMMENTS OF THE DESIGN ARCHITECT

CIVIL & STRUCTURAL ENGINEER

MAIN CONTRACTOR

CURTAIN WALL CONSULTANT

BENEDICTO LIMJAP GAVIÑO


FACADE DESIGN CONSULTANCY

IDG: Ensure panels SHOP DRAWINGS


fronting the columns
are labeled as
spandrels covering the 02 FOR APPROVAL 17-May-22 JE
01 FOR APPROVAL 13-Nov-21 JE
entire column; 00 FOR APPROVAL 30-Oct-21 JE

preferably on center. Rev. Description Date By

LEGEND
GL1 - VISION
30.52MM THK IGU LAMINATED GLASS CONSIST OF:
6MM HS CLEAR + 1.52 PVB + 8MM HS W/ YKE0151-
TS (#4) + 9 MM AS + 6MM HS CLEAR GLASS
GL3 - SPANDREL
15.52MM SPANDREL LAMINATED GLASS CONSIST:
6MM HS CLEAR + 1.52 PVB + 8MM CLEAR W/
REFLECTIVE COATING (#4)
GL5 - VISION
30MM THK IGU GLASS CONSIST OF:
8MM HS W/ LOW-E YKE 0151J- TS (#2) + 16MM AS +
6MM HS CLEAR GLASS
GL6 - SPANDREL
8MM THK SPANDREL GLASS CONSIST OF:
8MM HS CLEAR W/ REFLECTIVE COATING (#2)

GL7 - VISION
FIXED PANEL 30MM THK IGU GLASS CONSIST OF:
8MM HS CLEAR W/ DOUBLE LOW-E YKE 0151J-
TS (#2) + 12 ASP + 10MM HS CLEAR GLASS
GL4 - SPANDREL
30MM THK IGU GLASS CONSIST OF:
8MM HS W/ LOW-E YKE 0151J- TS (#2) + 16MM AS +
6MM HS CLEAR GLASS

IDG: Adjust spandrel SINGLE AWNING


size from 1500mm
to 1625mm to fully FIXED PANEL Drawing Title

cover column at UNITIZED CURTAIN WALL SYSTEM


Grids T1 & T9. TYPICAL FLOOR PLAN
PANEL MODULATION

# 9 P. Jacinto St., Canumay, Valenzuela City, Philippines


Telephone Nos.: (+632) 724.56.82 (+632) 721.61.71

Drawn By Checked By Approved By

JE - -
Date of Issue Design Scale (A3 Size Paper)
17-May-22 AS SHOWN
FC Job No. Lot No.

---- --
Drawing No. Revision No.

SD-100 03


!
,

frcyn
Tl cd ,umn
Ad'
, SINGLE
16R
T9 spa
」 )
mm

AWNIN

SIN

LE
4. 3.ENSUR E 2.

AWNING AND
THIS 0
SU
FURTHER ST RUCT URAL
NOTED
0M
COMPLIANCE
LEGEND BASE
E
~
1
REVIEW

ON

… E NGINE E R

THE
TYPES

TO
AND

-
-AT
APPR OVED

COMMENTS
OFCUR TAIN
5TA20

FACADETECHNICAL

OF

OVEDPLANSA
WALLPANEL

THE

DESIGN

ARCHITECT

DDETAILSOFTHE

CIFICATIONS

IGN

BE:
ARCHITECT

re
E ns•npa ne is

FIXED column


PANEL

19

PANEL TYPICAL UNITIZED


BENEDICTO

AR CHITECTUR E
SHOP
ALVEO
AYALA

SD MODULATION
VIS
FLOOR
CUR TAIN

DRAWINGS
, IONARY
100

PLAN
AND XAVIER

WALL
AS

SHOWN GAVINO
INC.
SYSTEM

You might also like