QS LINK POWER REQUIREMENTS ONE-LINE

DEVICE PDUS
WIRE LEGEND
QS DEVICES THAT SUPPLY PDU
Q QS CONTROL LINK (CONNECT WIRES 1, 2,
DIN RAIL POWER SUPPLY +75 3 AND 4)*
Q QS CONTROL LINK (CONNECT WIRES 1, 3
MYROOM DIN RAIL POWER SUPPLY +30 AND 4. DO NOT CONNECT WIRE 2)*
QS PLUG-IN POWER SUPPLY, QS J-BOX POWER
+8
NOTES ON WIRING SUPPLY P PANEL CONTROL LINK (CONNECT WIRES 1,
2, 3, 4 AND 5)*
ENERGI SAVR NODE WITH ECOSYSTEM, ENERGI
QS CONTROL LINK SAVR NODE WITH DALI, ENERGI SAVR NODE +30
THE QS CONTROL LINK HAS A FREE WIRING TOPOLOGY (DAISY CHAIN, T-TAP, ETC). THE SYSTEM WIRING WITH T-SERIES TUNABLE-WHITE PANEL CONTROL LINK (CONNECT WIRES 1,
P
ILLUSTRATED BY THIS DRAWING HAS BEEN LAID OUT TO ENSURE APPROPRIATE POWER TO EACH DEVICE. IF FOR ENERGI SAVR NODE FOR 0–10 V, ENERGI SAVR 2, 3 AND 4. DO NOT CONNECT WIRE #5)*
ANY REASON THE SYSTEM IS TO BE WIRED DIFFERENTLY THAN WHAT IS SHOWN, PLEASE CONFIRM ALL DEVICE NODE WITH SOFTSWITCH, ENERGI SAVR NODE
GRX-CESO-277PKG +14
GRX-CESO POWER REQUIREMENTS ARE MET (PLEASE REFER TO “QS LINK POWER REQUIREMENTS” FOR INDIVIDUAL DEVICE FOR 0–10 V (DIN RAIL), ENERGI SAVR NODE WITH
CCI 1 Floor 1\Sheet 1\ Devices - CCO P PANEL CONTROL LINK (CONNECT WIRES 1,
220V Daylight Package 003 POWER REQUIREMENTS). SOFTSWITCH (DIN RAIL)
3, 4 AND 5. DO NOT CONNECT WIRE #2)*
FOR QS CONTROL WIRE LENGTHS TOTALING LESS THAN 500 FT (153 M), USE LUTRON CABLE GRX-CBL-346S (4 1 A MYROOM DIN RAIL POWER MODULE
GRX-LC8 PP-DV
CONDUCTOR NON-PLENUM), OR GRX-PCBL-346S (4 CONDUCTOR PLENUM). OTHERWISE USE 2 #18 AWG (1.0 SQ MM) + SWITCHING, 1 A MYROOM DIN RAIL POWER +4 QS SIVOIA SHADE CONTROL LINK*
S
Feed** MODULE PHASE ADAPTIVE
2 #22 AWG (0.5 SQ MM) TWISTED AND SHIELDED OR EQUIVALENT (BELDEN #9461). FOR QS CONTROL WIRE LENGTHS
TOTALING UP TO 2,000 FT, USE GRX-CBL-46L (5 CONDUCTOR NON-PLENUM) OR GRX-PCBL-46L (5 CONDUCTOR ENERGI SAVR NODE WITH DALI (DIN RAIL),
+3 T BELDEN CABLE 1387LA(OR EQUIVALENT)
ENERGI SAVR NODE WITH ECOSYSTEM (DIN RAIL)
PLENUM). TOTAL QS CONTROL WIRE LENGTH MUST NOT EXCEED 2,000 FT (600 M).
ENERGI SAVR NODE PHASE ADAPTIVE (DIN RAIL),
Link 1 : QS QS MOTOR GROUP CONTROLLER (DIN RAIL), 0 NORMAL INPUT POWER 2 #12 AWG (4 SQ
Q (7 QS Devices) ECOSYSTEM BUS/LOOP* HOMEWORKS QS DIN RAIL POWER MODULES MM) + GROUND
THIS IS A TOPOLOGY-FREE AND POLARITY-FREE WIRING (DAISY-CHAIN, T-TAP, HOME-RUN ETC.). KEEP ALL THE
GRAFIK EYE QS (ALL MODELS EXCEPT GRAFIK NORMAL-EMERGENCY INPUT POWER 2
Q
Link 2 : QS DRIVERS/MODULES IN ONE ROOM ON THE SAME LOOP WHENEVER POSSIBLE. ECOSYSTEM LOOPS ARE SHOWN ON +3
EYE QS DALI WITH KNX), QS TIMECLOCK #12 AWG (4 SQ MM) + GROUND
THE LIGHTING PLANS. IF THERE IS A DISCREPANCY, AND IF ROOMS ARE WIRED ON A DIFFERENT LOOP THAN THE
LINK A : 0
ONE SHOWN, LUTRON NEEDS TO BE NOTIFIED AS THIS INFORMATION IS IMPORTANT FOR PROGRAMMING THE QP2 QUANTUM LIGHTING HUB LINKS B,C,D :
ALP6C-FT-4F1U-1N1C-L SYSTEM. +33 EACH 3 PHASE 4 WIRE INPUT POWER, 4 #12
Floor 1\Sheet 1\ Devices QSWE-10BRLN-AW-NST
Floor 1\Sheet 1\ Devices - Control Station 003 USE LUTRON CABLE C-CBL-216-GR1 (2 #16 CONDUCTOR NON-PLENUM) OR C-PCBL-216-CL-1 (2 #16 CONDUCTOR
3
Athena DIN Rail Panel 3 LINKS A,B : AWG (4 SQ MM) + GROUND
Athena DIN Rail Panel (1613mm H, International seeTouch QS Wallstation Non Insert 10 QP3 QUANTUM LIGHTING HUB
Button with Raise/Lower
PLENUM RATED). OTHERWISE USE 2 #16 AWG (1.5 SQ MM) BY OTHERS. +33 EACH
467mm W, 108mm D): 220 V-240 V,
feed-through. Scenes 1-9 + Off with Scene Raise/Lower LOOP LENGTH IS LIMITED BY THE WIRE GAUGE USED FOR E1 AND E2 AS FOLLOWS: LINKS
Includes 4 Switching modules, 1 DALI 1 gang backbox
TWO PROCESSOR LIGHTING HUB (QP5) 2 #12 AWG (4 SQ MM) + GROUND
A,B,C,D : +33
module, 1 Processor, 1 QSE-IO and 1
link power supply. EACH
SINGLE PROCESSOR LIGHTING HUB (QP5), 2-LINK LINKS A,B :
PROCESSOR (QP-2L) +33 EACH
3 #12 AWG (4 SQ MM) + GROUND
1-LINK PROCESSOR LIGHTING HUB (QP6), 1-LINK
LINKS A : +33
PROCESSOR LIGHTING HUB (QP5), 1-LINK 0-10 V SIGNAL: 2#18AWG (1.0 SQ MM)
EACH
PROCESSOR (QP-1L)
LCP 3 2#18 AWG (1.0 SQ MM)
QS DEVICES THAT CONSUME PDU
WIRE GAUGE MAX LOOP LENGTH QS WALLSTATION (SEETOUCH, ARCHITRAVE, 3#18 AWG (1.0 SQ MM)
SIGNATURE SERIES, QS PICO, KEYSWITCH,
#18 AWG (1.0 SQ MM) 550 FT (167M)
SINGLE COLUMN PALLADIOM), QS SLIDER, -1 ECOSYSTEM BUS/LOOP*
#16 AWG (1.5 SQ MM) 900 FT (274M) GRAFIK T SLIDER, QS INFRARED (IR) EYE,
#14 AWG (2.5 SQ MM) 1,400 FT (426 M) WALLBOX INPUT CLOSURE INTERFACE
#12 AWG (4 SQ MM) 2,200 FT (670M) QS NETWORK INTERFACE, QS DMX INTERFACE, DALI LOOP
ENERGI SAVR NODE PROGRAMMING INTERFACE, -2
QS WALLSTATION (DOUBLE COLUMN PALLADIOM)
T T-SERIES TUNABLE-WHITE LOOP

QS SENSOR MODULE (QSM), NOT INCLUDING LUTRON SENSOR CABLE C-CBL-522S OR


ATTACHED WIRED SENSORS (SEE SECTION USE 4#22 AWG (1.0 SQ MM)
BELOW FOR MORE INFORMATION), QS CONTACT -3
CLOSURE INTERFACE, PALLADIOM ROOM LUTRON SENSOR CABLE C-CBL-522S OR
THERMOSTAT USE 3#22 AWG (1.0 SQ MM)
GUESTROOM CONTROL UNIT -8 DMX CABLE. USE LUTRON
D
GRX-CBL-DMX-250/GRX-CBL-DMX-500 OR
SENSORS & DEVICES THAT CONSUME PDUS WHEN BELDEN #9729 (NON-PLENUM) OR BELDEN
WIRED TO A QSM #89729 (PLENUM) OR DURA FLEX 22/4 WA
LUTRON DAYLIGHT SENSOR, LUTRON INFRARED CABLE.
-0.5
(IR) RECEIVER, PICO WIRED CONTROLLER E ETHERNET CABLE. CAT5E OR BETTER
CABLE FOR LUTRON NETWORK
GRX-CESO GRX-CESO-277PKG ECOSYSTEM WALLSTATION -1 TERMINATED WITH RJ45 CONNECTORS
CCI 1 Floor 1\Sheet 1\ Devices - CCO
220V Daylight Package 002
LOS C SERIES OCCUPANCY SENSOR, HIGH BAY (NOT PROVIDED BY LUTRON). 328 FT
-2 (100 M) MAXIMUM RUN.
GRX-LC8 PP-DV OCCUPANCY SENSOR
F FIBER OPTIC CABLE FOR LUTRON
Feed** NETWORK TERMINATED WITH
APPROPRIATE FIBER OPTIC CONNECTORS
(NOT PROVIDED BY LUTRON). REQUIRES
LUTRON SERVICES DEDICATED FIBER OPTIC LINK
E
LCP 2 Link 1 : QS
SERVICE TITLE (MODEL
SERVICE DESCRIPTION
(SINGLE-MODE OR MULTI-MODE)
Q (7 QS Devices) NUMBER) RF CONNECTION
QTY
CUSTOMER NOTE: AN OUTBOUND INTERNET Q THE QUANTITY OF SERVICES BELOW ARE TO BE INCLUDED AS PART OF THIS PROJECT'S SCOPE OF WORK AND SPECIFIED INTO THE WRITTEN SPEC DOCUMENTS WIRED CONNECTION
CONNECTION FROM THE ATHENA SYSTEM Link 2 : QS
SUPPLIED IS REQUIRED FOR LUTRON APP & ATHENA
INTERNET DASHBOARD FUNCTIONALITY. PRE-STARTUP ELECTIVE SERVICES
ALP6C-FT-5F-1N1C-L *PLEASE REFER TO NOTES ON WIRING FOR
Floor 1\Sheet 1\ Devices QSWE-10BRLN-AW-NST REMOTE PRE-WIRE SESSION A REMOTE SESSION WHERE THE LUTRON FIELD SERVICE ENGINEER REVIEWS THE LUTRON SUBMITTAL PACKAGE (PARTICULARLY THE ONE LINE AND DEVICE SPECIFICATIONS) MORE WIRING GUIDELINES.
Athena DIN Rail Panel 2 Floor 1\Sheet 1\ Devices - Control Station 002 (LSC-PREWIRE-RMTE) WITH THE ELECTRICAL CONTRACTOR, ANSWERS QUESTIONS, AND REVIEWS THE CONSTRUCTION TIMELINE ALONG WITH BEST PRACTICES FOR INSTALLATION. THIS SESSION IS
International seeTouch QS Wallstation Non Insert 10
**REFER TO LOAD SCHEDULE FOR FEED
Athena DIN Rail Panel (1613mm H, DELIVERED USING A VIRTUAL SCREEN SHARING PLATFORM AND SHOULD NOT EXCEED 4-HOURS.
E 467mm W, 108mm D): 220 V-240 V, Button with Raise/Lower AND LOAD INFORMATION
feed-through. Scenes 1-9 + Off with Scene Raise/Lower ONSITE PRE-WIRE VISIT AN ONSITE VISIT WHERE THE LUTRON FIELD SERVICE ENGINEER REVIEWS THE LUTRON SUBMITTAL PACKAGE (PARTICULARLY THE ONE LINE AND DEVICE SPECIFICATIONS) WITH
Includes 5 Switching modules, 1 1 gang backbox (LSC-PREWIRE-ONST) THE ELECTRICAL CONTRACTOR, ANSWERS QUESTIONS, AND REVIEWS THE CONSTRUCTION TIMELINE ALONG WITH BEST PRACTICES FOR INSTALLATION.
Processor, 1 QSE-IO and 1 link power
LUTRON CLOUD CONNECTION E supply. POST-WIRE TERMINATION AN ON-SITE WALK THROUGH BY A LUTRON FIELD SERVICE ENGINEER WITH THE ELECTRICAL CONTRACTOR TO CONFIRM THE PROCESSORS ARE ONLINE, THE DEVICES ARE
(REQUIRES INTERNET CONNECTION)
VISIT INSTALLED AND WIRED PROPERLY, AND THE SYSTEM IS COMMUNICATING EFFICIENTLY PRIOR TO LUTRON RETURNING TO SITE FOR THE PHYSICAL STARTUP OF THE SYSTEM.
(LSC-POSTWIRE-VST) THIS VISIT IS INTENDED AS A HIGH LEVEL VERIFICATION/CONFIRMATION THAT THE LUTRON EQUIPMENT IS WIRED AND POWERED; IT DOES NOT INCLUDE WIRING
TROUBLESHOOTING, OR VALIDATION THAT THE ENTIRE SYSTEM WAS INSTALLED PER THE APPROVED SUBMITTAL. LUTRON WILL WORK TO CONFIRM OVERALL WIRING READINESS
AND BASIC SYSTEM FUNCTIONALITY PRIOR TO START-UP AND WILL NOTE ANY DEFICIENCIES FOR THE ELECTRICAL CONTRACTOR. THE LUTRON SYSTEM MUST BE WIRED AND PROJECT NAME:
POWERED PRIOR TO THIS SITE VISIT. 630 PESTIGE ONE RESIDENTIAL
ABD-#Y-NEW SYSTEM & NETWORK A CONSULTATIVE VISIT WITH THIRD PARTY INTEGRATORS TO CONFIRM THE SPECIFIED SEQUENCE OF OPERATION AND DISCUSS INTEGRATION PROCEDURES NEEDED IN ORDER
ATHENA CLOUD DASHBOARD INTEGRATION TO INTEGRATE WITH THE LUTRON EQUIPMENT. THIS MAY INCLUDE ANY OF THE FOLLOWING THIRD PARTY SYSTEMS: BMS, BAS, IT, NON-LUTRON SHADES, BACNET, AV, OR LOCATION:
(COMPUTER / TABLET CONSULTATION ENERGY DASHBOARDS. DUBAI
PROVIDED BY CUSTOMER) (LSC-INT-VISIT)
SMARTPHONE CONNECTS TO LUTRON ATHENA
(PROVIDED BY CUSTOMER) SYSTEM VIA BROWSER STARTUP ELECTIVE SERVICES PROJECT NUMBER:
CONNECTS TO LUTRON ATHENA SYSTEM REQUIRES INTERNET (THESE SERVICES ARE ADDITIONAL TO YOUR SPECIFIED STARTUP BASED ON YOUR REQUIREMENTS)
VIA DOWNLOADABLE LUTRON APP
REQUIRES INTERNET ONSITE SCENE & LEVEL AN ONSITE VISIT WITH THE SPECIFIER OR CUSTOMER REPRESENTATIVE TO REVIEW THE DESIGN INTENT, FINE-TUNE THE SCENE LEVEL PROGRAMMING, AND MAKE
TUNING ADJUSTMENTS TO TIMECLOCKS. CREATED BY:
(LSC-AF-VISIT) JANHVI GUPTA
DYNAMIC WHITE A SPECIFIER DRIVEN PACKAGE WHICH INCLUDES ONE (1) POST WIRE TERMINATION VISIT (FOR WIRE VERIFICATION), TWO (2) VISITS TO PERFORM FINE TUNING OF FIXTURES AND
PROGRAMMING PACKAGE PROGRAMMING ADJUSTMENTS PER THE DIRECTION OF A LIGHTING DESIGNER AND/OR A PRE-DETERMINED SEQUENCE OF OPERATIONS PROVIDED BY THE SPECIFIER. THE FIRST FILE NAME:
(LSC-DWP-PKG) FINE-TUNING VISIT IS DURING NORMAL BUSINESS HOURS AND THE SECOND VISIT IS AN AFTER HOUR SITE VISIT. ALSO INCLUDED IN THIS PACKAGE IS A TWO-HOUR REMOTE 630 PESTIGE ONE RESIDENTIAL.LUTD
SESSION FOR MINOR ADJUSTMENTS. REMOTE NETWORK ACCESS IS REQUIRED FOR THE REMOTE TWO HOUR SESSION AND THE SYSTEM MUST BE ABLE TO CONNECT TO THE
INTERNET.
ONSITE AN ONSITE WALKTHROUGH WITH FACILITY REPRESENTATIVES OR PROJECT COMMISSIONING AGENTS TO DEMONSTRATE THAT THE SYSTEM FUNCTIONALITY MEETS THE DESIGN DOCUMENT REVISION:
GRX-CESO GRX-CESO-277PKG PERFORMANCE-VERIFICATIO INTENT. THIS MAY INCLUDE ANY OF THE FOLLOWING ONSITE ACTIVITIES – CONSULTATION/TRAINING DEMOS, FUNCTIONAL TESTING ASSISTANCE, OR INVENTORY OF LUTRON
CCI 1 Floor 1\Sheet 1\ Devices - CCO N WALKTHROUGH EQUIPMENT.
220V Daylight Package 001
(LSC-WALK) MAY 25, 2023 | Sheet 1 OF 2
GRX-LC8 PP-DV AFTER HOURS STARTUP STARTUP PROVIDED BETWEEN THE HOURS OF 5:00PM – 7:00AM, MONDAY - FRIDAY. THIS SCOPE OF WORK DOES NOT INCLUDE HOLIDAY OR WEEKEND WORK. ADDITIONAL FEES
Feed** (LSC-AH-SU) MAY APPLY FOR WORK TO BE COMPLETED ON WEEKENDS (FRIDAY 5:00PM – MONDAY 7:00AM).

POST-STARTUP ELECTIVE SERVICES


CUSTOMER SYSTEM AN ON-SITE VISIT WHERE THE LUTRON FIELD SERVICE ENGINEER COMES OUT 30-90 DAYS POST-OCCUPANCY TO GO OVER THE LUTRON SYSTEM COMPONENTS WITH THE FOR DETAILED DEFINITION OF PRODUCT
LCP 1 Q
Link 1 : QS
(5 QS Devices)
ORIENTATION VISIT SYSTEM USER AND PERFORMS A THOROUGH TRAINING. THE FIELD SERVICE ENGINEER WILL ENSURE THE SYSTEM USER KNOWS HOW TO NAVIGATE WITHIN THEIR SYSTEM AND CAPABILITIES REFER TO PRODUCT
(LSC-CSO-VST) MAKE APPROPRIATE ADJUSTMENTS. THEY WILL ALSO PROVIDE A LEAVE BEHIND SYSTEM OPTIMIZATION RECOMMENDATION REPORT. SPECIFICATION SUBMITTAL SHEETS.
TRAINING VISIT CUSTOMER-SITE SOLUTION TRAINING – THIS TRAINING VISIT IS PROVIDED BY A LUTRON SERVICES REPRESENTATIVE TO TEACH SYSTEM USERS HOW TO OPERATE AND MAINTAIN
Q
Link 2 : QS (LSC-TRAINING-SP) THE LIGHTING CONTROL SYSTEM. QUANTITY DICTATES THE NUMBER OF VISITS PURCHASED.

PREVENTATIVE VISIT TO PERFORM PREVENTATIVE MAINTENANCE, MINOR REPROGRAMMING, AND CONDUCT SYSTEM TRAINING. THE LUTRON SERVICE REPRESENTATIVE WILL REVIEW SERVICE
ALP3C-FT-3F1U-1N1C-L MAINTENANCE VISIT OPTIONS WITH THE END-USER PRIOR TO BEGINNING ANY WORK. THE END-USER WILL RECEIVE DOCUMENTATION THAT DESCRIBES THE WORK PERFORMED AND ANY
Floor 1\Sheet 1\ Devices QSWE-10BRLN-AW-NST (LSC-SCHD-MAINT) RECOMMENDATIONS FOR FUTURE SERVICE. QUANTITY DICTATES THE NUMBER OF DAYS PURCHASED.
Athena DIN Rail Panel 1 Floor 1\Sheet 1\ Devices - Control Station 001
Athena DIN Rail Panel (921mm H, International seeTouch QS Wallstation Non Insert 10 ADDITIONAL DAY OF ONSITE DAY OF SERVICE BY A LUTRON SERVICE REPRESENTATIVE.
467mm W, 108mm D): 220 V-240 V, Button with Raise/Lower SERVICE
feed-through. Scenes 1-9 + Off with Scene Raise/Lower
1 gang backbox
(LSC-DAY-ADDL-CS)
Includes 3 Switching modules, 1 DALI
module, 1 Processor, 1 QSE-IO and 1 REMOTE SUPPLEMENTAL A SUPPLEMENTAL REMOTE TRAINING FOR SITE PERSONNEL. THIS SERVICE IS AVAILABLE FOR LUTRON QUANTUM AND ATHENA SYSTEMS. THIS TRAINING IS NOT TO EXCEED 4
link power supply.
TRAINING HOURS. REMOTE NETWORK ACCESS IS REQUIRED FOR THIS VISIT AND THE SYSTEM MUST BE ABLE TO CONNECT TO THE INTERNET.
(LSC-TRAIN-RMTE)
REMOTE PROGRAMMING ONE 4-HOUR REMOTE PROGRAMMING ASSISTANCE SESSION TO MAKE PROGRAMMING ADJUSTMENTS PER THE DIRECTION OF A FACILITY MANAGER OR SPECIFIER. THIS SERVICE
ASSISTANCE IS AVAILABLE FOR LUTRON QUANTUM AND ATHENA SYSTEMS. REMOTE NETWORK ACCESS IS REQUIRED FOR THIS VISIT AND THE SYSTEM MUST BE ABLE TO CONNECT TO THE
(LSC-PRG-AST-RMTE) INTERNET.

MAINTENANCE & SUPPORT SERVICES 7200 SUTER ROAD


COOPERSBURG, PA 18036, USA
ENHANCED SILVER YEARS 1-2 - 100% REPLACEMENT PARTS AND 100% LUTRON DIAGNOSTIC LABOR COVERAGE WITH A FIRST-AVAILABLE RESPONSE TIME; YEARS 3-5 - 50% PARTS ONLY COVERAGE;
1 (LSC-E8S) YEARS 6-8 - 25% PARTS ONLY COVERAGE.
+1.610.282.3800 | FAX: +1.610.282.1146

PLEASE GO TO WWW.LUTRON.COM/SERVICES FOR FURTHER INFORMATION.

GENERATED BY: LUTRON DESIGNER VERSION 23.1.0.12608.