Road Rate Analysis 077-78 Final
Road Rate Analysis 077-78 Final
Road Rate Analysis 077-78 Final
Norms
and Serial No:15
2-5.4.3
Scarifying existing granular/bituminous road surface for carrying out the required operations necessary to complete the work. This
includes handling, salvaging, stacking and disposing of scarified material up to a lead of 100 m along the lead route.( For 10to 20 cm
depth)
unit 1 m3
Rate in Amount in
S.No. Description Unit Quantity Remarks
NRs NRs
1.00 Labour
Unskilled md 0.20 750.00 150.00
Skilled md 0.00 0.00
Sub Total Labor 150.00
2.00 Tools / Equipment
Axes, Khukuri, Saws, Crowbars, Wheel Barrows or
Bullock Carts 4.50
Sub Total Tool/Equipment 4.50
Sub Total (Labor+Tool/Equipment) -I 154.50
Contractor Over head 15% of I 23.18
Total rate per m3 177.68
Per sq m 35.54 20cm depth
Excavation in Roadway , drain and foundation of structure including removal and satisfactory disposal of all
materials up to a lead of 50m along the lead route using excavator or breaker and finishing manually wherever and to
what extent necessary
Unit : 1 cum
Manual Equipment
Equipment
Manual Excavation Excavation Excavation Average Rate
S.No Description Excavation
(5%) (95%)
NRs NRs NRs NRs NRs
1 Ordinary soil 444.19 93.15 22.21 88.49 110.70
2 Hard soil 533.03 93.15 26.65 88.49 115.14
3 Ordinary rock 1776.75 93.15 88.84 88.49 177.33
4 Medium rock 3553.50 557.75 177.68 529.86 707.54
5 Hard rock 13426.01 839.50 671.30 797.53 1468.83
Note: Contracter Over head of 15% is included in Equipment Excavation Cost
Item no 21 Road work RATE ANALYSIS OF CONSTRUCTION WORK ITEMS
1.00 Labour
Unskilled md 0.10 750.00 75.00
Skilled md 0.01 1030.00 10.30
Sub Total Labor 85.30
2.00 Material
Diesel Lit 0.12 88.50 10.80
Sub Total Material 10.80
3.00 Tools and equipment
Grader Hr 0.01 1,649.34 16.49
Roller Hr 0.02 1,102.50 18.74
Sub Total Tool/Equipment 35.24
Sub Total (Labor+Material+Tool/Equipment) -I 131.33
Contractor Over head 15% of I 19.70
Total rate per m3 151.03
Total rate per sqm 30.21
1.00 Labour
Unskilled md 0.04 750.00 30.00
Skilled md 0.0050 1,030.00 5.15
Sub Total Labor 35.15
2.00 Material
Diesel Lit 0.79 88.50 70.09
Sub base aggregate m3 1.28 2,540.16 3251.40
Item no 21 Road work RATE ANALYSIS OF CONSTRUCTION WORK ITEMS
Sub Total Material 3321.49
3.00 Tools and equipment
Grader Hr 0.0220 1,649.34 36.29
Vibrating roller Hr 0.0220 1,670.00 36.74
Water browser Hr 0.0380 1,405.00 53.39
Loader Hr 0.0110 2,500.00 27.50
Providing, laying, spreading, watering, leveling and compaction of crusher run materials for base course lead up to 10m.
1.00 Labour
Unskilled md 0.0200 750.00 15.00
Skilled md 0.0050 1,030.00 5.15
Sub Total Labor 20.15
2.00 Material
Diesel Lit 0.99 88.50 87.61
Base aggregate m3 1.20 2,998.80 3598.56
Sub Total Material 3686.17
3.00 Tools and equipment
Grader Hr 0.03 1,649.34 54.43
Vibrating roller Hr 0.03 1,670.00 55.11
Water browser Hr 0.03 1,405.00 46.37
Loader Hr 0.0110 2,500.00 27.50
Providing and spraying bituminous tack coat MC30/MC70 including cleaning the road surface using wire, brushes, broom etc before
applying prime coat. (@0.60lit/sqm)
Unit : lit
1.00 Labour
Unskilled md 0.0460 750.00 34.50
Skilled md 0.0030 1,030.00 3.09
Sub Total Labor 37.59
2.00 Material
Bitumen Lit 1.05 78.10 82.01
Kerosene Lit 0.10 88.50 8.85
Diesel Lit 0.275 88.50 24.34
Sub Total Material 115.19
3.00 Tools and equipment
Boiler Hr 0.0025 880.00 2.20
Sprayer Hr 0.0025 1,800.00 4.50
Air compressor Hr 0.0030 589.00 1.77
Sub Total Tool/Equipment 8.47
Sub Total (Labor+Material+Tool/Equipment) -I 161.25
Contractor Over head 15% of I 24.19
Total rate per litre 185.44
Item no 21 Road work RATE ANALYSIS OF CONSTRUCTION WORK ITEMS
Norms Serial No: 13.03 (DOR)
Clause No.: 1301/ 1302
Providing and spraying bituminous prime coat MC30/MC70 including cleaning the road surface using wire, brushes, broom etc before applying prime
coat.
Unit : lit
SNo Description of works Unit Quantity Rate Amount Remarks
1.00 Labour
Unskilled md 0.0460 750.00 34.50
Skilled md 0.0030 1,030.00 3.09
Sub Total Labor 37.59
2.00 Material
Bitumen Lit 1.05 78.10 82.01
Kerosene Lit 0.10 88.50 8.85
Diesel Lit 0.275 88.50 24.34
Sub Total Material 115.19
3.00 Tools and equipment
Boiler Hr 0.0025 880.00 2.20
Sprayer Hr 0.0025 1,800.00 4.50
Air compressor Hr 0.0030 589.00 1.77
Sub Total Tool/Equipment 8.47
Sub Total (Labor+Material+Tool/Equipment) -I 161.25
Contractor Over head 15% of I 24.19
Total rate per litre 185.44
Norms Serial No: 13.09 (DOR)
Clause No.: 1307 / 1308
Providing, mixing, laying and compaction of premixed carpet
SNo Description of works Unit Quantity Rate Amount Remarks
1.00 Labour
Unskilled md 4.50 750.00 3375.00
Skilled md 0.45 1,030.00 463.50
Sub Total Labor 3838.50
2.00 Material
Bitumen Lit 77.00 78.10 6013.70
Kerosene Lit 7.70 88.50 681.42
Aggregates cum 1.20 3,213.21 3855.85
Sub Total Material 10550.97
3.00 Tools and equipment
Sprayer Hr 0.50 1,800.00 900.00
Roller Hr 0.50 1,102.50 551.25
Sub Total Tool/Equipment 1451.25
Sub Total (Labor+Material+Tool/Equipment) -I 15840.72
Contractor Over head 15% of I 2376.11
Total rate per m3 18216.83
Item no 21 Road work RATE ANALYSIS OF CONSTRUCTION WORK ITEMS
1.00 Labour
Unskilled md 0.14 750.00 105.00
Skilled md 0.10 1,030.00 103.00
Sub Total Labor 208.00
2.00 Material
Bitumen Lit 6.60 78.10 515.46
Kerosene Lit 0.10 88.50 8.85
Diesel Lit 0.81 88.50 71.68
Fine Aggregates cum 0.12 3,213.21 385.59
Sub Total Material 981.58
3.00 Tools and equipment
Boiler Hr 0.04 880.00 35.20
Roller Hr 0.04 1,670.00 66.80
Sprayer Hr 0.01 1,800.00 18.00
1.00 Labour
Unskilled md 0.13 750.00 97.50
Skilled md 0.03 1,030.00 30.90
foreman md 0.01 750.00 7.50
Sub Total Labor 135.90
2.00 Material
Bitumen Lit 117.00 78.10 9137.70
cement t 0.022 16,500.00 363.00
Diesel Lit 10.45 88.50 924.78
Aggregates cum 1.20 2,928.24 3513.89
Sub Total Material 13939.37
3.00 Tools and equipment
Asphalt mixing plant Hr 0.044 2,625.00 115.50
Wheel Loader Hr 0.66 2,500.00 1650.00
asphalt paver Hr 0.22 2,150.00 473.00
Tipper Trucks Hr 0.32 1,050.00 336.00
Steel tyred Roller Hr 0.55 1,270.00 698.50
Pneumatic Rollers Hr 0.55 1670.00 918.50
Sub Total Tool/Equipment 4191.50
Sub Total (Labor+Material+Tool/Equipment) -I 18266.77
Contractor Over head 15% of I 2740.02
Total rate per m3 21006.78
Item no 21 Road work RATE ANALYSIS OF CONSTRUCTION WORK ITEMS
Providing, laying, spreading, watering, leveling and compaction of natural sand gravel sub base grading as per table 12.1 of
standard specification (Gravelling)
Unit : m3
SNo Description of works Unit Quantity Rate Amount Remarks
1.00 Labour
Unskilled md 0.02 750.00 15.00
Skilled md 0.01 1030.00 5.15
Sub Total Labor 20.15
2.00 Material
Diesel Lit 1.98 88.50 175.22
Sub base aggregate m3 1.22 2540.16 3099.00
Sub Total Material 3274.22
3.00 Tools and equipment
Grader Hr 0.04 1649.34 59.38
Vibrating roller Hr 0.04 1670.00 60.12
Water browser Hr 0.05 1405.00 70.25
Loader Hr 0.01 2500.00 27.50
Sub Total Tool/Equipment 217.25
Sub Total (Labor+Material+Tool/Equipment) -I 3511.61
Contractor Over head 15% of I 526.74
Total rate per m3 4038.35
>ldssf] Hofnf b/
Hofnf b/ k|ltlbg ?=
cf=j= cf=j=
l;= g+= sfdbf/x?sf] lja/0f PsfO{ @)&४÷) @)&५÷)&६
&५
1 lgdf{0fsfdsf] nflu >lds -HofdL_ k|lt lbg 670.00 700.00
2 kmf]x/ 9n ;kmf ug]{ sfdbf/ k|lt lbg 750.00 1000.00
3 bIf -8sdL,{ l;sdL{, gsdL{, lrqsf/, jh|sdL{_, KnDa/, k|lt lbg 910.00 960.00
9'Ëf / sf7 a'§f sf6\g] ;fwf/0f d"lt{sf/ ,lrqsf/, cfl6{:6,
4 cw{bIf -8sdL{, l;sdL{, gsdL{_ ,lrqsf/, KnDa/,
k|lt lbg 750.00 790.00
On]S6«f]l;og, cf/fjfnf, h'lgo/ ;'k/efO{h/, gbL lg/LIfs,
5 cfbL . सपु रभाइजर
इन्जिनीयर, k|lt lbg 1080.00 1080.00
6 ;a OlGhlgo/, -8«fk\m6 d]g, cldg,
k|lt lbg 910.00 910.00
On]S6«Ll;og, ;e{]o/_, आदी .
7 l;lgo/ 6fO{lki6÷sDKo'6/ cप/]6/, cjfn, cflb . k|lt lbg 880.00 880.00
8 Nofj 6]lSgl;og, h'lgo/ 6fO{lki6÷सहायक sDKo'6/
k|lt lbg 800.00 800.00
cK/]6/, l;lgo/ ;'k/efO{h/, 9n ;kmf ug]{ sfdbf/, cflb .
9 cl;i6]06 ;a OlGhlgo/, 8«fˆ6d]g, सहायक cldg, h'lgo/
k|lt lbg 750.00 750.00
;'k/efO{h/ cflb .
10 x]eL OSo'Kd]G6M P:sfe]6/, /f]n/
ck|]6/,d]sflgS; ,x]eL e]lxsn 8«fOe/, 6«s k|lt lbg 980.00 980.00
8«fOe/, ;fwf/0f d]l;g cपरेटर, Nofj cl;:6]G6, cflb .
11 मेकानिक्स हेभी भेहिकल ड्राइभर ट्र क ड्राइभर साधारण मेसिन अपरेटर ल्याब असिस्टेन्ट आदि
k|lt lbg 700.00 700.00
8 :s/lkof] $ JxLn 8jn Sofj lksck ef8f O{Gwg / rfns ;d]t k|lt lbg 6000.00 6000.00
dfly pNn]v gePsf cGo ;j} kb÷>]l0fsf Hofnfbf/L sd{rf/L÷sfdbf/x?sf] xsdf ;+jlGwt kb÷>]l0fsf] nf
jf ;DalGwt ;+:yfgsf] k|rlnt tnj dfgnfO{ #) n] efu ubf{ x'g cfpg] /sdnfO{ b}lgs Hofnfb/ dfGg'kg]{ 5 .
3/ / hUuf ef8f tyf Ifltk"lt{÷d'cfJhf lgwf{/0f
3/ / hUuf ef8f tyf Ifltk"lt{÷d'cfJhf lgwf{/0f k|of]hgsf] nflu ljleGg k|sf/sf] 3/sf] agfj6 x]/L tklzn j
cf=j= cf=j=
@)&#÷) @)&$÷)&
l;= g+= 3/sf] agfj6 ljj/0f OsfO &$ sf] b/ % sf] b/ -?
(रु) _
1 ejgsf] lgdf{0f leq sfFrf], jflx/ kfsf] O{6fdf df6f]sf] a=km'= 1092.00 1267.00
२ hf]8fO{ eO{ 5fgf
ejgsf] lgdf{0f leq, h:tf,
jflx/ lem+u6L, 6fon,
kfsf] O{6fdf P;j];6;\ l;6 .
df6f]sf]
hf]8fO{ eO{ 5fgf h:tf, lem+u6L, 6fon, P;j];6;\ l;6 . a=km'= 1403.00 1629.00
5 cf/=lj=;L=÷
ejgsf] lgdf{0fcf/=l;=l;=
leq, jflx/.kfsf] O{6fdf jh|sf]
a=km'= 1602.00 1859.00
hf]8fO{ eO{ 5fgf h:tf, lem+u6L, 6fon, P;j];6;\ l;6 .
६ ejgsf] lgdf{0f leq, jflx/ kfsf] O{6fdf jh|sf] hf]8fO{ /
leq jflx/ l;d]06 Knfi6/ eO{ 5fgf h:tf, lem+u6L, 6fon, a=km'= 1742.00 2022.00
P;j];6;\ l;6 .
7 ejgsf] lgdf{0f leq, jflx/ kfsf] O{6fdf jh|sf] hf]8fO{ /
a=km'= 1813.00 2105.00
leq jflx/ l;d]06 Knfi6/ eO{ 5fgf
8 cf/=lj=;L=÷cf/=l;=l;=
ejgsf] lgdf{0f leq, jflx/. kfsf] O{6fdf l;d]06
hf]8fO{ eO{ 5fgf h:tf, lem+u6L, 6fon, P;j];6;\ l;6 . a=km'= 1756.00 2038.00
lng]_
28 kmnfdsf] xf]N8kmf:6 -& j6fsf] ! S]=lh=_ s]=hL= 125.00 125.00
29 ljleGg ;fOhsf] lsnf sf6L s]=hL= 112.00 112.00
30 ljleGg ;fOhsf] g6 jf]N6 s]=hL= 165.00 165.00
31 kmnfd] ;fdfu|Lsf] km]la|a]zg tyf h8fg sfo{ s]=hL= 46.00 45.00
32 Readymade Black Pipe Tubular Truss fitting & fixing work s]=hL= 196.00 140.00
Mild Steel Props for Concreting 2" dia 3.5 mm wall thickness
33
and 3.5 m- 4.0 m height uf]6f 1998.00 1940.00
23 ;au]|8df /fVg] df6f] -Capping layer Granular soil_ 3=ld= 464.00 510.00
24 e'; s]=lh= 5.15 5.50
25 uf]j/ s]=lh= 4.95 5.00
;fwf/0f
Plain j=lkm 233.00 235.00
e¥ofËsf] /]lnË tyf afb{nL cflbdf s'FlbPsf] ;L;f} /=lkm= 678.00 680.00
sf7sf] x]08 /]n (3"x4")
e¥ofËsf] /]lnËsf] 3'Dg] 7fpFdf s'FlbPsf] ;L;f} uf]6f 2984.00 2250.00
sf7sf] uf]nf] x]08 /]n (3"x4")
b]jL b]jtfsf] d'lt{ s'FlbPsf] $… b]lv %… nfdf] - uf]6f 9493.00 13500.00
#Æx *Æ_ ;fn sf7df 6'F8fn agfpg] sfd
b]jL b]jtfsf] d'lt{ s'FlbPsf] ^… b]lv &… nfdf] -
#Æx *Æ_ ;fn sf7df 6'F8fn agfpg] sfd uf]6f 10850.00 22500.00
;fdfGo k|sf/sf] s'FlbPsf] ;fnsf] sf7sf] cfFvL em\ofn j=lkm= 678.00 1350.00
tof/L
dWod k|sf/sf] s'FlbPsf] ;fnsf] sf7sf] cfFvL em\ofn j=lkm= 949.00 1620.00
tof/L
ljz]if k|sf/sf] s'FlbPsf] ;fnsf] sf7sf] cfFvL em\ofn
j=lkm= 2034.00 2250.00
tof/L ns ;xLt
ljz]if k|sf/sf] s'FlbPsf] ;fnsf] sf7sf] cfFvL em\ofn
j=lkm= 1288.00 1980.00
tof/L ns gePsf]
#Æx !=%Æ ;fOhsf] ;fnsf] sf7sf] s'FlbPsf] knL
tof/L ug]{ sfd /=lkm= 475.00 360.00
$Æx %Æsf] ;fn sf7sf] gfu a'§f sF'lb tof/L u/L h8fg
ug]{ sfo{ /=lkm= 678.00 1710.00
Readymade door shutter Recon, ordinary (1 side teak) j=lkm 174.00 174.00
Readymade door shutter Recon, Special (1 side teak) j=lkm 237.00 237.00
Readymade door shutter Recon, ordinary (1 side teak) j=lkm 199.00 199.00
Readymade door shutter Recon, Special (1 side teak) j=lkm 268.00 268.00
21 sf7sf] lnli6
1/2" wide /=lkm= 14.00 14.00
90 SERIES WINDOWS
1 Providing and fixing 2 or 3 Panel Sliding Window of aluminum
section in naturally anodized or Black anodized/powder coaded
color, Section size (87x56×1.20 mm) fitted with 5 mm clear glass Sq.ft. 542.00 529.00
without fly mesh shutter. (window size 6' x 5' or average area 30
sq. feet per window).
3 Providing and fixing 2 or 3 panel sliding window with top fix glass
of aluminum section in naturally anodized or black
anodized/powder coated color, Section size (87×65×1.20 mm) Sq.ft. 499.00 571.00
fitted with 5 mm clear glass with out fly mesh shutter. (window
size 6'x5' or average area 30 sq. feet per window).
4 Providing and fixing 2 or 3 panel sliding window with top fix glass
of aluminum section in naturally anodized or black
anodized/powder coated color, Section size (87x56×1.50 mm) Sq.ft. 645.00 658.00
fitted with 5 mm clear glass with out fly mesh shutter. (window
size 6'x5' or average area 30 sq. feet per window).
5 Providing and fixing Fixed Window of aluminum section in
naturally anodized or black anodized/powder coated color, Section
size (87x25+12×1.20 mm) fitted with 5 mm clear glass with out fly Sq.ft. 403.00 428.00
mesh shutter. (Average area 5 sq. feet per panel).
6 Providing and fixing Fixed Window of aluminum section in
naturally anodized or black anodized/powder coated color, Section
size (87x25+12×1.5 mm) fitted with 5 mm clear glass with out fly Sq.ft. 492.00 492.00
mesh shutter. (Average area 5 sq. feet per panel).
7 Providing and fixing Fly Mesh Shutter with stainless steel fly mesh
in 90 series for sliding window. (Section thickness 1 mm) Sq.ft. 140.00 188.00
64 SERIES PARTITION
1 Providing and fixing Full Height Partition of aluminum section in
naturally anodized or black anodized color Section size
(64x38x1.10 mm) fitted with 5 mm clear glass or 9 mm both side Sq.ft. 377.00 390.00
laminated board.(average panel area 8.00 Sq.ft).
2 Providing and fixing low height partition of aluminum section in
naturally anodized or black anodized color Section size
(64x38x1.10 mm) fitted with 5 mm clear glass or 9 mm both side Sq.ft. 469.00 478.00
laminated board.(average panel area 6.00 Sq.ft).
STRUCTURAL GLAZING
1 Providing and fixing Structural Glazing of aluminum section in
natural or color anodized/powder coated color Section size
(60x50+13x1.3 mm) fitted with 5 mm color glass. Sq.ft. 525.00 548.00
(average panel area 6.00 Sq.ft.)
2 Providing and fixing Structural Glazing of aluminum section in
natural or color anodized/powder coated color Section size
(60x75+13x1.6 mm) fitted with 5 mm color glass . Sq.ft. 609.00 636.00
(average panel area 6.00 Sq.ft.)
3 Providing and fixing Structural Glazing of aluminum section in
natural or color anodized/powder coated color Section size
(60x100+13x2 mm) fitted with 5 mm color glass . (average panel Sq.ft. 740.00 773.00
area 6.00 Sq.ft.)
3 UPVC Top Hung window (frame 60*60 mm, sash 60*78 mm, white
colour with 5mm glass) j=ld 7275.00 7493.00
4 UPVC Casement window (frame 60*60 mm, sash 60*78 mm, white
colour with 5mm glass) j=ld 7275.00 7493.00
5 UPVC Single Door with half panel half glass (frame 60*60 mm,
sash 60*104 mm, white colour with 5mm glass) j=ld 7975.00 8214.00
6 UPVC Single Door with full panel (frame 60*60 mm, sash 60*104
mm, white colour) j=ld 8085.00 8328.00
7 UPVC Double Door (frame 60*60 mm, sash 60*104 mm, white
colour with 5mm glass) j=ld 8625.00 8884.00
8 UPVC Sliding Door with net (frame 52*88 mm, sash 88*42 mm,
white colour with 5mm glass) j=ld 8625.00 8884.00
9 UPVC Sliding Door without net (frame 60*60 mm, sash 88*42 mm,
white colour with 5mm glass) j=ld 8355.00 8606.00
10 UPVC Swing Door with half glass half uPVC panel (frame 60*60
mm) j=ld 9700.00 9991.00
B Double glazing
1 UPVC Sliding window with net (frame 50*80 mm, sash 58*36 mm,
white colour with 5mm double glass) j=ld 9160.00 9435.00
2 UPVC Sliding window without net (frame 60*60 mm, sash 66*42
mm, white colour with 5mm double glass) j=ld 8675.00 8935.00
3 UPVC Top Hung window (frame 60*60 mm, sash 60*78 mm, white
colour with 5mm double glass) j=ld 9435.00 9718.00
4 UPVC Casement window (frame 60*60 mm, sash 60*78 mm, white
colour with 5mm double glass) j=ld 9435.00 9718.00
5 UPVC Single Door with half panel half glass (frame 60*60 mm,
sash 60*104 mm, white colour with 5mm double glass) j=ld 10135.00 10439.00
6 UPVC Double Door (frame 60*60 mm, sash 60*104 mm, white
colour with 5mm double glass) j=ld 10240.00 10547.00
7 UPVC Sliding Door with net (frame 52*88 mm, sash 88*42 mm,
white colour with 5mm double glass) j=ld 10780.00 11103.00
8 UPVC Sliding Door without net (frame 60*60 mm, sash 88*42 mm,
white colour with 5mm double glass) j=ld 10510.00 10825.00
9 Supply & fixing of 80*50 mm white colour casement window j=ld 9331.00 9611.00
6 PPB Both side lamination Melamined faced (Interiors Grade) 0.00 0.00
7 PPB One side lamination Melamined faced (Interior Grade) 0.00 0.00
Supplying and fixing 130 mm thick EVG 3D panel with mesh size 50
x 50 GI wire 3 mm both side 40 mm thick 1:4 cement sand plaster all
complete work.
j=lkm 400.00 412.00
Supplying and fixing 130 mm thick EVG 3D panel with mesh size 50
x 50 GI wire 4 mm both side 40 mm thick 1:4 cement sand plaster all
complete work.
j=lkm 494.00 509.00
Full Height Partition (With 8mm thick Fiber Cement Wall Board on
both side and 51mm G.I wall frame system) Interior Wall confirming
to IS 14862:2000 & Type A Category IV of ISO 8336:1993 j=lkm 236.00 243.08
Full Height Partition (With 9mm thick Fiber Cement Wall Board
exterior & 10mm Interior on interior side and 72mm G.I wall frame
system) Exterior cum Interior confirming to IS 14862:2000 & Type A j=lkm 301.00 310.03
Category IV of ISO 8336:1993
False Floor / Cavity Floor (With 15mm thick Heavy Duty Fiber
Cement / 20mm Standard FCB Floor Board and Specified M.S frame
system for design load) confirming to IS 14862 : 2000
j=lkm 338.00 348.14
2 High Range Water Reducing Super Plasticizer for Concrete & Mortar
[ Napthalene Formladehyde Based] ASTM C 494 -( Type A,C,E & F) IS s]=hL= 248.00 250.00
9103-79 /1999 Dose 0.2 to 3% by wt of cement .
3 Ultra High Range Water Reducing Super Plasticizer for Concrete &
Mortar [ Polycarboxylate Ether Based] ASTM C 494 -( Type A,F& G) IS s]=hL= 495.00 450.00
9103-1999 /1981
3 One Component Low Viscosity Primer For Polysulfide Sealant s]=hL= 3300.00 3000.00
4 Two Component Pour Grade Polyurethane Sealant for Joints s]=hL= 2200.00 2000.00
5 Low Viscosity Primer For Polyurethane Sealant s]=hL= 3300.00 3000.00
6 High Performance Hybrid Silyl Sealant (290 ml per set) ;]6 1320.00 1200.00
7 HOT APPLIED Bituminous Sealing Compound Sealent [TYPE A] s]=hL= 0.00 350.00
8 HOT APPLIED Bituminous Sealing Compound Sealent [TYPE B] s]=hL= 0.00 450.00
9 Butyl Tape for various Applications /= ld= 138.00 125.00
10 Waterproofing Joint Tape [ 120 mm] /= ld= 550.00 550.00
11 Waterproofing Joint Tape [ 200 mm] /= ld= 715.00 750.00
12 NBR based Waterproofing Joint Tape [ 200 mm] /= ld= 4400.00 4000.00
13 Joint Tape Epoxy Adhesive s]=hL= 3300.00 3000.00
14 Glass Fiber Joint Tape /= ld= 300.00 275.00
15 Waterproofing / Expansion Joint Tape [100 mm] /= ld= 1650.00 1500.00
16 Waterproofing / Expansion Joint Tape [200 mm] /= ld= 2970.00 2700.00
17 Construction Joint Tape [ 100 mm] /= ld= 880.00 800.00
18 Cross Linked Premoulded Compressive Joint Filler [25 mm] a= ld= 2695.00 2450.00
19 Cross Linked Premoulded Compressive Joint Filler [50 mm] a= ld= 5335.00 4850.00
20 Closed Cell Polymerbased Joint Filler [25 mm] a= ld= 880.00 800.00
21 Closed Cell Polymerbased Joint Filler [50 mm] a= ld= 1650.00 1500.00
22 Compressable Resilint Non- Extrudible Joint EXJO FILLER [12 mm {4'
X 4'}] a= ld= 0.00 2500.00
2
Ultra High Strength Free Flowing, Non Shrink Cementitious Grout [M60] s]=hL= 135.00 125.00
4 Two Component Epoxy Resin Bonding Agent [ For bonding new to old
concrete] s]=hL= 1980.00 1800.00
M PREFORMED 0.00
1 Fiber Reinforced Polymer Modified Bituminous Membranes [3mm
Plain] a= ld= 1980.00 1800.00
3 Polymer Modified Self Adhesive Bituminous Membranes [1mm] a= ld= 1100.00 1050.00
4 Polymer Modified Self Adhesive Bituminous Membranes [ 2mm] a= ld= 1650.00 1500.00
5 Polymer Modified Self Adhesive Bituminous Membranes with
Aluminium Cover a= ld= 1650.00 1500.00
d'=c=s/ afx]ssf] b/
cf=j=
l;=g+= lgdf{0f ;fdu|Lx?sf] ljj/0f PsfO{ cf=j=
२)&#÷&
२)&$÷&%
$
A STRUCTURAL STRENGTHENING
1 Carbon Laminate [50 mm Wide 1.4 mm Thick] /= ld= 8500.00
2 Carbon Laminate [75 mm Wide 1.4 mm Thick] /= ld= 10000.00
3
Fiber Reinforced Polymer] CARBON FiberWRAP Sheet 230 GSM a= ld= 8000.00
4
Fiber Reinforced Polymer] CARBON FiberWRAP Sheet 450 GSM a= ld= 12000.00
2 Expansion Joint for Inside Vertical Wall and Ceiling Area with 3mm
Different Aluminium Plates with Joint Gap from 5" to 8" /= ld= 8200.00
3 Expansion Joint for Inside Vertical Wall and Ceiling Area with 3mm
Different Aluminium Plates with Joint Gap from 9" to 12" /= ld= 9840.00
4 Expansion Joint for Inside Vertical Wall and Ceiling Area with 3mm
Different Aluminium Plates with Joint Gap from 13" to 18" /= ld= 13120.00
2 Expansion Joint for Outside Vertical Wall Area with 3mm Different
Aluminium Plates with Joint Gap from 5" to 8" /= ld= 9430.00
3 Expansion Joint for Outside Vertical Wall Area with 3mm Different
Aluminium Plates with Joint Gap from 9" to 12" /= ld= 11310.00
4 Expansion Joint for Outside Vertical Wall Area with 3mm Different
Aluminium Plates with Joint Gap from 13" to 18" /= ld= 15080.00
Security System
d'=c=s/ afx]ssf] b//]6
l;=g+= ;fdu|Lx?sf] ljj/0f PsfO{ cf=j= cf=j=
२)&#÷&$ २)&$÷&%
1 Steel Security Gate
Metal detector (black Scorpian Company) uf]6f 16995.00 16995.00
Access Controller (Taiwanese ) uf]6f 28840.00 28840.00
Access Controller (Chainese ) uf]6f 13905.00 13905.00
2 Steel Security Door 0.00
Single leaf :- 50 mm, 70 mm, 100mm a= ld= 8682.90 8683.00
Half leaf : - 50 mm, 70 mm, 100mm a= ld= 9930.23 9930.00
Double leaf : - 50 mm, 70 mm, 100mm a= ld= 10419.48 10419.00
3 Security System
i) Short range wireless intruder Alarm (including Host Unit-1,
PIR moton detector-1, Door Sensor-1, Remote Controller -2) uf]6f 34332.99 34333.00
iii) Access Controller with record using Card and Pin ( with
10 piece RFID Card.) uf]6f 20600.00 20600.00
4 CCTV System
Out door high speed Dome Integrated CAMERA Multi
Protocal ,480 TVL,128 preset points , automatic surveillance,360
degrees horizontal rotation , AC 240V power supply , integrated
heating system , highest angle speed 360 degree/ sec ,weather
resistance, water resistance, robust type.
9
af+;sf] sl6+u :6Dk la?jf-!% dlxg] g;{/Ldf /fv]sf]_ != प्रति कटिंग
% lkm6 b]lv @ lkm6 nfdf] 55.00 55.00
Vegitation/Shrubs Cuttings/Slip/Plants/etc.
1 cld|;f]-/fOhf]d_ k|lt la?jf 7.00 7.00
2 cn}+rL ufgf] k|lt la?jf 11.00 11.00
3 cn}+rL la?jf k|lt la?jf 8.00 8.00
4 xf8{p8 sl6Ë;\ -a}+;_ k]lG;n ;fOh k|lt la?jf 5.00 5.00
5 g]lko/ sl6Ë;\ k|lt la?jf 2.00 2.00
6 NB 21 3fF; k|lt la?jf 2.00 2.00
7 lgufnf] /fO{hf]d k|lt la?jf 50.00 50.00
8 af;sf] a]gf{ -s6Lu /fO{hf]d+_ k|lt la?jf 400.00 400.00
9 aflaof] tfOjfgL b'af] k|lt la?jf 3.00 3.00
10 l;hgn km'n * OGr kf]nL uf]6f 25.00 25.00
11 u'nfkm km''n * OGr kf]nL uf]6f 150.00 150.00
12 x]h * OGr kf]nL uf]6f 30.00 30.00
13 sfk]{6 b'af] j=kmL= 30.00 30.00
14 sfk]{6 b'af] sf] nfuL 5fKg] sfo{sf] Hofnf j=kmL= 20.00 20.00
15 lgufnf] -h/f ;xLt_ uf]6f 12.00 12.00
16 :YffgLo :t/df pTkfbLt la?jf kmnkm'n afx]s uf]6f 5.00 5.00
17 uf]7] dn tof/L s]=hL= 3.00 3.00
18 8fn] 3f;sf] la?jf uf]6f 6.00 6.00
19 df]nf6f] la/jf uf]6f 2.00 2.00
20 nf}7 ;Nnf g]kfnL uf]6f 70.00 70.00
21 nf}7 ;Nnf cd]l/sg uf]6f 120.00 120.00
22 v/ uf]6f
23 cDjf k|lt la?jf
24 plt; ,wo]/f],c;'/f],jsfOgf],lgd cfbL uf]6f
25 e'h]qf] s]=hL=
26 v/,km's]{ l;6f] cflbsf]] ljp s]=hL=
27 h'6 g]6 j=dL=
b l6Dj/ skf]{/]zgaf6 ;Dkfbg ul/g] sfo{x?
1 lr/fg pTkfbg-afsn,e'if,kmfNg] qm; sl6+u ;d]t_ So"=lkm=
2 lr/fg nf]8 So"=lkm=
3 lr/fg kfOln+u So"=lkm=
4 lr/fg cgnf]8 So"=lkm=
5 ldn l;kd]G6sf] uf]lnof cgnf]8 So"=lkm=
6 ef8fsf] ;Mldnaf6 uf]lnof lr/fg Hofnf-uf]lnofdf_ So"=lkm=
7 bfp/f nf]8 SjLG6n
8 bfp/f cgnf]8 SjLG6n
9 kf]n nf]8 k|lt uf]6f
10 kf]n cgnf]8 k|lt uf]6f
29 Road equipment
17 Grader Hr 1600
18 Roller Hr 700
asphalt paver Hr 1400
19 Vibrating roller Hr 800
Pneumatic roller Hr 1200
20 Water browser Hr 550
21 Loader Hr 1500
22 Sprayer Hr 1300
23 Air compressor Hr 250
24 Boiler Hr 180
25 Kerosene Lit 74
26 Bitumen Kg 68.4
30 Diesel Lit 100
31 Truck/Tripper Hr 450
32 Enamel paint Lit 509
33 100mm Dia. HDPE Pipe Rm 426
34 Heavy Duty GI pipe(dia 40mm) Rm 493
35 Dozer D50 hr 1800
36 Asphalt plant hr 500
7 Bitumen 80/100 kg 68.4
Hofnf b/ k|ltlbg ?=
cf=j= cf=j=
@)&६÷)७७ २०७७÷०७८
750.00 750.00
1070.00 1070.00
1030.00 1030.00
845.00 845.00
@@@@@ @@@@@
750.00 750.00
690.00 690.00
630.00 630.00
765.00 765.00
750.00 750.00
785.00 785.00
1070.00 1070.00
1100.00 1100.00
785.00 785.00
5500.00 5500.00
6600.00 6600.00
1710.00 1760.0
1902.00 1960.0
2001.00 2060.0
1952.00 2010.0
2123.00 2185.0
2210.00 2276.0
2140.00 2205.0
2216.00 2285.0
2340.00 2410.0
2048.00 2110.0
fs{;Ddsf] ;8s .
x]Gb| zflns;Ddsf] ;8s .
] l;dfgf;Ddsf] ;8s .
sf] ;8s .
L
d'=c=s/ afx]ssf] b//]6
cf=j= @)& cf=j=
%÷&^ @)&^÷&&
94.00 86.00
91.50 84.00
92.50 85.00
92.50 85.00
88.94 82.00
85.84 79.00 79000
88.94 82.00
94.15 86.00
101.77 92.00
70.00 70.00
81.42 81.42
81.00 81.00
83.19 83.19
82.30 82.30
139.10 139.10
139.10
107.00 105.00
107.00 105.00
107.00 105.00
102.00 100.00
102.00 100.00
103.00 100.00
97.00 95.00
97.00 95.00
98.00 95.00
220.00 231.00
266.00 280.00
435.00 457.00
287.75 302.00
259.09 272.00
97.35 97.35
0.75 0.75
697.00 967.00
652.00 652.00
517.00 517.00
423.00 423.00
337.00 337.00
116.00 116.00
121.00 121.00
74.00 74.00
189.00 189.00
152.00 152.00
263.00 263.00
130.00 130.00
120.00 120.00
500.00 500.00
350.00 350.00
280.00 280.00
500.00 500.00
650.00 650.00
3050.00 2874.00
125.00 125.00
112.00 112.00
165.00 165.00
45.00 45.00
140.00 140.00
1940.00 1940.00
194.00 194.00
243.00 243.00
310.00 310.00
376.00 376.00
508.00 508.00
328.02 322.50
30.00 31.50
165.00 173.00
182.00 191.00
150.00 157.00
21247.00 23107.00
47077.00 49032.00
9316.00 9650.00
18716.00 19230.00
175000.00 175000.00
175000.00 175000.00
634.00 634.00
1265.00 1265.00
72.00 72.00
80.00 80.00
117.00 117.00
360.00 360.00
148820.00 148820.00
9950.00 9950.00
1650.00 1650.00
3135.00 3135.00
190000.00 190000.00
6000.00 6000.00
10500.00 10500.00
74.00 74.00
372.00 372.00
637.00 637.00
1273.00 1273.00
1591.00 1591.00
424.00 424.00
6695.00 6695.00
290.00 290.00
380.00 380.00
350.00 350.00
48.00 48.00
d'=c=s= afx]ssf] b//]6
cf=j= @)& cf=j=
%÷&^ @)&^÷&&
16880.00 16880.00
16720.00 16720.00
2500.00 2500.00
15450.00 15450.00
16274.00 16274.00
37.00 37.00
32.00 32.00
50.00 50.00
162.00 162.00
299.00 299.00
114.00 114.00
171.00 171.00
228.00 228.00
121.00 127.00
181.00 190.00
244.00 256.00
0.00 35.313378
0.00
83.00 83.00
18.00 18.00
16.00 16.00
32.00 32.00
26.00 26.00
10.00 10.00
9.00 9.00
76.00 76.00
88.00 88.00
103.00 103.00
111.00 111.00
138.00 138.00
105.00 105.00
65.00 65.00
45.36 45.36
41.04 41.04
318.60 318.60
550.80 550.80
5.50 5.50
5.00 5.00
0.26 0.26
0.31 0.31
31.00 31.00
2355.00 2355.00
210.00 210.00
l/ªx?
d'=c=s/ afx]ssf] b//]6
cf=j=@)&
@)&^÷&&
%÷&^
543.00 570.00
705.00 740.00
883.00 925.00
1198.00 1260.00
1323.00 1325.00
1449.00 1520.00
1666.00 1750.00
1764.00 1852.00
1979.00 2080.00
2610.00 2740.00
3406.00 3575.00
3684.00 3870.00
4112.00 4320.00
5556.00 5835.00
6482.00 6805.00
7906.00 8301.00
16620.00 17450.00
1248.00 1310.00
1663.00 1745.00
2079.00 2185.00
2988.00 3140.00
3352.00 3520.00
3583.00 3760.00
3819.00 4010.00
4287.00 4500.00
4779.00 5020.00
5905.00 6200.00
7130.00 7485.00
8190.00 8600.00
8938.00 9385.00
11593.00 12172.00
12881.00 13525.00
15332.00 16100.00
24092.00 25300.00
139.00 145.00
184.00 193.00
228.00 239.00
309.00 324.00
340.00 357.00
374.00 392.00
430.00 451.00
454.00 476.00
510.00 535.00
673.00 706.00
877.00 920.00
948.00 995.00
1058.00 1110.00
1430.00 1500.00
1669.00 1752.00
2036.00 2137.00
4279.00 4492.00
312.00 327.00
416.00 436.00
519.00 544.00
746.00 783.00
838.00 879.00
895.00 940.00
954.00 1000.00
1072.00 1125.00
1196.00 1255.00
1477.00 1550.00
1782.00 1871.00
2047.00 2150.00
2233.00 2344.00
2898.00 3042.00
3221.00 3382.00
3833.00 4024.00
6023.00 6324.00
1410.00 1480.00
1914.00 2010.00
2390.00 2510.00
3435.00 3605.00
4392.00 4610.00
4931.00 5180.00
5496.00 5770.00
6791.00 7130.00
8200.00 8610.00
10278.00 10790.00
13334.00 14000.00
14814.00 14814.00
18600.00
;fdfu|L
d'=c=s= afx]ssf] b//]6
13000.00 13650.00
14000.00 14700.00
14500.00 15225.00
15500.00 16275.00
16300.00 17115.00
17600 18382.00
19000 19950.00
1200.00 1200.00
1050.00 1050.00
950.00 950.00
49.00 49.00
56.00 56.00
65.00 65.00
75.00 75.00
100.00 100.00
150.00 150.00
190.00 190.00
220.00 220.00
48.41 48.41
56.65 56.65
154.50 154.50
96.00 96.00
103.00 103.00
120.00 120.00
180.00 180.00
250.00 250.00
350.00 350.00
400.00 400.00
116.00 116.00
6200.00 6200.00
184.00 184.00
238.00 238.00
285.00 285.00
393.00 393.00
161.00 161.00
23.00 23.00
35.00 35.00
60.00 60.00
160.00 168.00
175.00 184.00
250.00 262.00
335.00 352.00
376.00 395.00
142.00 150.00
130.00 137.00
126.00 126.00
85.00 85.00
54.00 54.00
43.00 43.00
180.00 180.00
150.00 150.00
165.00 165.00
144.00 144.00
106.00 106.00
111.00 111.00
98.00 98.00
88.00 88.00
77.00 77.00
129.00 129.00
134.00 134.00
103.00 103.00
623.00 623.00
75.00 75.00
87.00 87.00
107.00 107.00
87.00 87.00
22.00 22.00
{0f ;fdfu|Lx?
d'=c=s/ afx]ssf] b//]6
cf=j= २)& cf=j=
%÷&6 २)&^÷&&
70000.00 70000.00
105000.00 105000.00
240000.00 240000.00
800.00 800.00
900.00 900.00
3700.00 3700.00
40000.00 40000.00
2720.00 2720.00
1900.00 1900.00
950.00 950.00
1360.00 1360.00
2450.00 2450.00
2990.00 2990.00
1360.00 1360.00
1155.00 1155.00
25.00 25.00
35.00 35.00
27.00 27.00
27.00 27.00
320.00 320.00
53.00 53.00
158.00 158.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
132.00 132.00
70.00 70.00
27.00 27.00
40.00 40.00
132.00 132.00
70.00 70.00
27.00 27.00
40.00 40.00
530.00 530.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
32.00 32.00
32.00 32.00
32.00 32.00
32.00 32.00
32.00 32.00
32.00 32.00
27.00 27.00
40.00 40.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
32.00 32.00
32.00 32.00
32.00 32.00
42.00 42.00
42.00 42.00
53.00 53.00
42.00 42.00
53.00 53.00
53.00 53.00
53.00 53.00
27.00 27.00
40.00 40.00
53.00 53.00
105.00 105.00
105.00 105.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
60.00 60.00
53.00 53.00
69.00 69.00
105.00 105.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
500.00 500.00
1896.00 1896.00
22.00 22.00
35.00 35.00
25.00 25.00
37.00 37.00
27.00 27.00
40.00 40.00
37.00 37.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
32.00 32.00
40.00 40.00
27.00 27.00
40.00 40.00
27.00 27.00
40.00 40.00
40.00 40.00
27.00 27.00
40.00 40.00
40.00 40.00
63.00 63.00
63.00 63.00
63.00 63.00
63.00 63.00
105.00 105.00
27.00 27.00
40.00 40.00
27.00 27.00
69.00 69.00
27.00 27.00
40.00 40.00
27.00 27.00
10.00 10.00
75.00 75.00
75.00 75.00
19.00 19.00
25.00 25.00
27.00 27.00
35.00 35.00
150.00 150.00
250.00 250.00
300.00 300.00
22.00 22.00
1155.00 1155.00
1155.00 1155.00
2000.00 2000.00
3000.00 3000.00
173.00 173.00
14.00 14.00
8.00 8.00
23.00 23.00
1350.00 1350.00
1025.00 1025.00
300.00 300.00
1386.00 1386.00
476.00 476.00
;fdfu|L
d'=c=s/ afx]ssf] b//]6
cf=j= @)& cf=j=
%÷&^ @)&^÷&&
5600.00 5600.00 197736
5800.00 5800.00 204798
6250.00 6250.00 220687.5
6600.00 6600.00 233046
3350.00 3350.00 118288.5
2150.00 2150.00 75916.5
1550.00 1550.00 54730.5
3500.00 3500.00 123585
5270.00 5270.00 186083.7
625.00 625.00 22068.75 50905.25
18.00 18.00 635.58
235.00 235.0
280.00 280.0
325.00 325.0
245.00 245.0
288.00 288.0
333.00 333.0
1080.00 1080.00
1260.00 1260.00
680.00 680.00
2250.00 2250.00
13500.00 13500.00
22500.00 22500.00
3150.00 3150.00
7280.00 7280.00
1350.00 1350.00
1620.00 1620.00
2250.00 2250.00
1980.00 1980.00
360.00 360.00
1620.00 1620.00
1710.00 1710.00
220.00 220.00
560.00 560.00
36.00 36.00
26.00 26.00
26.00 26.00
53.00 53.00
57.00 57.00
80.00 80.00
48.00 48.00
69.00 69.00
60.00 60.00
43.00 43.00
49.00 49.00
39.00 39.00
46.00 46.00
37.00 37.00
17.00 17.00
75.00 75.00
44.00 44.00
126.00 126.00
160.00 160.00
140.00 140.00
173.00 173.00
153.00 153.00
187.00 187.00
165.00 165.00
200.00 200.00
187.00 187.00
221.00 221.00
174.00 174.00
237.00 237.00
199.00 199.00
268.00 268.00
14.00 14.00
16.00 16.00
27.00 27.00
38.00 38.00
380.00 380.00
380.00 380.00
2227.00 2227.00
300.00 300.00
1800.00 1800.00
ws
657.00 657.00
723.00 723.00
836.00 836.00
920.00 920.00
529.00 529.00
604.00 604.00
571.00 571.00
658.00 658.00
428.00 428.00
492.00 492.00
188.00 188.00
519.00 519.00
563.00 563.00
390.00 390.00
478.00 478.00
548.00 548.00
636.00 636.00
773.00 773.00
1259.00 1259.00
817.00 817.00
1354.00 1354.00
333.00 333.00
447.00 447.00
w
d'=c=s/ afx]ssf] b//]6
6664.00 6664.00
7493.00 7493.00
7493.00 7493.00
8214.00 8214.00
8328.00 8328.00
8884.00 8884.00
8884.00 8884.00
8606.00 8606.00
9991.00 9991.00
8626.00 8626.00
9796.00 9796.00
10353.00 10353.00
10717.00 10717.00
6727.00 6727.00
9435.00 9435.00
8935.00 8935.00
9718.00 9718.00
9718.00 9718.00
10439.00 10439.00
10547.00 10547.00
11103.00 11103.00
10825.00 10825.00
9611.00 9611.00
4690 4707.96
5133 5141.59
5522 5522.12
5841 5840.71
6159 6185.84
6779 6734.51
7522 7460.18
7885 8097.35
8708 8619.47
9460 9407.08
10469 10398.23
10841 11336.28
15513 15415.93
5796 5858.41
6195 6265.49
6584 6707.96
6973 7061.95
7336 7433.63
7956 7982.30
8823 8831.86
9265 9451.33
10133 10079.65
10912 10929.20
11920 11938.05
12354 12380.53
12947 12964.60
17389 17415.93
4690 4707.96
5088 5106.19
5487 5486.73
5796 5805.31
6115 6141.59
6726 6681.42
7478 7407.08
7841 8035.40
8655 8566.37
9416 9362.83
10416 10345.13
10788 10716.81
15513 15415.93
1602 1601.77
1735 1743.36
1867 1867.26
1973 1973.45
2080 2088.50
2283 2265.49
2531 2513.27
2655 2716.81
2920 2893.81
0
3274 3265.49
2708 2699.12
2442 2433.63
2292 2283.19
2142 2132.74
1912 1911.50
1717 1707.96
1566 1557.52
1496 1495.58
1416 1415.93
1336 1327.43
1274 1265.49
1186 1176.99
1133 1132.74
982 991.15
920 929.20
0
2973 2982.30
2699 2707.96
2531 2539.82
2434 2433.63
2177 2176.99
1956 1955.75
1788 1787.61
1708 1716.81
1619 1619.47
1513 1513.27
1487 1486.73
1389 1389.38
1327 1327.43
1168 1176.99
1106 1115.04
159 159.29
212 212.39
133 132.74
177 176.99
124 123.89
159 159.29
1506.00 1506.00
1200.00 1200.00
1925.00 1925.00
1925.00 1925.00
26.00 26.00
30.00 30.00
20.00 20.00
11.00 11.00
8.50 8.50
66.37 66.37
745.13 745.13
447.79 447.79
101.77 101.77
110.62 110.62
1343.36 1343.36
745.13 745.13
996.46 996.46
8.85 8.85
29 29.00
27 27.00
115.00 115.00
127.00 127.00
127.00 127.00
146.00 146.00
216.00 216.00
255.00 255.00
293.00 293.00
382.00 382.00
1076.00 1076.00
1550.00 1550.00
20.00 20.00
67.00 67.00
7.00 7.00
137.00 137.00
7.00 7.00
10.00 10.00
38.00 38.00
43.00 43.00
55.00 55.00
74.00 74.00
77.00 77.00
86.00 86.00
102.00 102.00
132.00 132.00
0.00 0.00
86.00 86.00
99.00 99.00
114.00 114.00
145.00 145.00
0.00 0.00
28.00 28.00
32.00 32.00
48.00 48.00
61.00 61.00
0.00 0.00
42.00 42.00
59.00 59.00
68.00 68.00
77.00 77.00
89.00 89.00
111.00 111.00
0.00 0.00
48.00 48.00
64.00 64.00
77.00 77.00
0.00 0.00
48.00 48.00
55.00 55.00
68.00 68.00
88.00 88.00
99.00 99.00
127.00 127.00
176.00 176.00
0.00 0.00
55.00 55.00
61.00 61.00
76.00 76.00
95.00 95.00
105.00 105.00
133.00 133.00
180.00 180.00
0.00 0.00
175.00 175.00
280.00 280.00
423.00 423.00
0.00 0.00
84.00 84.00
120.00 120.00
221.00 221.00
305.00 305.00
370.00 370.00
553.00 553.00
713.00 713.00
380.00 380.00
540.00 540.00
575.00 575.00
168.00 168.00
319.00 319.00
444.00 444.00
0.00 0.00
124.00 124.00
82.00 82.00
83.00 83.00
26.00 26.00
28.00 28.00
32.00 32.00
33.00 33.00
47.00 47.00
63.00 63.00
71.00 71.00
80.00 80.00
89.00 89.00
0.00 0.00
32.00 32.00
50.00 50.00
68.00 68.00
6370.00 6370.00
90.00 90.00
n
d'=c=s/ afx]ssf] b//]6
302.00 302.00
239.00 239.00
0.00 0.00
93.00 93.00
279.00 279.00
244.00 244.00
311.00 311.00
274.00 274.00
217.00 217.00
288.00 288.00
35.00 35.00
34.00 34.00
42.00 42.00
53.00 53.00
64.00 64.00
393.00 393.00
424.00 424.00
524.00 524.00
112.00 112.00
263.00 263.00
347.00 347.00
282.00 282.00
286.00 286.00
250.00 250.00
319.00 319.00
359.00 359.00
200.00 200.00
275.00 275.00
330.00 330.00
385.00 385.00
465.00 465.00
50 50.00
S;r/x?
15.00 15.00
28.00 28.00
43.00 43.00
56.00 56.00
260.00 260.00
227.00 227.00
195.00 195.00
20.00 20.00
40.00 40.00
67.00 67.00
80.00 80.00
94.00 94.00
107.00 107.00
32.00 32.00
47.00 47.00
63.00 63.00
71.00 71.00
87.00 87.00
71.00 71.00
79.00 79.00
87.00 87.00
189.00 189.00
284.00 284.00
379.00 379.00
458.00 458.00
142.00 142.00
189.00 189.00
284.00 284.00
379.00 379.00
473.00 473.00
568.00 568.00
150.00 150.00
458.00 458.00
947.00 947.00
947.00 947.00
1562.00 1562.00
1735.00 1735.00
1062.00 1062.00
1199.00 1199.00
1249.00 1249.00
1249.00 1249.00
225.00 225.00
300.00 300.00
375.00 375.00
892.00 892.00
1130.00 1130.00
1249.00 1249.00
250.00 250.00
375.00 375.00
625.00 625.00
416.00 416.00
2557.00 2557.00
1130.00 1130.00
178.00 178.00
1874.00 1874.00
18.00 18.00
31.00 31.00
35.00 35.00
42.00 42.00
75.00 75.00
0.00 0.00
148.00 148.00
196.00 196.00
425.00 425.00
406.00 406.00
874.00 874.00
100.00 100.00
178.00 178.00
1.92 1.92
2.67 2.67
4.11 4.11
12.06 12.06
15.08 15.08
1.17 1.17
1.92 1.92
2.33 2.33
7.20 7.20
7.54 7.54
92.70 92.70
97.85 97.85
x?
d'=c=s/ afx]ssf] b//]6
cf=j= २)& cf=j=
%÷&^ २)&^÷&&
65.00 65.00
271.00 271.00
365.00 365.00
509.00 509.00
491.00 491.00
462.00 462.00
530.00 530.00
427.00 427.00
330.00 330.00
224.00 224.00
128.00 128.00
151.00 151.00
197.00 197.00
211.00 211.00
208.00 208.00
254.00 254.00
222.00 222.00
466.00 466.00
54.00 54.00
133.00 133.00
1280.00 1280.00
87.00 87.00
217.00 217.00
511.00 511.00
612.00 612.00
650.00 650.00
683.00 683.00
562.00 562.00
191.00 191.00
114.00 114.00
255.00 255.00
345.00 345.00
118.00 118.00
70.00 70.00
140.00 140.00
210.00 210.00
280.00 280.00
400.00 400.00
6.00 6.00
36.00 36.00
60.00 60.00
22.00 22.00
450.00 450.00
1238.00 1238.00
11706.00 11706.00
1099.00 1099.00
762.00 762.00
0.00 0.00
176.00 176.00
1639.00 1639.00
4305.00 4305.00
412.00 412.00
121.00 121.00
921.00 921.00
149.00 149.00
199.00 199.00
199.00 199.00
199.00 199.00
238.00 238.00
238.00 238.00
174.00 174.00
237.00 237.00
264.00 264.00
1267.00 1267.00
728.00 728.00
2631.00 2631.00
107.00 107.00
165.00 165.00
159.00 159.00
189.00 189.00
412.00 412.00
181.00 181.00
139.00 139.00
215.00 215.00
239.00 239.00
503.00 503.00
588.00 588.00
322.00 322.00
510.00 510.00
238.00 238.00
0.00
522.00 522.00
280.00 280.00
772.00 772.00
172.00 172.00
142.00 142.00
512.00 512.00
313.00 313.00
276.00 276.00
0.00 0.00
387.00 387.00
170.00 170.00
0.00
466.00 466.00
619.00 619.00
39.00 39.00
0.00
128.00 128.00
195.00 195.00
167.00 167.00
133.00 133.00
140.00 140.00
120.00 120.00
156.00 156.00
65.00 65.00
74.00 74.00
99.00 99.00
93.00 93.00
103.00 103.00
90.00 90.00
90.00 90.00
112.00 112.00
112.00 112.00
154.00 154.00
116.00 116.00
107.00 107.00
98.00 98.00
124.00 124.00
135.00 135.00
54.00 54.00
38.00 38.00
34.00 34.00
0.00
23.00 23.00
21.00 21.00
17.00 17.00
31.00 31.00
24.00 24.00
20.00 20.00
16.00 16.00
11.00 11.00
18.00 18.00
1236.00 1236.00
7.00 7.00
108.00 108.00
32.4333333333333 32.43
ent works
d'=c=s/ afx]ssf] b/
cf=j= २)& cf=j=
%÷&^ २)&^÷&&
100.00 100.00
350.00 350.00
2000.00 2000.00
235.00 235.00
350.00 350.00
450.00 450.00
150.00 150.00
250.00 250.00
450.00 450.00
300.00 300.00
1000.00 1000.00
1000.00 1000.00
1250.00 1250.00
180.00 180.00
250.00 250.00
350.00 350.00
350.00 350.00
250.00 250.00
450.00 450.00
330.00 330.00
110.00 110.00
85.00 85.00
1800.00 1800.00
1800.00 1800.00
3000.00 3000.00
2000.00 2000.00
3000.00 3000.00
1200.00 1200.00
350.00 350.00
450.00 450.00
125.00 125.00
550.00 550.00
750.00 750.00
4000.00 4000.00
3000.00 3000.00
275.00 275.00
1500.00 1500.00
2700.00 2700.00
800.00 800.00
2450.00 2450.00
4850.00 4850.00
800.00 800.00
1500.00 1500.00
2500.00 2500.00
3500.00 3500.00
4500.00 4500.00
120.00 120.00
450.00 450.00
2500.00 2500.00
3000.00 3000.00
2000.00 2000.00
2200.00 2200.00
3000.00 3000.00
500.00 500.00
110.00 110.00
125.00 125.00
160.00 160.00
1000.00 1000.00
500.00 500.00
2500.00 2500.00
4500.00 4500.00
7500.00 7500.00
12500.00 12500.00
8500.00 8500.00
14000.00 14000.00
9500.00 9500.00
130.00 130.00
60.00 60.00
250.00 250.00
750.00 750.00
950.00 950.00
1200.00 1200.00
1800.00 1800.00
1200.00 1200.00
1500.00 1500.00
2000.00 2000.00
250.00 250.00
350.00 350.00
250.00 250.00
1200.00 1200.00
1350.00 1350.00
4500.00 4500.00
1500.00 1500.00
1800.00 1800.00
1500.00 1500.00
900.00 900.00
500.00 500.00
500.00 500.00
450.00 450.00
1000.00 1000.00
1200.00 1200.00
140.00 140.00
175.00 175.00
250.00 250.00
200.00 200.00
1200.00 1200.00
85.00 85.00
350.00 350.00
85.00 85.00
85.00 85.00
90.00 90.00
275.00 275.00
7500.00 7500.00
700.00 700.00
500.00 500.00
750.00 750.00
850.00 850.00
750.00 750.00
350.00 350.00
400.00 400.00
1650.00 1650.00
1250.00 1250.00
600.00 600.00
1800.00 1800.00
2000.00 2000.00
1050.00 1050.00
1500.00 1500.00
1500.00 1500.00
2000.00 2000.00
2500.00 2500.00
2500.00 2500.00
2500.00 2500.00
3000.00 3000.00
3500.00 3500.00
800.00 800.00
4500.00 4500.00
550.00 550.00
225.00 225.00
525.00 525.00
650.00 650.00
1250.00 1250.00
1000.00 1000.00
750.00 750.00
1000.00 1000.00
12000.00 12000.00
2500.00 2500.00
7500.00 7500.00
2500.00 2500.00
2500.00 2500.00
2500.00 2500.00
110.00 110.00
2800.00 2800.00
3500.00 3500.00
TROFITTING
d'=c=s/ afx]ssf] b/
cf=j= २)& cf=j=
%÷&^ २)&^÷&&
8500.00 8500.00
10000.00 10000.00
8000.00 8000.00
12000.00 12000.00
16000.00 16000.00
12000.00 12000.00
3500.00 3500.00
3500.00 3500.00
2500.00 2500.00
3500.00 3500.00
4500.00 4500.00
2500.00 2500.00
3500.00 3500.00
10000.00 10000.00
12000.00 12000.00
10490.00 10490.00
12460.00 12460.00
14760.00 14760.00
19680.00 19680.00
18040.00 18040.00
12580.00 12580.00
14955.00 14955.00
17710.00 17710.00
23615.00 23615.00
6560.00 6560.00
8200.00 8200.00
9840.00 9840.00
13120.00 13120.00
7540.00 7540.00
9430.00 9430.00
11310.00 11310.00
1020.00 1051.00
39.00 40.00
41.00 42.00
47.00 48.00
48.00 49.00
49.00 50.00
50.00 52.00
57.00 59.00
0.00
9.00 10.00
21.00 22.00
23.00 24.00
29.00 30.00
32.00 33.00
14.00 15.00
15.00 16.00
73.00 75.00
64.00 66.00
82.00 84.00
82.00 84.00
18.00 19.00
12.00 12.00
37.00 38.00
32.00 33.00
50.00 52.00
162.00 167.00
299.00 308.00
114.00 117.00
171.00 176.00
228.00 235.00
2278
2827
3466
1684
2118
2573
1829
2323
2818
1589
1852
1082
1298
1684
16995.00 16995.00
28840.00 28840.00
13905.00 13905.00
0.00 0.00
8683.00 8683.00
9930.00 9930.00
10419.00 10419.00
34333.00 34333.00
20600.00 20600.00
12875.00 12875.00
36050.00 36050.00
36050.00 36050.00
56650.00 56650.00
58916.00 58916.00
54384.00 54384.00
56650.00 56650.00
15450.00 15450.00
8364.00 8364.00
33990.00 33990.00
50985.00 50985.00
10815.00 10815.00
GINEERING
30000.00 30000.00
40000.00 40000.00
30000.00 30000.00
50000.00 50000.00
10000.00 10000.00
5000.00 5000.00
10000.00 10000.00
2000.00 2000.00
2000.00 2000.00
2000.00 2000.00
2500.00 2500.00
?jfx?
385.00 385.00
140.00 140.00
155.00 155.00
240.00 240.00
30.00 30.00
20.00 20.00
4000.00 4000.00
2000.00 2000.00
4500.00 4500.00
140.00 140.00
2000.00 2000.00
28.00 28.00
30.00 30.00
880.00 880.00
1250.00 1250.00
1540.00 1540.00
1870.00 1870.00
770.00 770.00
950.00 950.00
660.00 660.00
660.00 660.00
660.00 660.00
440.00 440.00
440.00 440.00
495.00 495.00
660.00 660.00
660.00 660.00
1320.00 1320.00
1100.00 1100.00
1320.00 1320.00
1320.00 1320.00
1200.00 1200.00
1200.00 1200.00
1300.00 1300.00
75.00 75.00
150.00 150.00
3.00 3.00
175.00 175.00
0.50 0.50
1.00 1.00
12.00 12.00
350.00 350.00
55.00 55.00
7.00 7.00
11.00 11.00
8.00 8.00
5.00 5.00
2.00 2.00
2.00 2.00
50.00 50.00
400.00 400.00
3.00 3.00
25.00 25.00
150.00 150.00
30.00 30.00
30.00 30.00
20.00 20.00
12.00 12.00
5.00 5.00
3.00 3.00
6.00 6.00
2.00 2.00
70.00 70.00
120.00 120.00
4 4.00
450 450
410 410
1550 1550
1450 1450
485 485
65 65
17 17
8 8
9 9
11 11
90 90
50 50
17 17
60 60
30 30
Roller 1102.5
Grder 1649.34
kerosene 100
diesel 100
petrol 113
sparayer 1821.75
jute 76
Fuel
cosumtion Fuel
charge cosumtion
Hire Rate Amount charge ltr
1270.00 hr. 800.00 470.00 4.70 100.00
1670.00 hr. 1200.00 470.00 4.70 100.00
1050.00 hr. 450 600.00 6 100.00
2800.00 hr. 1800 1000.00 10 100.00
0.00 lt 100.00 0.00 100.00
1405.00 hr. 550 855.00 8.55 100.00
2500.00 hr. 1500 1000.00 10 100.00
2020.00 hr. 1600 420.00 4.2 100.00
900.00 800 100.00 1 100.00
880.00 hr. 180.00 700.00 7.00 100.00
1800.00 hr. 1300.00 500.00 5.00 100.00
589.00 hr. 250.00 339.00 3.00 113.00
1388.00 hr. 500.00 888.00 8.88 100.00
2150.00 hr. 1400.00 750.00 7.50 100.00
0.00 kg
Analysis of Rates for Road Works ( F.Y. 2076/077 )
Item No 1 SITE CLEARANCE
A ) Description : Site clearance- Clearing and grubbing including the cutting of trees ( only if necessary ) having girth of less than 30 cm when measured at 1 m above the ground.
Unit : 1 sq m
Respective Dolidar Labour (A) Material(B) Equipment ( c )
Clause of Norms Rate (Nrs) Amount Amount Rate Amount
Specifications n. Category Unit Qty. (Nrs) Type Unit Qty. Rate (Nrs) (Nrs) Type Unit Qty. (Nrs) (Nrs) Remarks
1-1.5(a) 1
1-1.5(b) Unskilled person-day 0.04 750.00 30.00
1-1.6
Total Labour Component ( A ) 30.00 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 30.00
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 4.50
Total Cost: Nrs. 34.50
Rate : Nrs. 34.50 Per Sq.m.
B) Description : Surface dressing work including filling pot hole and cutting topsoil with levelling work for service road etc
Unit : 1 sq m
Respective Dor Labour (A) Material(B) Equipment ( c )
Clause of Norms Rate (Nrs) Amount Amount Rate Amount
Specifications n. Category Unit Qty. (Nrs) Type Unit Qty. Rate (Nrs) (Nrs) Type Unit Qty. (Nrs) (Nrs) Remarks
1.7
Unskilled person-day 0.01 750.00 7.50
Total Labour Component ( A ) 7.50 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 7.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 1.13
Total Cost: Nrs. 8.63 Rate : Nrs. 8.63 Per Sq.m.
C) Description : Stripping of top soil work for minimum depth of 150 mm including storing or reapplication within a lead up to 100 m along the lead route
Unit : 1 cu m
Respective Dolidar Labour (A) Material(B) Equipment ( c )
Clause of Norms Rate (Nrs) Amount Amount Rate Amount
Specifications n. Category Unit Qty. (Nrs) Type Unit Qty. Rate (Nrs) (Nrs) Type Unit Qty. (Nrs) (Nrs) Remarks
4
Unskilled person-day 0.80 750.00 600.00
Total Labour Component ( A ) 600.00 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 600.00
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 90.00
Total Cost: Nrs. 690.00 Rate : Nrs. 690.00 Per Cu M
1
Item No 2 EXCAVATION WORK
2.1 Excavation in road and drain
Description : Exacavation in roadways and drain including removal and satisfactory disposal of all materials of 50 m along the lead route. This includes
handling and stacking or hauling ( to sites of embankment construction) suitable cut materials and also the disposal of unsuitable cut materials in specified manner . This further
covers trimming and finishing of roadway .
A) Ordinary Soil
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount
of Specifications n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) (Nrs) Remarks
2-1.2.2 5.a
2-1.8 Unskilled person-day 0.50 750.00 375.00
2-1.9
T and P @ 3% of Labour Cost 11.25
Total Labour Component ( A ) 386.25 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 386.25
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 57.94
Total Cost: Nrs. 444.19 Rate : Nrs. 444.19 Per Cu M
(B) Hard Soil
Respective Labour (A) Material(B) Equipment ( c )
Clause of Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount
Specifications Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) (Nrs) Remarks
Respective Dolidar Labour (A) Material(B) Equipment ( c )
Clause of Norms Rate (Nrs) Amount(Nr Rate (Nrs) Amount Rate Amount(Nrs
Specifications n. Category Unit Qty. s) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) ) Remarks
2-1.2.2 5.b
2-1.8 Unskilled person-day 0.60 750.00 450.00
2-1.9
T and P @ 3% of Labour Cost 13.50
Total Labour Component ( A ) 463.50 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 463.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 69.53
Total Cost: Nrs. 533.03 Rate : Nrs. 533.03 Per Cu M
Unit : 1 Cu m
C) Ordinary Rock
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount
Specifications n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
(Nrs) (Nrs) (Nrs) (Nrs)
2-1.2.2
2-1.8 5.c Unskilled person-day 2.00 750.00 1500.00
2-1.9
T and P @ 3% of Labour Cost 45.00
Total Labour Component ( A ) 1545.00 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 1545.00
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 231.75
Total Cost: Nrs. 1776.75 Rate : Nrs. 1776.75 Per Cu M
2
D) Marshy soil
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
2-1.2.2 5.f
2-1.8 Unskilled person-day 1.00 750.00 750.00
2-1.9
T and P @ 3% of Labour Cost 22.50
Total Labour Component ( A ) 772.50 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 772.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 115.88
Total Cost: Nrs. 888.38
Rate : Nrs. 888.38 Per Cu M
Description : Exacavation in roadways and drain including removal and satisfactory disposal of all materials of 50 m along the lead route. This includes
handling and stacking or hauling ( to sites of embankment construction) suitable cut materials and also the disposal of unsuitable cut materials in specified manner . This further
covers trimming and finishing of roadway .
Unit : 1 Cu m
E) Hard Rock ( chiselling,wedging,tempering )
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
2-1.2.2 5.f
2-1.8 Unskilled person-day 17.00 750.00 12750.00
2-1.9
T and P @ 3% of Labour Cost 382.50
Total Labour Component ( A ) 13132.50 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 13132.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 1969.88
Total Cost: Nrs. 15102.38
Rate : Nrs. 15102.38 Per Cu M
Item No 2 (1)
Description : Exavation for other structure including cutting of slopes , shoring ,shuttering, planking, ordinary sealing and disposal of materials up to a lead of 50 m along the lead route
Unit : 1 Cu m
( A) Ordinary Soil
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
2.4 9.a
Unskilled person-day 1.00 750.00 750.00
3
Unit : 1 Cu m
-2.2 Hard Soil
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
2.4 9.b
Unskilled person-day 2.00 750.00 1500.00
4
2.5) Special provision for preparation of rock foundation
Unit : 1 Cu m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
2.4 9.f
Unskilled person-day 0.50 750.00 375.00
Description : 3.2 Construction of roadway in embankment and miscellaneous backfilling areas with approved materials ( Hard soil cutting for filling material )obtained either from
excavation for road construction
borrowpits or other sources
excluding the excavation ( which shall be covered separately under S n No 5 ) and transporation ( which shall be covered under S N No 6 or 11 ) components
In this case, initial lead is 50 m
Unit : 1 Cu m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
5&10
Unskilled person-day 0.25 750.00 187.50 filling
Unskilled person-day 0.60 750.00 450.00 cutting
T and P @ 3% of Labour Cost 19.13
Total Labour Component ( A ) 656.63 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 656.63
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 98.49
Total Cost: Nrs. 755.12
Rate : Nrs. 755.12 Per Cu M
5
3.3
Compaction of filling material by 8-10 tonne roller by layer to layer .( for 100 cu m )
Respective Clause of Dor Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs)
Specifications norms(old) Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
2.ka.35 Skilled person-day Roller(8-10 t) hrs 1.67 1270.00 2120.90
Unskilled person-day 0.00
Total Labour Component ( A ) 0.00 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 2120.90
Sub Total (A+B+C ) : Nrs. 2120.90
Rate per Cu m 21.21
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 3.18
Total Cost: Nrs. 24.39
Rate : Nrs. 24.39 per cu m
Item no 4 SUB GRADE WORK
Description: 4.1 Scarifying existing granular/bituminuous road surface for carrying out the required operation necessary to complete the work . This include handling, salvaging, stack
ing and disposing of scarified material upto a lead of 100 m along the lead route .
Unit : 1 cu m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
15
2-5.7.6 Unskilled person-day 0.20 750.00 150.00
2-5.4.3
T and P @ 3% of Labour Cost 4.50
Total Labour Component ( A ) 154.50 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 154.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 23.18
Total Cost: Nrs. 177.68
Rate : Nrs. 177.68 Per Cu M
4.2 SUB Grade
According to Norms of (DOR new norms no-10.04, clause-1004)
Description : 4.1 Subgrade construction with treated materials formation of as per specification.
Unit : 1 cu m
Respective Clause of Labour (A) Material(B) Equipment ( c )
Amount
Category Unit Qty. Rate (Nrs) Amount(Nrs) Type Unit Qty. Rate (Nrs) Amount (Nrs) Type Unit Qty. Rate (Nrs)
Specifications (Nrs) Remarks
Suitable materail
Skilled person-day 0.01 1030.00 10.30 soil m 3
1.100 318.60 350.46 Grader hrs 0.020 2020.00 40.40
1004 Unskilled person-day 0.10 750.00 75.00 Roller(8-10t) hrs 0.017 1270.00 21.59
Water lit 100.00 0.31 31.00
Total Labour Component ( A ) 85.30 Total Material Component ( B ) 381.46 Total Equipment Component ( C) ) 61.99
Sub Total (A+B+C ) : Nrs. 528.75
Contractor 's Miscellaneous Overhead Expenses ( 15 % ): Nrs. 79.31
Total Cost: Nrs. 608.06
Rate : Nrs. 608.06 Per Cu M
6
4.3
According to Norms of ((DOR new norms no-10.04, clause-1004)
Description : Subgrade construction without treated materials formation of as per specification.
Unit : 1 cu m
Respective Clause of Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount(Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nr
Specifications Category Unit Qty. Type Unit Qty. Type Unit Qty. s) Remarks
Skilled person-day 0.01 1030.00 10.30 Grader hrs 0.020 2020.00 40.40
1004 Unskilled person-day 0.10 750.00 75.00 Roller(8-10t) hrs 0.017 1270.00 21.59
Water lit 100.00 0.26 26.00
Total Labour Component ( A ) 85.30 Total Material Component ( B ) 26.00 Total Equipment Component ( C) ) 61.99
Sub Total (A+B+C ) : Nrs. 173.29
Contractor 's Miscellaneous Overhead Expenses ( 15 % ): Nrs. 25.99
Total Cost: Nrs. 199.28
Rate : Nrs. 199.28 Per Cu M
4.4
According to Norms of ((DOR new norms no-10.05, clause-1003)
Description : Preparation of Subgrade for rehabilitaion or other similar works ( filing or cutting depth 10cm to 20cm thick)
Unit : 1 sq m a) Common soil
Respective Clause of Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount(Nrs) Rate (Nrs) Amount(Nrs) Rate (Nrs) Amount(Nr
Specifications Category Unit Qty. Type Unit Qty. Type Unit Qty. s) Remarks
1004 Unskilled person-day 0.15 750.00 112.50 0.00
Tools & plants 3 3.38
Total Labour Component ( A ) 115.88 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 115.88
Contractor 's Miscellaneous Overhead Expenses ( 15 % ): Nrs. 17.38
Total Cost: Nrs. 133.26
Rate : Nrs. 133.26 Per Sq M
Description : Preparation of Subgrade for rehabilitaion or other similar works ( filing or cutting depth 10cm to 20cm thick)
Unit : 1 sq m b) gravel & boulder mixed soil
Respective Clause of Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount(Nrs) Rate (Nrs) Amount(Nrs) Rate (Nrs) Amount(Nr
Specifications Category Unit Qty. Type Unit Qty. Type Unit Qty. s) Remarks
1004 Unskilled person-day 0.30 750.00 225.00 0.00
Tools & plants 3 6.75
0.00
Total Labour Component ( A ) 231.75 Total Material Component ( B ) 0.00 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 231.75
Contractor 's Miscellaneous Overhead Expenses ( 15 % ): Nrs. 34.76
Total Cost: Nrs. 266.51
Rate : Nrs. 266.51 Per sq M
7
Item No 5
Description : Carrying out the construction operation of granular sub- base including full compensations for
making arrangements for traffic in accordance with clause G -12 of the Specification except for initial treatment to shoulders and construction of diversions
fumishing all materials to be incorporated in the work including all royalties, fees, rents wherever necessary and all leads along the lead route
all labour and incindentals to complete the work to the specification and
and carrying out the work in part widths of roadway where directed.
A. With naturally found deposits of sand/gravel aggregates conforming to the specification for
(a) Class II Grading ( When CBR = 25 % )
Procuring sieved river gravel aggregates having sizes of 63-80 mm, 4.75-63 mm, 75 micron- m4.75 mm
Preparation of sub- grade that was finished earlier
5.1)Local gravel For laying of aggregates including compaction and the incidentals
Unit : 1 cu m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
3,1 Skilled person-day 0.005 1030.00 5.15 local gravel Cu m 1.28 2021.14 2587.06 8-10 t roller hrs 0.09 1270.00 114.30
deisel ltr 0.79 86.00 68.11
26.A Unskilled person-day 0.04 750.00 30.00 Transportation DOR 12.02
Total Labour Component ( A ) 35.15 Total Material Component ( B ) 2655.18 Total Equipment Component ( C) ) 114.30
Sub Total (A+B+C ) : Nrs. 2804.63
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 420.69
Total Cost: Nrs. 3225.32
Rate : Nrs. 3225.32 Per Cu M
Unit : 1 cu m
5.2)Gravel from Tikabhairav, Bhakunde Equv.Quarry site
8
(5.3) Class II Grading ( When CBR = 25 % ) without compaction .
Procuring sieved river gravel aggregates having sizes of 63-80 mm, 4.75-63 mm, 75 micron- m4.75 mm
Preparation of sub- grade that was finished earlier
a)Local gravel For laying of aggregates including compaction and the incidentals
Unit : 1 cu m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
3,1 Skilled person-day 0.005 1030.00 5.15 gravel Cu M 1.28 2021.14 2587.06
26.A Unskilled person-day 0.04 750.00 30.00 Transportation 0.00
Total Labour Component ( A ) 35.15 Total Material Component ( B ) 2587.06 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 2622.21
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 393.33
Total Cost: Nrs. 3015.55
Description : carrying out the construction operation of water bound macadam ( WBM ), sub- base/base course including full compensation for
making arrangements for traffic in accordance with clause G 12 of the specification except for initial treatment to shoulders and construction of diversions
fumishing all materials to be incorporated in the work including all royalties, fees, rents wherever necessary and all leads along the lead route
all labour and incindentals to complete the work to the specification and
and carrying out the work in part widths of roadway where directed Collection of rubble for aggregates
Grading No I ( Restricted to use for sub-base only ) Laying of sub-base For sub -base
Breaking stones for aggregates sizes -10-20, 20-40mm, 40-63mm,80-100mm Incidentals
Unit : 1 Cu m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
27 Skilled person-day 0.01 1030.00 5.15 Mix soling Cu M 1.27 2577.88 3273.90 8-10 t roller hrs 0.09 1270.00
dor 12.13
3,2 Unskilled person-day 0.04 750.00 30.00 Transportation 0.00
Total Labour Component ( A ) 35.15 Total Material Component ( B ) 3273.90 Total Equipment Component ( C) ) 0.00
Sub Total (A+B+C ) : Nrs. 3309.05
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 496.36
Total Cost: Nrs. 3805.41
Rate : Nrs. 3805.41 Per Cu M
9
Grading No I I For base
Breaking stones for aggregates sizes -10-20, 20-40mm, 40-50mm,50-63mm,63-80mm
For screening - 150microm down,150 microm, 4.75 mm ,4.75mm-10mm, 10-12.5mm
Collection of rubble for aggregates
Laying of base
Incidentals
Unit : 1 Cu m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
27 Skilled person-day 0.25 1030.00 257.50 Mix soling Cu M 1.3 2577.88 3351.24 8-10 t roller hrs 0.09 1270.00 114.30
Item No 8
Description : Preparation base for bituminuous macadam by carrying out the preparatory work of scarifying and relaying the aggregate base course including full compensation for
making arrangements for traffic in accordance with clause G 12 of the specification except for initial treatment to shoulders and construction of diversions
Preparation of base including filling of potholes except for levelling course
providing all materials to be incorporated in the work including all royalties fees, rents where necessary and all leads along the lead route
all labour and incindentals to complete the work to the specification and
This item is same as S No 8 but with due deduction for the procurement of quantity received from the scarifying of receiving surface
Item No 11
Description Cleaning top surface by brush and broom before pitching
of Item
Unit : 10 sq m
.a) On water Bound Macadam
Respective Clause of Labour (A) Material(B) Equipment ( c )
Dor norms
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
(old)
Specifications Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
15.16.1 Skilled person-day 1030.00 brush, kuchho L.S 55.00 55.00
Unskilled person-day 0.25 750.00 187.50
Total Labour Component ( A ) 187.50 Total Material Component ( B ) 55.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 242.50
Nrs. 24.25 Per sqm
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 3.64
Total Cost: Nrs. 27.89
Rate : Nrs. 27.89 Persqm
10
On Other Surface
Respective Clause Dor Labour (A) Material(B) Equipment ( c )
norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications (old) Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
15.16.2 Skilled person-day brush, kuchho L.s 55.00 55.00
Unskilled person-day 0.20 750.00 150.00
Total Labour Component ( A ) 150.00 Total Material Component ( B ) 55.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 205.00
Nrs. 20.50 Per sqm
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 3.08
Total Cost: Nrs. 23.58
Rate : Nrs. 23.58 Per10sqm
Description of Item
Semi-grouting works including compaction ( Ref norms of Dor Item no 15-21(a) in Open oven
( 5 cm thickness )
Unit 10 sq M
Respective Clause Dor Labour (A) Material(B) Equipment ( c )
norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications (old) Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
15.21 Skilled person-day Bitumen kg 35.00 78.10 2733.50
Roller
Unskilled person-day 1.20 750.00 900.00 kerosine lit 0.25 100.00 25.00 machine hrs 0.07 1270.00 88.90
Fire wood ( in
open oven) kg 48.00 18.00 864.00 Sprayer hrs 0.07 1800.00 126.00
Aggregate 38-
40mm Cu M 0.60 0.00
Aggregate 12mm
Cu M 0.15 0.00 0.00 dor
13.06/01
Total Labour Component ( A ) 900.00 Sub Total 3622.50 Total Equipment Component ( C) ) 214.90
Transportation 0.00
Total Material Component ( B ) 3622.50
Sub Total (A+B+C ) : Nrs. 4737.40
Nrs. 473.74 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 710.61
Total Cost: Nrs. 5448.01
Rate : Nrs. 544.80 per sq m
11
Description : Carrying out the required operation for the application of tack coat including full compensation for
making arrangements for traffic in accordance with clause G 12 of the specification except for initial treatment to shoulders and construction of diversions
providing all materials to be incorporated in the work including all royalties fees, rents where necessary and all leads along the lead route
all labour and incindentals to complete the work to the specification and
Carrying out the work in part widths of roadway where directed
Unit : 10 10 sq m
a) When the application is upon existing bituminuous treated surface
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
4,2 30.a Skilled person-day Bitumen kg 5.00 78.10 390.50
Unskilled person-day 0.15 750.00 112.50 Fire wood kg 8.00 18.00 144.00 Sprayer hrs 0.04 1800 72.00
kerosine lit 0.50 100.00 50.00
Sub Total 584.50
Transportation
Total Labour Component ( A ) 112.50 Total Material Component ( B ) 584.50 Total Equipment Component ( C) ) 72.00
Sub Total (A+B+C ) : Nrs. 769.00
Rate : Nrs. 76.90 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 11.54
Total Cost: Nrs. 88.44
Rate : Nrs. 88.44 per sq m
Tack Coat
b) When the application is upon existing WBM
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit. Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
4,2 30.b Skilled person-day Bitumen kg 10.00 78.10 781.00
Unskilled person-day 0.20 750.00 150.00 Fire wood kg 16.00 18.00 288.00 Sprayer hrs 0.04 1800.00 72.00
kerosine lit 0.50 100.00 50.00
Sub Total 1119.00
Transportation 0.00
Total Labour Component ( A ) 150.00 Total Material Component ( B ) 1119.00 Total Equipment Component ( C) ) 72.00
Sub Total (A+B+C ) : Nrs. 1341.00
Rate : Nrs. 134.10 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 20.12
Total Cost: Nrs. 154.22 per sq m
12
Description : Carrying out the required operation for the application of prime coat supplying of all necessary material.
Unit : 10 10 sq m
a) When the application is upon existing bituminuous treated surface
Respective Clause Dor Labour (A) Material(B) Equipment ( c )
norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications (old) Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
4,2 15.18.1 Skilled person-day Bitumen kg 4.90 78.10 382.69
Fire wood in
Unskilled person-day 0.20 750.00 150.00 open oven kg 8.00 18.00 0.00 Sprayer hrs 0.04 1800.00 72.00
Kerosine lit 0.50 100.00 50.00
Sub Total 432.69
Transportation 0.00
Total Labour Component ( A ) 150.00 Total Material Component ( B ) 432.69 Total Equipment Component ( C) ) 72.00
Sub Total (A+B+C ) : Nrs. 654.69
Rate : Nrs. 65.47 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 9.82
Total Cost: Nrs. 75.29
Rate : Nrs. 75.29 per sq m
Item No
According to Norms of DoR 18 (B)
Description :
Unit : 10
Description : Carrying out the required operation for the application of prime coat supplying of all necessary material.
b)When the application is upon base course.
Respective Clause Dor Labour (A) Material(B) Equipment ( c )
norms Rate (Nrs) Amount Rate (Nrs) Amount(Nrs Rate Amount(Nrs)
of Specifications (old) Category Unit Qty. (Nrs) Type Unit Qty. ) Type Unit Qty. (Nrs) Remarks
4,2 15.18.2 Skilled person-day Bitumen kg 9.75 78.10 761.48
Fire wood in Sprayer
Unskilled person-day 0.20 750.00 150.00 open oven kg 16.00 18.00 0.00 hrs 0.04 1800 72.00
Kerosine lit 0.50 100.00 50.00
Sub total 811.48
Transportation 0.00
Total Labour Component ( A ) 150.00 Total Material Component ( B ) 811.48 Total Equipment Component ( C) ) 72.00
Sub Total (A+B+C ) : Nrs. 1033.48
Rate : Nrs. 103.35 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 15.50
Total Cost: Nrs. 118.85
Rate : Nrs. 118.85 per sq m
13
Item No
Description : Premix carpeting work including compactions
making arrangements for traffic in accordance with clause G 12 of the specification except for initial treatment to shoulders and construction of diversions
providing all materials to be incorporated in the work including all royalties fees, rents where necessary and all leads along the lead route
Unit : 1 cu m In norms unit is in sq.m. Now calculate is in cu.m. there for (10m2 *.02m thick =.2 m3 then 1m3/.20 m3 =5 times)
Respective Clause
Labour (A) Material(B) Equipment ( c )
Dor
norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
(old)
of Specifications Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
8-10 t
4,2 15.24.khaSkilled person-day 0.45 1030.00 463.50 Bitumen kg 77.00 78.10 6013.70 roller hrs 0.50 1270 635.00
Sprayer
Due to m3
unit
multiply
by above
Agg( 6 -12 mm ) cu m 1.20 3213.21 3855.85 5 times
kerosene.
lit 7.70 100.00 770.00
14
Item No
Description : Sand seal including compaction .
Unit : 10 10 sq m
Respective Clause Dor Labour (A) Material(B) Equipment ( c )
norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications (old) Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
8-10 t
15.23 Skilled person-day Bitumen kg 9.60 78.10 749.76 roller hrs 0.04 1270.00 50.80
Unskilled person-day 0.45 750.00 337.50 Fire wood kg 16.00 18.00 0.00 Sprayer hrs 0.04 1800.00 72.00
( in open oven )
coarse sand cu m 0.07 3213.21 224.92
Sub Total 974.68
Transportation 0.00
Total Labour Component ( A ) 337.50 Total Material Component ( B ) 974.68 Total Equipment Component ( C) ) 122.80
Sub Total (A+B+C ) : Nrs. 1434.98
Rate : Nrs. 143.50 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 21.52
Total Cost: Nrs. 165.02
Rate : Nrs. 165.02 per sq m
Item No 6
Description : Brick masonry with all necessary operations including full compensations for all labour , materials , scaffolding, and other incidentals required to complete the work
as per the specifications and as shown on the drawings. It includes full compensation for using specially moulded bricks on the face of walls with better provision
of weep holes jointed with cement sand mortar.
Unit : 1cu m
6.1 in 1:4 mix ratio
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Brick
7 37.A.b Skilled person-day 1.50 1030.00 1545.00 (224*108*57mm) No 530.00 14.47 7669.10
Unskilled person-day 4.99 750.00 3742.50 Cement OPC bag 2.00 825.00 1650.00
Sand cu m 0.35 3213.21 1124.62
Sub Total 10443.72
Transportation 0.00
Total Labour Component ( A ) 5287.50 Total Material Component ( B ) 10443.72 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 15731.22
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 2359.68
Total Cost: Nrs. 18090.91
Rate : Nrs. 18090.91 per cu m
15
6.2 in 1:6mix ratio
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Brick
7 37.A.c Skilled person-day 1.50 1030.00 1545.00 (224*108*57mm) No 530.00 14.47 7669.10
Unskilled person-day 5.02 750.00 3765.00 Cement bag 1.40 825.00 1155.00
Sand cu m 0.38 3213.21 1221.02
Sub Total 10045.12
Transportation 0.00
Total Labour Component ( A ) 5310.00 Total Material Component ( B ) 10045.12 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 15355.12
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 2303.27
Total Cost: Nrs. 17658.39
Rate : Nrs. 17658.39 per cu m
Item no 7 7
Description 12.5 mm th. Plastering with cement sand mortar on brick walls or concrete surfaces with all necessary operations including full compensation for all labours, materials
scaffolding and other incidentals required to complete the work as per the specifications
Unit 100 sq m
16
Description 12.5 mm th. Plastering with cement sand mortar on brick walls or concrete surfaces with all necessary operations including full compensation for all labours, materials
scaffolding and other incidentals required to complete the work as per the specifications
Unit 100 sq m
7.2 in 1:6mix ratio
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
7-9.4 37.B.d Skilled person-day 15.00 1030.00 15450.00 Cement Bag 5.76 825.00 4752.00
,7-12 Unskilled person-day 13.70 750.00 10275.00 Sand cu m 1.58 3213.21 5076.87
Bamboo nos 2.00 220.00 440.00
Rope 100.00
7-13.2 Sub Total 10368.87
Transportation 0.00
Total Labour Component ( A ) 25725.00 Total Material Component ( B ) 10368.87 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 36093.87
Rate : Nrs. 360.94 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 54.14
Total Cost: Nrs. 415.08
Rate : Nrs. 415.08 per sq m
Item no 8
Description Pointing work with cement sand mortar on brick wall with all required operations including full compensation for all labours, materials and other incidentals necessary
to complete the work as per the specifications
Unit 100 sq m
22.a) in 1:3mix ratio
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
7-9.3 37.C.c Skilled person-day 8.00 1030.00 8240.00 Cement Bag 1.92 825.00 1584.00
7-12 Unskilled person-day 8.88 750.00 6660.00 Sand cu m 0.29 3213.21 931.83
Bamboo nos 2.00 220.00 440.00
Rope Ls 100.00
and 7-13.3 Sub Total 3055.83
Transportation 0.00
Total Labour Component ( A ) 14900.00 Total Material Component ( B ) 3055.83 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 17955.83
Rate : Nrs. 179.56 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 26.93
Total Cost: Nrs. 206.49
17
Item no 9
Description Dry brick laying
Unit 10 sq m
9.1 Flat
Respective Clause Dor Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
11.15.ka Skilled person-day 0.50 1030.00 515.00 Brick Nos 420.00 14.47 6077.40
Unskilled person-day 1.00 750.00 750.00 Sand cu m 0.71 3213.21 2281.38
Sub Total 8358.78
Transportation 0.00
Total Labour Component ( A ) 1265.00 Total Material Component ( B ) 8358.78 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 9623.78
Rate : Nrs. 962.38 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 144.36
Total Cost: Nrs. 1106.73
Rate : Nrs. 1106.73 per sq m
18
Item no
Description Dry Stone laying work
Unit 9.3 1 cu.m.
Respective Clause of Dor Labour (A) Material(B) Equipment ( c )
norms n. Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications (old) Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
11.16 Skilled person-day 1.00 1030.00 1030.00 stone m3 1.10 2577.88 2835.66
Unskilled person-day 3.50 750.00 2625.00 Sand cu m 0.71 3213.21 2281.38
Sub Total 5117.04
Transportation 0.00
Total Labour Component ( A ) 3655.00 Total Material Component ( B ) 5117.04 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 8772.04
Rate : Nrs. 877.20 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 131.58
Total Cost: Nrs. 1008.78
Rate : Nrs. 1008.78 per sq m
Item no
Description Filling by stones in the foundation and levelling including haulage distance up to 30 m
Unit 9.4 1 Cu M
Respective Clause of Dor Labour (A) Material(B) Equipment ( c )
norms n. Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications (old) Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
6.5 Skilled person-day Stone cu m 1.20 2577.88 3093.45
Unskilled person-day 1.50 750.00 1125.00
Transportation 0.00
Total Labour Component ( A ) 1125.00 Total Material Component ( B ) 3093.45 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 4218.45
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 632.77
Total Cost: Nrs. 4851.22
Rate : Nrs. 4851.22 per cu m
Item no 10
Description Stone Masonry work including full compensation for all labour, materials and other incidentals require to complete the work as per the Specifications and drawings.
It includes full compensation for using specially dressed stones on the face of walls with batter and makes provision for weep holes as necessary
A Un-coursed Rubble Masonry
Unit 1 Cu M
a ) In dry
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
38.A.a Skilled person-day 0.50 1030.00 515.00 Stone cu m 1.10 2577.88 2835.66
Unskilled person-day 1.50 750.00 1125.00 Transportation 0.00
Total Labour Component ( A ) 1640.00 Total Material Component ( B ) 2835.66 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 4475.66
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 671.35
Total Cost: Nrs. 5147.01
Rate : Nrs. 5147.01 per cu m
19
A Un-coursed Rubble Masonry
Unit 1 Cu M
10.2) In 1:4 c/s mortar
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
8 38.A.c Skilled person-day 1.50 1030.00 1545.00 Rubble cu m 1.10 2577.88 2835.66
Unskilled person-day 3.24 750.00 2430.00 Sand cu m 0.47 3213.21 1510.21
Cement bag 2.32 825.00 1914.00
Sub Total 6259.87
Transportation 0.00
Total Labour Component ( A ) 3975.00 Total Material Component ( B ) 6259.87 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 10234.87
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 1535.23
Total Cost: Nrs. 11770.10
Rate : Nrs. 11770.10 per cu m
A Un-coursed Rubble Masonry
Unit 1 Cu M
10.3 In 1:6 c/s mortar
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
8 38.A.d Skilled person-day 1.50 1030.00 1545.00 Rubble cu m 1.10 2577.88 2835.66
Unskilled person-day 3.29 750.00 2467.50 Sand cu m 0.50 3213.21 1606.61
Cement bag 1.84 825.00 1518.00
Sub Total 5960.27
Transportation 0.00
Total Labour Component ( A ) 4012.50 Total Material Component ( B ) 5960.27 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 9972.77
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 1495.92
Total Cost: Nrs. 11468.68
Rate : Nrs. 11468.68 per cu m
20
Unit 11
Description 11.1 In Form work Providing ,preparing , and installing , of form work including necessary support and removing, after completion Foundation & footing work
Unit using mix wooden or soft wood 10 SqM Using DOR norms
Respective Clause of Dor Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
Timber planks/ Using
1804 18.01 Skilled person-day 1.50 1030.00 1545.00 board =0.42/8 cu m 0.0525 50905.25 2672.53 timber
Unskilled person-day 2.00 750.00 1500.00 Nails kg 1.00 112.00 112.00 plank 8
strut,batten etc times &
strut ,bttern
=0.18/12 cu m 0.0150 50905.25 763.58 12 times
Sub Total 3548.10 usage
Transportation 0.00
Total Labour Component ( A ) 3045.00 Total Material Component ( B ) 3548.10 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 6593.10
Rate : Nrs. 659.31 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 98.90
Total Cost: Nrs. 758.21
Rate : Nrs. 758.21 per sq m
Item no
Description 11.2 In Form work Providing ,preparing , and installing , of form work including necessary support and removing, after completion wall work
using plywood & mix wooden or soft wood
False work is not inlcuded
Unit 10 SqM Using DOR norms
Respective Clause of Dor Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
Water Proof Using ply
Plywood 9mm wood 8
times &
1804 18.02.01 Skilled person-day 2.20 1030.00 2266.00 thick =11/8 sq m 1.3750 1495.64 2056.51
strut ,bttern
Unskilled person-day 2.20 750.00 1650.00 Nails kg 2.50 112.00 280.00 12 times
strut,batten etc usage
=0.4/12 cu m 0.0333 50905.25 1696.84
Sub Total 4033.35
Transportation 0.00
Total Labour Component ( A ) 3916.00 Total Material Component ( B ) 4033.35 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 7949.35
Rate : Nrs. 794.93 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 119.24
Total Cost: Nrs. 914.17
Rate : Nrs. 914.17 per sq m
21
Item no
Description 11.3 In Form work Providing ,preparing , and installing , of form work including necessary support and removing, after completion Lintel , Beam & slab structure work
using mix wooden or soft wood False work is not inlcuded
Unit 10 SqM Using DOR norms
Respective Clause of Dor Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
Timber planks/ Using
board 19mm thick timber
plank 6
1804 18.05 Skilled person-day 1.80 1030.00 1854.00 =0.54/6 cu m 0.0900 50905.25 4581.47
times
Unskilled person-day 2.50 750.00 1875.00 Nails kg 2.50 112.00 280.00 times
Sub Total 4861.47 usage
Transportation 0.00
Total Labour Component ( A ) 3729.00 Total Material Component ( B ) 4861.47 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 8590.47
Rate : Nrs. 859.05 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 128.86
Total Cost: Nrs. 987.90
Rate : Nrs. 987.90 per sq m
Item no 12
Description 12.1 Reinforcement for RCC work. It includes procuring steel, its bending , placing, binding and fixing in position as shown on the drawings and as directed by the Engineer
It also includes for keeping reinforcement in approved position and joining as per approved method with due allowances for wastage, overlaps , spacer bars and
annealed steel wire for binding. This applies for general bending r equirements. When the above provisions is not adequate or in order words. Specific type of
the following norms are applicable.
Unit 1 metric tonne 94540
.a)Type ( A ) for Crank type along bar ( tor steel )
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
10 40.A Skilled person-day 7.00 1030.00 7210.00 Tor Steel Mt 1.05 79000.00 82950.00
Unskilled person-day 7.00 750.00 5250.00 Binding wire kg 10.00 92.00 920.00
Sub Total 83870.00
Transportation 0.00
Total Labour Component ( A ) 12460.00 Total Material Component ( B ) 83870.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 96330.00
Rate : Nrs. 96.33 per kg
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 14449.50
Total Cost: Nrs. 110779.50
Rate : Nrs. 110.78 per kg
22
Unit 12.2 1 metric tonne
b)Type ( B ) for Plain straight bar ( tor steel ) for Common use
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
10 40.B Skilled person-day 3.50 1030.00 3605.00 Tor Steel Mt 1.05 79000.00 82950.00
Unskilled person-day 3.50 750.00 2625.00 Binding wire kg 10.00 92.00 920.00
Sub Total 83870.00
Transportation 0.00
Total Labour Component ( A ) 6230.00 Total Material Component ( B ) 83870.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 90100.00
Rate : Nrs. 90.10 per kg
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 13515.00
Total Cost: Nrs. 103615.00
Rate : Nrs. 103.62 per kg
Unit 12.3 1 metric tonne
c)Type ( C) for C type hook bar ( tor steel )
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
10 40.C Skilled person-day 5.25 1030.00 5407.50 Tor Steel MT 1.05 79000.00 82950.00
Unskilled person-day 5.25 750.00 3937.50 Binding wire kg 10.00 92.00 920.00
Sub Total 83870.00
Transportation 0.00
Total Labour Component ( A ) 9345.00 Total Material Component ( B ) 83870.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 93215.00
Rate : Nrs. 93.22 per kg
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 13982.25
Total Cost: Nrs. 107197.25
Rate : Nrs. 107.20 per kg
23
Item no 13
Description Cement concrete work . It includes all labour and material required for mixing placing in position, vibrating , compacting , finishing , curing and all
incidentals required to product concrete of specified strength as per the specifications.
Unit 1 Cu M
13.1 Work in foundation
a ) M 10 grade ( 1 : 3 : 6 ) mix by volume
24
Work Superstructure component ( beam, slab, abutment, caps etc,, )
a) M 15grade ( 1 : 2 : 4) mix by volume
25
Item no 14
Description Fabrication of gabion boxes / mattress with diapharagms including , cutting , rolling, weaving .( For Heavy class wire)
( Diapharagm is to be provided to every 1 m length. )
Unit 1 Box
Hexogonal mesh size 100*120
Mesh wire 10 Swg, Selvedge wire 8 Swg ( Heavy class wire)
( 14.1 ) Box size 2m*1m*1m
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
44.1.B.ii. For Heavy
17-1.4 Skilled person-day 0.39 1030.00 401.70 Mesh wire kg 23.43 105.00 2460.15 class wire
a
17-5 Unskilled person-day 0.20 750.00 150.00 Selvedge wire kg 2.88 105.00 302.40
Sub Total 2762.55
and 17-6 Transportation 0.00
Total Labour Component ( A ) 551.70 Total Material Component ( B ) 2762.55 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 3314.25
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 497.14
Total Cost: Nrs. 3811.39
Rate : Nrs. 3811.39 per box Rate : Nrs. 1905.69 per cu.m.
( b ) mesh wire 10Swg, selvedge wire 8 Swg
( 14.2 ) Box size 3m*1m*1m
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
44.1.B.ii.
b For Heavy
17-1.4 Skilled person-day 0.57 1030.00 587.10 Mesh wire kg 34.08 105.00 3578.40 class wire
17-5and 17-6 Unskilled person-day 0.28 750.00 210.00 Selvedge wire kg 4.03 105.00 423.15
Sub Total 4001.55
Transportation 0.00
Total Labour Component ( A ) 797.10 Total Material Component ( B ) 4001.55 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 4798.65
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 719.80
Total Cost: Nrs. 5518.45
Rate : Nrs. 5518.45 per box Rate : Nrs. 1839.48 per cu.m.
26
( b ) mesh wire 10Swg, selvedge wire 8 Swg
(14.3 ) Box size 2m*1m*0.5m
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
44.1.B.ii.
17-1.4 c Skilled person-day 0.27 1030.00 278.10 Mesh wire kg 15.97 105.00 1676.85
For Heavy
17-5 Unskilled person-day 0.13 750.00 97.50 Selvedge wire kg 2.45 105.00 257.25 class wire
Sub Total 1934.10
and 17-6 Transportation 0.00
Total Labour Component ( A ) 375.60 Total Material Component ( B ) 1934.10 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 2309.70
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 346.46
Total Cost: Nrs. 2656.16
Rate : Nrs. 2656.16 per box Rate : Nrs. 2656.16 per cu.m.
( b ) mesh wire 10Swg, selvedge wire 8 Swg
( 14..4 ) Box size 3m*1m*0.5m
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
44.1.B.ii.
17-1.4 d Skilled person-day 0.39 1030.00 401.70 Mesh wire kg 23.43 105.00 2460.15
17-5 Unskilled person-day 0.20 750.00 150.00 Selvedge wire kg 3.46 105.00 363.30 For Heavy
Sub Total 2823.45 class wire
and 17-6 Transportation 0.00
Total Labour Component ( A ) 551.70 Total Material Component ( B ) 2823.45 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 3375.15
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 506.27
Total Cost: Nrs. 3881.42
Rate : Nrs. 3881.42 per box Rate : Nrs. 2587.62 per cu.m.
( b ) mesh wire 10Swg, selvedge wire 8 Swg
( 14.5 ) Box size 2m*1m*0.3m
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
44.1.B.ii. For Heavy
17-1.4 e Skilled person-day 0.22 1030.00 226.60 Mesh wire kg 13.00 105.00 1365.00 class wire
17-5 Unskilled person-day 0.11 750.00 82.50 Selvedge wire kg 2.28 105.00 239.40
Sub Total 1604.40
and 17-6 Transportation 0.00
Total Labour Component ( A ) 309.10 Total Material Component ( B ) 1604.40 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 1913.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 287.03
Total Cost: Nrs. 2200.53
Rate : Nrs. 2200.53
27
( b ) mesh wire 10Swg, selvedge wire 8 Swg
( 14.6 ) Box size 3m*1m*0.3m
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount (Nrs) Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. Type Unit Qty. (Nrs) Remarks
44.1.B.ii.
17-1.4 f Skilled person-day 0.32 1030.00 329.60 Mesh wire kg 19.17 105.00 2012.85
Selvedge wire For Heavy
17-5 Unskilled person-day 0.16 750.00 120.00 kg 3.23 105.00 339.15 class wire
Sub Total 2352.00
and 17-6 Transportation 0.00
Total Labour Component ( A ) 449.60 Total Material Component ( B ) 2352.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 2801.60
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 420.24
Total Cost: Nrs. 3221.84
Rate : Nrs. 3221.84
Item no 15
Description Packing and filling of gabion crates with rubble stones same as dry masonry
Unit 1 Cu M
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
17-1.4 45(38.A.a) Skilled person-day 0.30 1030.00 309.00 Rubble Stone cu m 1.10 2577.88 2835.66
17-5 Unskilled person-day 0.75 750.00 562.50
17.6 Transportation 0.00
Total Labour Component ( A ) 871.50 Total Material Component ( B ) 2835.66 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 3707.16
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 556.07
Total Cost: Nrs. 4263.24
Rate : Nrs. 4263.24
Item no 16
Description Assembling of wire crates/gabion/revetment and placing them in position including stretching, binding them together and tying down lids.(For Heavy class)
(I) Binding wire (Medium class)- 12 SWG
(16.1)Box size 2*1*1
Unit 1 Box
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Binding wire 12 SWG
17-1.4 44.2.a Skilled person-day 1030.00 kg 0.95 100.00 95.00
17-1.5 Unskilled person-day 0.09 750.00 67.50 For Heavy
and 17-1.6 Transportation 0.00 class wire
Total Labour Component ( A ) 67.50 Total Material Component ( B ) 95.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 162.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 24.38
Total Cost: Nrs. 186.88
28
(16.2)Box size 3*1*1
Unit 1 Box
Respective Clause of Labour (A) Material(B) Equipment ( c )
dolidar Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
Specifications Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Binding wire 12 For Heavy
17-1.4 44.2.b Skilled person-day 1030.00 SWG kg 1.30 100.00 130.00 class wire
17-1.5 Unskilled person-day 0.13 750.00 97.50 Transportation 0.00
Total Labour Component ( A ) 97.50 Total Material Component ( B ) 130.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 227.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 34.13
Total Cost: Nrs. 261.63 Rate : Nrs. 87.21 per cu.m.
(16.3)Box size 2*1*0.5
Unit 1 Box
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Norms n. Category Unit Qty. Rate (Nrs) Amount Type Unit Qty. Rate (Nrs) Amount Type Unit Qty. Rate Amount(Nrs) Remarks
Specifications
(Nrs) (Nrs) (Nrs)
Binding wire 12 For Heavy
17-1.4 44.2.c Skilled person-day 1030.00 SWG kg 0.70 100.00 70.00 class wire
17-1.5 Unskilled person-day 0.07 750.00 52.50 Transportation 3.50
Total Labour Component ( A ) 52.50 Total Material Component ( B ) 73.50 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 126.00
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 18.90
Total Cost: Nrs. 144.90
Rate : Nrs. 144.90 Rate : Nrs. 144.90 per cu.m.
(16.4)Box size 3*1*0.5
Unit 1 Box
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
Binding wire 12
17-1.4 44.2.d Skilled person-day 1030.00 SWG kg 0.95 100.00 95.00 For Heavy
17-1.5 Unskilled person-day 0.09 750.00 67.50 class wire
and 17-1.6 Transportation 0.00
Total Labour Component ( A ) 67.50 Total Material Component ( B ) 95.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 162.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 24.38
Total Cost: Nrs. 186.88
Rate : Nrs. 186.88 Rate : Nrs. 124.58 per cu.m.
29
(16.5)Box size 2*1*.3
Unit 1 Box
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Binding wire 12
17-1.4 44.2.e Skilled person-day 1030.00 SWG kg 0.65 100.00 65.00
17-1.5 Unskilled person-day 0.06 750.00 45.00 For Heavy
and 17-1.6 Transportation 0.00 class wire
Total Labour Component ( A ) 45.00 Total Material Component ( B ) 65.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 110.00
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 16.50
Total Cost: Nrs. 126.50
Rate : Nrs. 126.50
(16.6)Box size 3*1*.3
Unit 1 Box
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Binding wire 12
17-1.4 44.2.f Skilled person-day 1030.00 kg 0.90 100.00 90.00
SWG
17-1.5 Unskilled person-day 0.09 750.00 67.50 For Heavy
and 17-1.6 Transportation 0.00 class wire
Total Labour Component ( A ) 67.50 Total Material Component ( B ) 90.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 157.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 23.63
Total Cost: Nrs. 181.13
Rate : Nrs. 181.13
30
Item no 17
Description Fabrication of gabion box including , cutting , rolling, weaving .( For Medium class wire )
( Diapharagm is to be provided to every 1 m length. )
Unit 1 Box
Hexogonal mesh size 100*120
( b ) Mesh wire 10 SWG, Selvedge wire 8 SWG ( Medium class wire)
( 17.1) Box size 2m*1m*1m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
44.1.B.ii.a
17-1.4 Skilled person-day 0.39 1030.00 401.70 Mesh wire kg 23.43 100.00 2343.00
17-5 Unskilled person-day 0.20 750.00 150.00 Selvedge wire kg 2.88 100.00 288.00 Medium
Sub Total 2631.00 class wire
and 17-6 Transportation 0.00
Total Labour Component ( A ) 551.70 Total Material Component ( B ) 2631.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 3182.70
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 477.41
Total Cost: Nrs. 3660.11
Rate : Nrs. 3660.11
( b ) mesh wire 10Swg, slavage wire 8 Swg
( 17..2 ) Box size 3m*1m*1m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
44.1.B.ii.b
17-1.4 Skilled person-day 0.57 1030.00 587.10 Mesh wire kg 34.08 100.00 3408.00 Medium
17-5and 17-6 Unskilled person-day 0.28 750.00 210.00 Selvedge wire kg 4.03 100.00 403.00 class wire
Sub Total 3811.00
Transportation 0.00
Total Labour Component ( A ) 797.10 Total Material Component ( B ) 3811.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 4608.10
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 691.22
Total Cost: Nrs. 5299.32
Rate : Nrs. 5299.32
( b ) mesh wire 10Swg, slavage wire 8 Swg
( 17.3 ) Box size 2m*1m*0.5m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
44.1.B.ii.c
17-1.4 Skilled person-day 0.27 1030.00 278.10 Mesh wire kg 15.97 100.00 1597.00 Medium
17-5 Unskilled person-day 0.13 750.00 97.50 Selvedge wire kg 2.45 100.00 245.00 class wire
Sub Total 1842.00
and 17-6 Transportation 0.00
Total Labour Component ( A ) 375.60 Total Material Component ( B ) 1842.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 2217.60
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 332.64
Total Cost: Nrs. 2550.24
Rate : Nrs. 2550.24
31
( b ) mesh wire 10Swg, slavage wire 8 Swg
17.4Box size 3m*1m*0.5m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
44.1.B.ii.d
17-1.4 Skilled person-day 0.39 1030.00 401.70 Mesh wire kg 23.43 100.00 2343.00
17-5 Unskilled person-day 0.20 750.00 150.00 Selvedge wire kg 3.46 100.00 346.00 Medium
Sub Total 2689.00 class wire
and 17-6 Transportation 0.00
Total Labour Component ( A ) 551.70 Total Material Component ( B ) 2689.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 3240.70
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 486.11
Total Cost: Nrs. 3726.81
Rate : Nrs. 3726.81
( b ) mesh wire 10Swg, slavage wire 8 Swg
( 17.5 ) Box size 2m*1m*0.3m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. Type Unit Qty. Remarks
44.1.B.ii.e
17-1.4 Skilled person-day 0.22 1030.00 226.60 Mesh wire kg 13.00 100.00 1300.00 Medium
17-5 Unskilled person-day 0.11 750.00 82.50 Selvedge wire kg 2.28 100.00 228.00 class wire
Sub Total 1528.00
and 17-6 Transportation 0.00
Total Labour Component ( A ) 309.10 Total Material Component ( B ) 1528.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 1837.10
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 275.57
Total Cost: Nrs. 2112.67
Rate : Nrs. 2112.67
32
Item no 18
Description Assembling of wire crates/gabion/revetment and placing them in position including stretching, binding them together and tying down lids. ( For Medium class wire )
(I) Binding wire ( Medium class)- 12 SWG
(18.1)Box size 2*1*1
Unit 1 Box
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Binding wire
17-1.4 44.2.a Skilled person-day 1030.00 12swg kg 0.95 100.00 95.00 Medium
17-1.5 Unskilled person-day 0.09 750.00 67.50 class wire
and 17-1.6 Transportation 0.00
Total Labour Component ( A ) 67.50 Total Material Component ( B ) 95.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 162.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 24.38
Total Cost: Nrs. 186.88
Rate : Nrs. 186.88
(31.2.2)Box size 3*1*1
Unit 1 Box
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Binding wire
17-1.4 44.2.b Skilled person-day 1030.00 12swg kg 1.30 100.00 130.00 Medium
17-1.5 Unskilled person-day 0.13 750.00 97.50 Transportation 6.50 class wire
Total Labour Component ( A ) 97.50 Total Material Component ( B ) 136.50 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 234.00
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 35.10
Total Cost: Nrs. 269.10
(18.3)Box size 2*1*0.5
Unit 1 Box
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Binding wire
17-1.4 44.2.c Skilled person-day 1030.00 12swg kg 0.70 100.00 70.00 Medium
17-1.5 Unskilled person-day 0.07 750.00 52.50 Transportation 0.00 class wire
Total Labour Component ( A ) 52.50 Total Material Component ( B ) 70.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 122.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 18.38
Total Cost: Nrs. 140.88
Rate : Nrs. 140.88
33
(18.4)Box size 3*1*0.5
Unit 1 Box
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Binding wire
17-1.4 44.2.d Skilled person-day 1030.00 12swg kg 0.95 100.00 95.00 Medium
17-1.5 Unskilled person-day 0.09 750.00 67.50 class wire
and 17-1.6 Transportation 0.00
Total Labour Component ( A ) 67.50 Total Material Component ( B ) 95.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 162.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 24.38
Total Cost: Nrs. 186.88
Rate : Nrs. 186.88
(18.5)Box size 2*1*.3
Unit 1 Box
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Binding wire
17-1.4 44.2.e Skilled person-day 1030.00 12swg kg 0.65 100.00 65.00 Medium
17-1.5 Unskilled person-day 0.06 750.00 45.00 class wire
and 17-1.6 Transportation 0.00
Total Labour Component ( A ) 45.00 Total Material Component ( B ) 65.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 110.00
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 16.50
Total Cost: Nrs. 126.50
Rate : Nrs. 126.50
(18.6)Box size 3*1*.3
Unit 1 Box
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Specifications Norms n. Category Unit Qty. Rate (Nrs) Amount Type Unit Qty. Rate (Nrs) Amount Type Unit Qty. Rate Amount(Nrs) Remarks
(Nrs) Binding wire (Nrs) (Nrs)
17-1.4 44.2.f Skilled person-day 1030.00 12swg kg 0.90 100.00 90.00 Medium
17-1.5 Unskilled person-day 0.09 750.00 67.50 class wire
and 17-1.6 Transportation 0.00
Total Labour Component ( A ) 67.50 Total Material Component ( B ) 90.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 157.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 23.63
Total Cost: Nrs. 181.13
Rate : Nrs. 181.13
34
Item no 19
Description Laying, fitting of hume pipe having a length 1 m or more. It includes all operations required to complete the work up to a trench depth of 2.2 m below
the ground level and the jointing of pipes with 1:2 cement sand mortar.
Unit 1M
(A) R c c hume pipe NP 2
(A)For one or 1st pipe
(A1) pipe having 150 mm dia
Respective Clause Labour (A) Material(B) Equipment ( c )
Dolidar
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
Norms n.
of Specifications Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
15-5 47.a Skilled person-day 1030.00 Rcc Hp Np2 mtr 1.00 570.00 570.00 1st pipe
15-6 Unskilled person-day 0.075 750.00 56.25
Transportation 0.00
Total Labour Component ( A ) 56.25 Total Material Component ( B ) 570.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 626.25
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 93.94
Total Cost: Nrs. 720.19
Rate : Nrs. 720.19
35
(A4) pipe having 600 mm dia
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
15-5 47.a Skilled person-day 1030.00 Rcc Hp Np2 mtr 1.00 2740.00 2740.00 1st pipe
15-6 Unskilled person-day 0.25 750.00 187.50
Transportation 0.00
Total Labour Component ( A ) 187.50 Total Material Component ( B ) 2740.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 2927.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 439.13
Total Cost: Nrs. 3366.63
Rate : Nrs. 3366.63
(A5) pipe having 900 mm dia
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
15-5 47.a Skilled person-day 1030.00 Rcc Hp Np2 mtr 1.00 5835.00 5835.00 1st pipe
15-6 Unskilled person-day 0.35 750.00 262.50 Transportation 0.00
Total Labour Component ( A ) 262.50 Total Material Component ( B ) 5835.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 6097.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 914.63
Total Cost: Nrs. 7012.13
Rate : Nrs. 7012.13
Item no 19 b
Description Laying, fitting of hume pipe having a length 1 m or more. It includes all operations required to complete the work up to a trench depth of 2.2 m below the ground level
and the jointing of pipes with 1:2 cement sand mortar.
Unit 1M
(A) R c c hume pipe NP 2
(b)For every sbusequent pipe having a length of minimum 1 m
(B1) pipe having 1 2
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Rcc Hp Np2 every
47.b sbusequen
15-5 Skilled person-day 0.005 1030.00 5.15 mtr 1.00 570.00 570.00 t pipe
15-6 Unskilled person-day 0.020 750.00 15.00 Cement bag 0.01 825.00 8.25
Jute kg 0.50 76.00 38.00
Bitumen kg 0.10 78.10 7.81
Sub Total 624.06
Transportation 0.00
Total Labour Component ( A ) 20.15 Total Material Component ( B ) 624.06 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 644.21
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 96.63
Total Cost: Nrs. 740.84
Rate : Nrs. 740.84
36
(B2) pipe having 300 mm dia
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) every
Remarks
Rcc Hp Np2 sbusequen
15-5 47.b Skilled person-day 0.02 1030.00 20.60 mtr 1.00 1260.00 1260.00 t pipe
15-6 Unskilled person-day 0.10 750.00 75.00 Cement bag 0.015 825.00 12.38
Jute kg 1.00 76.00 76.00
Bitumen kg 0.20 78.10 15.62
Sub Total 1364.00
Transportation 0.00
Total Labour Component ( A ) 95.60 Total Material Component ( B ) 1364.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 1459.60
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 218.94
Total Cost: Nrs. 1678.53
Rate : Nrs. 1678.53
Description Laying, fitting of hume pipe having a length 1 m or more. It includes all operations required to complete the work up to a trench depth of 2.2 m below the ground level
and the jointing of pipes with 1:2 cement sand mortar.
Unit 1M
(B3) pipe having 450 mm dia
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
Rcc Hp Np2
every
47.b sbusequen
15-5 Skilled person-day 0.02 1030.00 20.60 mtr 1.00 1852.00 1852.00 t pipe
15-6 Unskilled person-day 0.10 750.00 75.00 Cement bag 0.015 825.00 12.38
Jute kg 1.00 76.00 76.00
Bitumen kg 0.20 78.10 15.62
Sub Total 1956.00
Transportation 0.00
Total Labour Component ( A ) 95.60 Total Material Component ( B ) 1956.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 2051.60
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 307.74
Total Cost: Nrs. 2359.33
Rate : Nrs. 2359.33
37
Unit 1M
(B4) pipe having 600 mm dia
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount (Nrs) Rate (Nrs) Amount Rate (Nrs) Amount(Nrs)
Specifications Norms n. Category Unit Qty. Type Unit Qty. (Nrs) Type Unit Qty. Remarks
Rcc Hp Np2
every
47.b sbusequent
15-5 Skilled person-day 0.05 1030.00 51.50 mtr 1.00 2740.00 2740.00 pipe
15-6 Unskilled person-day 0.20 750.00 150.00 Cement bag 0.06 825.00 49.50
Jute kg 2.50 76.00 190.00
Bitumen kg 0.50 78.10 39.05
Sand cu m 0.01 3213.21 32.13
Sub Total 3050.68
Transportation 0.00
Total Labour Component ( A ) 201.50 Total Material Component ( B ) 3050.68 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 3252.18
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 487.83
Total Cost: Nrs. 3740.01
Rate : Nrs. 3740.01
38
Item no 19.C
C) R c c hume pipe NP 3
(a)For one or 1st pipe
(c.1) pipe having 150 mm dia
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
15-5 47.a Skilled person-day 1030.00 Rcc Hp Np3 mtr 1.00 1310.00 1310.00 1st pipe
15-6 Unskilled person-day 0.075 750.00 56.25 Transportation 65.50
Total Labour Component ( A ) 56.25 Total Material Component ( B ) 1375.50 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 1431.75
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 214.76
Total Cost: Nrs. 1646.51
Rate : Nrs. 1646.51
39
(C4) pipe having 600 mm dia
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
15-5 47.a Skilled person-day 1030.00 Rcc Hp Np3 mtr 1.00 6200.00 6200.00 1st pipe
15-6 Unskilled person-day 0.25 750.00 187.50 Transportation 0.00
Total Labour Component ( A ) 187.50 Total Material Component ( B ) 6200.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 6387.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 958.13
Total Cost: Nrs. 7345.63
Rate : Nrs. 7345.63
(C5) pipe having 900 mm dia
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
15-5 47.a Skilled person-day 1030.00 Rcc Hp Np3 mtr 1.00 12172.00 12172.00 1st pipe
15-6 Unskilled person-day 0.35 750.00 262.50 Transportation 0.00
Total Labour Component ( A ) 262.50 Total Material Component ( B ) 12172.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 12434.50
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 1865.18
Total Cost: Nrs. 14299.68
Rate : Nrs. 14299.68
Item no 19 D
Description Laying, fitting of hume pipe having a length 1 m or more. It includes all operations required to complete the work up to a trench depth of 2.2 m below the ground level
and the jointing of pipes with 1:2 cement sand mortar.
Unit 1M
(B) R c c hume pipe NP 3
(b)For every sbusequent pipe having a length of minimum 1 m
(D1) pipe having 150 mm dia
Respective Clause Dolidar Labour (A) Material(B) Equipment ( c )
Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
of Specifications Norms n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
every
47.b sbusequen
15-5 Skilled person-day 0.005 1030.00 5.15 Rcc Hp Np3 mtr 1.00 1310.00 1310.00 t pipe
15-6 Unskilled person-day 0.020 750.00 15.00 Cement bag 0.01 825.00 8.25
Jute kg 0.50 76.00 76.00
Bitumen kg 0.10 78.10 7.81
Sub Total 1402.06
Transportation 0.00
Total Labour Component ( A ) 20.15 Total Material Component ( B ) 1402.06 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 1422.21
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 213.33
Total Cost: Nrs. 1635.54
Rate : Nrs. 1635.54
40
(B2) pipe having 300 mm dia
Respective Dolidar Labour (A) Material(B) Equipment ( c )
Clause of Norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs
Specifications n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) ) Remarks
47.b every
sbusequ
15-5 Skilled person-day 0.02 1030.00 20.60 Rcc Hp Np3 mtr 1.00 3140.00 3140.00 ent pipe
15-6 Unskilled person-day 0.10 750.00 75.00 Cement bag 0.015 825.00 12.38
Jute kg 1.00 76.00 76.00
Bitumen kg 0.20 78.10 15.62
Sub Total 3244.00
Transportation 0.00
Total Labour Component ( A ) 95.60 Total Material Component ( B ) 3244.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 3339.60
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 500.94
Total Cost: Nrs. 3840.53
Rate : Nrs. 3840.53
47.b every
sbusequ
15-5 Skilled person-day 0.02 1030.00 20.60 Rcc Hp Np3 mtr 1.00 4500.00 4500.00 ent pipe
15-6 Unskilled person-day 0.10 750.00 75.00 Cement bag 0.02 825.00 12.38
Jute kg 1.00 76.00 76.00
Bitumen kg 0.20 78.10 15.62
Sub Total 4604.00
Transportation 0.00
Total Labour Component ( A ) 95.60 Total Material Component ( B ) 4604.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 4699.60
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 704.94
Total Cost: Nrs. 5404.53
Rate : Nrs. 5404.53
41
(D4) pipe having 600 mm dia
Respective Dolidar Labour (A) Material(B) Equipment ( c )
Clause of Norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs
Specifications n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) ) Remarks
Rcc Hp Np3
47.b every
sbusequ
15-5 Skilled person-day 0.05 1030.00 51.50 mtr 1.00 6200.00 6200.00 ent pipe
15-6 Unskilled person-day 0.20 750.00 150.00 Cement bag 0.06 825.00 49.50
Jute kg 2.50 76.00 190.00
Bitumen kg 0.50 78.10 39.05
Sand cu m 0.01 3213.21 32.13
Sub Total 6510.68
Transportation 0.00
Total Labour Component ( A ) 201.50 Total Material Component ( B ) 6510.68 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 6712.18
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 1006.83
Total Cost: Nrs. 7719.01
Rate : Nrs. 7719.01
47.b every
sbusequ
15-5 Skilled person-day 0.15 1030.00 154.50 Rcc Hp Np3 mtr 1.00 12172.00 12172.00 ent pipe
15-6 Unskilled person-day 0.50 750.00 375.00 Cement bag 0.12 825.00 99.00
Jute kg 4.00 76.00 304.00
Bitumen kg 1.00 78.10 78.10
Sand cu m 0.01 3213.21 32.13
Sub Total 12685.23
Transportation 0.00
Total Labour Component ( A ) 529.50 Total Material Component ( B ) 12685.23 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 13214.73
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 1982.21
Total Cost: Nrs. 15196.94
Rate : Nrs. 15196.94
42
Item No
Description of Item
Semi-grouting works including compaction ( Ref norms of Dor Item no 15-21(a) in Open oven For Patch work only
( 5 cm thickness )
Unit 10 sq M
Respective Clause of Dor Labour (A) Material(B) Equipment ( c )
norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs)
Specifications (old) Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) Remarks
15.21 Skilled person-day Bitumen kg 35.00 78.10 2733.50
Roller
Unskilled person-day 1.20 750.00 900.00 kerosine app. 100.00 70.00 machine hrs 0.07 1102.50 77.18
Fire wood ( in open oven) kg 72.00 18.00 1296.00 Sprayer hrs 0.07 1821.75 127.52
Aggregate 38-40mm Cu M 0.60 3344.95 2006.97
Aggregate 12mm Cu M 0.15 3344.95 501.74
Total Labour Component ( A ) 900.00 Sub Total 6608.21 Total Equipment Component ( C) ) 204.70
Transportation 0.00
Total Material Component ( B ) 6608.21
Sub Total (A+B+C ) : Nrs. 7712.91
Nrs. 771.29 per sq m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 1156.94
Total Cost: Nrs. 8869.85
Rate : Nrs. 886.98 per sq m
Item No
Description : Premix carpeting work including compactions For Patch work only
making arrangements for traffic in accordance with clause G 12 of the specification except for initial treatment to shoulders and construction of diversions
providing all materials to be incorporated in the work including all royalties fees, rents where necessary and all leads along the lead route
Unit : 1 cu m In norms unit is in sq.m. Now calculate is in cu.m. there for (10m2 *.02m thick =.2 m3 then 1m3/.20 m3 =5 times)
Equipment ( c
Respective Clause of Dor norms Labour (A) Material(B) )
Specifications (old)
Remarks
Category Unit Qty. Rate (Nrs) Amount Type Unit Qty. Rate (Nrs) Amount Type Rate Amount(Nrs
8-10 t Unit Qty.
Due to m3
(Nrs) (Nrs) (Nrs) )
4,2 15.24.khSkilled person-day Bitumen kg 77.00 78.10 6013.70 roller hrs 0.50 1102.50 551.25 unit
multiply by
Fire wood in open Sprayer above 5
Unskilled person-day 4.50 750.00 3375.00 oven kg 180.00 18.00 3240.00 hrs 0.50 1821.75 910.88 times
6 mm agg cu m 0.58 3213.21 1847.60
12mm agg. cu m 0.38 3344.95 1254.36 Half of
coarse sand. According
cu m 0.48 3213.21 1526.27 to 15.24.ka
kerosene. LS 7.70 100.00 770.00 Agg.qty
multiply by
Sub Total 14651.93 5 times
transportatin 0.00
Total Labour Component ( A ) 3375.00 Total Material Component ( B ) 14651.93 Total Equipment Component ( C) 1462.13
Sub Total (A+B+C ) : Nrs. 19489.05
Rate : Nrs. 19489.05 per cu m
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 2923.36
Total Cost: Nrs. 22412.41
Rate : Nrs. 22412.41 per cu m
43
Item no 20
Description Fabricated Gabion boxes by Meachine weaving Mechanically Selvedged double twist wire mesh all complete work.
( Diapharagm is to be provided to every 1 m length. )
Unit 1 Box
Hexogonal mesh size 100*120
3.9/3/2.4 Heavy galvanized(ZN)
( 20.1 ) Box size 2m*1m*1m
Respective Dolidar Labour (A) Material(B) Equipment ( c )
Clause of Norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs
Specifications n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) ) Remarks
Readymade
Gabion Box Box 1.00
Area 11 m2 2541.00
Sub Total 2541.00
Transportation 0.00
Total Labour Component ( A ) 0.00 Total Material Component ( B ) 2541.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 2541.00
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 381.15
Total Cost: Nrs. 2922.15
Rate : Nrs. 2922.15 per box Rate : Nrs. 1461.08 per cu.m.
44
(20.3 ) Box size 1.5m*1m*1m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs
Specifications n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) ) Remarks
Readymade
Gabion Box Box 1.00
Area 8 m2 1848.00
Sub Total 1848.00
Transportation 0.00
Total Labour Component ( A ) 0.00 Total Material Component ( B ) 1848.00 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 1848.00
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 277.20
Total Cost: Nrs. 2125.20
Rate : Nrs. 2125.20 per box Rate : Nrs. 1416.80 per cu.m.
( 20. 4 ) Box size 2m*1m*0.5m
Respective Clause of Dolidar Labour (A) Material(B) Equipment ( c )
Norms Rate (Nrs) Amount Rate (Nrs) Amount Rate Amount(Nrs
Specifications n. Category Unit Qty. (Nrs) Type Unit Qty. (Nrs) Type Unit Qty. (Nrs) ) Remarks
Readymade
45
Item 21 Providing
Kerb in roadside
and laying of M20 precast cement concrete Kerb 35cm * 20 cm * 30 cm ( H*B*L) with 12 mm thick 1:3 cement sand mortar bedding and joints
including foundation excavation levelling but excluding foundation concrete for foundation or sand gravel material, all complete as per Drawing and
Technical Specifications.
unit 10 m2
Labour (A) Material(B) Equipment ( c ) Remarks
Category Unit Qty. Rate (Nrs)Amount (Type Unit Qty. Rate (Nrs) Amount T
( ype Unit Qty. Rate (NAmount(Nrs)
Ref: Clause 20-40mm
2421 of SS
DoR & S.N. Skilled md 3 1030 3090 agg m3 3.45 3344.95 11540
Concre
Concre
24.21(I) of Unskilled md 30 750.00 22500 10-20mm agm3 1.56 3344.95 5218.12 te te
Norms DoR
5-10mm aggm3 0.72 3213.21 2313.51 vibrato
mixer hr 6 362 2172
coarse sand m3 3 3213.21 9639.63 r hr 6 50 300
cement ton
2.5 16500 41250
boulder stonm34.4 2577.877 11343
Sub Total 81304
Transportation 0
Total Labour Component ( A ) 25590 81304 Total Equipment Component ( 2472
Sub Total (A+B+C ) : Nrs. 109366
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 16404.9
46
Total Cost: Nrs. 125770.9
Rate : Nrs. 12577.09 per m
47
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and Specifications 60% M 15 concrete and 40% boulders/stones
22.B
without machine
unit 1 m2
Labour (A) Material(B) Equipment ( c ) Remarks
Ref: Clause
2421 of SS Category Unit Qty. Rate (Nrs) Amount (NType Unit Qty. Rate (Nrs) Amount (NType Unit Qty. Rate (NrAmount(Nrs)
DoR & S.N.
24.21(II) of
Norms DoR
Skilled md 1 1030 1030 20-40mm aggm3 0.156 3344.95 521.8122
Unskilled md 4 750 3000 10-20mm aggm3 0.072 3344.95 240.8364
5-10mm agg m3 0.299 3213.21 960.7498
coarse sand m3 0.299 3213.21 960.7498
cement ton 0.185 16500 3052.5
boulder stone m3 0.44 2577.877 1134.266
Sub Total 6870.914
Transportation 0
Total Labour Component (A) 4030 (B) 6870.914 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 10900.9139
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 1635.13708
Total Cost: Nrs. 12536.051
Rate : Nrs. 12536.051 per m3
unit 300 sq m
Ref: Clause Labour (A) Material(B) Equipment ( c ) Remarks
2404 of SS Category Unit Qty. Rate (Nrs) Amount (NType Unit Qty. Rate (Nrs) Amount (N
Type Unit Qty. Rate (NrAmount(Nrs)
DoR & S.N. Skilled md 1 1030 1030 0
24.5 of Norms Unskilled md 2 750 1500 Geo textile m2 360 72 25920
DoR ton 0 0
lt 0
Sub Total 25920
Transportation 0
Total Labour Component ( A ) 2530 Total Material Component ( B ) 25920 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 28450
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 4267.5
Total Cost: Nrs. 32717.5
Rate : Nrs. 109.058 per m2
48
Item 24 painting work on road
24.A
Road marking with hot applied Thermoplastic compound with reflectorizing glass beads on bituminous surface with all complete as
technical specification.
unit 400 m2
Labour (A) Material(B) Equipment ( c ) Remarks
Ref: Clause 1504 of SS Category Unit Qty. Rate (Nrs) Amount (Nrs)Type Unit Qty. Rate (Nrs) Amount (NrsType Unit Qty. Rate (Nrs)Amount(Nrs)
DoR & S.N. 15.9 of
Norms DoR Skilled md 2 1030 2060 thermoplastic ltr 930 509.00 473370 road
marking
machine hr 10
Unskilled md 4 750 3000 glass bed kg 100 150 15000 881 8810
0 0
0 0 trollley hr 10 1182 11820
Sub Total 488370
Transportation 0
Total Labour Component ( A ) 5060 Total Material Component ( B ) 488370 Total Equipment Component ( C) ) 20630
Sub Total (A+B+C ) : Nrs. 514060
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 77109
Total Cost: Nrs. 591169
1477.9225
24.B
Providing required material and Painting lines, dashes, arrows etc. on roads in two coats on work with ready
mixed road marking paint conforming to NS 408/ IS 164 on bituminous surface, including cleaning the surface of
all dirt, dust and other foreign matter, demarcation at site and traffic control as per Drawing and Technical
Specifications.
unit 10 m2
Labour (A) Material(B) Equipment ( c ) Remarks
Category Unit Qty. Rate (Nrs) Amount (Nrs)Type Unit Qty. Rate (Nrs) Amount (NrsType Unit Qty. Rate (Nrs)Amount(Nrs)
Ref: Clause 1503 of SS Skilled md 1 1030 1030 enamel paint lt 1.48 509.00 753.32
DoR & S.N. 15.7 of
Norms DoR
Unskilled md 2 750 1500 0
0 0
0 0
Sub Total 753.32
Transportation 0
Total Labour Component ( A ) 2530 Total Material Component ( B ) 753.32 Total Equipment Component ( C) )
Sub Total (A+B+C ) : Nrs. 3283.32
Contractor 's Miscellaneous Overhead Expensed ( 15 % ): Nrs. 492.498
Total Cost: Nrs. 3775.818
Rate : Nrs. 377.5818 per m2
49
per cu.m.
per cu.m.
50
per cu.m.
per cu.m.
per cu.m.
51
Remarks
Remarks
52
SUMMARY OF ROAD RATE ANALYSIS
TARKESHWOR MINICIPALITY
Offce of theMunicipal Executive
Dharmsthali , Kathmandu, State No.3
SUMMARY OF RATE ANALYSIS
(Fiscal Year - 2077/078)
F.Y. 2075/2076 F.Y. 2076/077 F.Y. 2077/078
Page
Item no. Description of Work Unit Users Rate
(Excluding
Contractor Users Rate
Rate (Including (Excluding
Contractor
Rate (Including
Users Rate
(Excluding
Contractor
Rate (Including nos.
Remarks
Page 53
SUMMARY OF ROAD RATE ANALYSIS
6.1 In 1:4 c/s mix ratio Cu M 15408.72 17720.03 15731.22 18090.91 15731.22 18090.91 15
Page 54
SUMMARY OF ROAD RATE ANALYSIS
6.2 In 1:6 c/s mix ratio Cu M 15021.52 17274.75 15355.12 17658.39 15355.12 17658.39 16
7.0 Plastering work
12.5 mm th. plastering with cement sand mortar on brick walls of
concrete surfaces.
a) In 1:4 c/s mix ratio Sq M 352.50 405.37 368.63 423.93 368.63 423.93 16
b) In 1:6 c/s mix ratio Sq M 344.51 396.19 360.94 415.08 360.94 415.08 17
8.0 8.1 Pointing work in cement sand mortar on brick & stone wall with all
169.83 195.30 179.56 206.49 179.56 206.49
necessary operations in 1:3 c/s mix ratio Sq M 17
9.0 Other costruction work
9.1 Dry brick/ stone soling.
a) Flat Brick Sq M 953.88 1096.96 962.38 1106.73 962.38 1106.73 18
b) On edge Brick Sq M 1636.89 1882.42 1660.14 1909.16 1660.14 1909.16 18
C Stone soling work (15cm thick ) Sq M 852.70 980.61 877.20 1008.78 877.20 1008.78 19
Stone filling in the foundations and levelling including haulage
4143.45 4764.97 4218.45 4851.22 4218.45 4851.22
D distance up to 30 m. Cu M 19
Structural work in Road way
10.0 Retaining / protection wall work
Stone Masonry Work Un-coursed Rubble Masonry
10.1 In Dry wall Cu M 4365.66 5020.51 4475.66 5147.01 4475.66 5147.01 19
10.2 In Stone wall 1:4 c/s mix ratio Cu M 10004.99 11505.74 10234.87 11770.10 10234.87 11770.10 20
10.3 In Stone wall 1:6 c/s mix ratio Cu M 9732.71 11192.62 9972.77 11468.68 9972.77 11468.68 20
11.0 Formwork with timber /ply wood as material .
Providing preparing and instaling form work and removing after
completion work
11.1 Foundation & footing work Sq M 638.81 734.63 659.31 758.21 659.31 758.21 21
11.2 wall work Sq M 768.53 883.81 794.93 914.17 794.93 914.17 21
11.3 Lintel , Beam & slab structure work Sq M 833.95 959.04 859.05 987.90 859.05 987.90 22
12.0 Reinforcement for Rcc work ( Tor Steel )
12.1 Type ( A ) for Crank type along bar ( tor steel ) Kg 102.77 118.19 96.33 110.78 96.33 110.78 22
12.2 Type ( B ) for Plain straight bar ( tor steel ) for common use Kg 96.96 111.50 90.10 103.62 90.10 103.62 23
12.3 Type ( C) for C type hook bar ( tor steel ) Kg 99.86 114.84 93.22 107.20 93.22 107.20 23
12.4 Type ( D) for stirups ( tor steel ) Kg 114.39 131.55 108.79 125.11 108.79 125.11 23
13.0 Cement Concrete Work.
13.1 A) In foundation
a) M 10 Grade ( 1:3:6 ) mix by volume. Cu M 11396.61 13106.11 11553.71 13286.77 11553.71 13286.77 24
b) M 15 Grade ( 1:2:4 ) mix by volume. Cu M 12904.72 14840.43 13032.82 14987.74 13032.82 14987.74 24
13.2 In superstructural components ( beam,slab, abutment, caps etc.)
a) M 15 Grade ( 1:2:4 ) mix by volume. Cu M 13604.72 15645.43 13782.82 15850.24 13782.82 15850.24 25.0
b) M 20 Grade ( 1:1.5:3 ) mix by volume. Cu M 14970.61 17216.20 15126.11 17395.02 15126.11 17395.02 25
Page 55
SUMMARY OF ROAD RATE ANALYSIS
17.1 Box sizes 2m*1m*1m Box 3198.02 3677.72 3182.70 3660.11 3182.70 3660.11 31
17.2 Box sizes 3m*1m*1m Box 4630.42 5324.98 4608.10 5299.32 4608.10 5299.32 31
17.3 Box sizes 2m*1m*0.5m Box 2229.04 2563.40 2217.60 2550.24 2217.60 2550.24 31
17.4 Box sizes 3m*1m*0.5m Box 3257.18 3745.76 3240.70 3726.81 3240.70 3726.81 32
17.5 Box sizes 2m*1m*0.3m Box 1846.76 2123.77 1837.10 2112.67 1837.10 2112.67 32
17.6 Box sizes 3m*1m*0.3m Box 2704.00 3109.60 2689.60 3093.04 2689.60 3093.04 32
18.0 Assembling of wire crates/gabion/revetment and placing them in
position.
Using Medium class wire
Binding wire 12 swg.
18.1 Box sizes 2m*1m*1m Box 160.85 184.98 162.50 186.88 162.50 186.88 33
18.2 Box sizes 3m*1m*1m Box 231.60 266.33 234.00 269.10 234.00 269.10 33
18.3 Box sizes 2m*1m*0.5m Box 121.10 139.27 122.50 140.88 122.50 140.88 33
18.4 Box sizes 3m*1m*0.5m Box 160.85 184.98 162.50 186.88 162.50 186.88 31
18.5 Box sizes 2m*1m*0.3m Box 108.95 125.29 110.00 126.50 110.00 126.50 34
18.6 Box sizes 3m*1m*0..3m Box 155.70 179.06 157.50 181.13 157.50 181.13 34
Page 56
SUMMARY OF ROAD RATE ANALYSIS
18 A Gabion wall all complete work ( including fabrication , packing stone & assembling of wire crates with using
Heavy class wire as above specification)
18A 1 Unit per Box from
items no
a) Box sizes 2m*1m*1m ( 2 m3 ) 10626.90 12220.93 10891.08 12524.74 10891.08 12524.74 14,15,16
Box
b) Box sizes 3m*1m*1m ( 3 m3 ) 15998.56 18398.34 16181.77 18609.03 16181.77 18609.03
Box
c) Box sizes 2m*1m*0.5m ( 1 m3 ) 6090.90 7004.54 6161.76 7086.03 6161.76 7086.03
Box
d) Box sizes 3m*1m*0.5m ( 1.5 m3 ) 9025.48 10379.30 9122.77 10491.19 9122.77 10491.19
Box
18A2 Unit per Cu. m.
a) Box sizes 2m*1m*1m 5313.45 6110.47 5445.54 6262.37 5445.54 6262.37
Cu M
b) Box sizes 3m*1m*1m 5332.85 6132.78 5393.92 6203.01 5393.92 6203.01
Cu M
c) Box sizes 2m*1m*0.5m 6090.90 7004.54 6161.76 7086.03 6161.76 7086.03
Cu M
d) Box sizes 3m*1m*0.5m 6016.98 6919.53 6081.85 6994.12 6081.85 6994.12
Cu M
19 Hume pipe work
Laying fitting and fixing of hume pipe having a length of 1 m of
more.
Rcc Hume pipe - NP2
A For one or first pipe.
a1 Pipe having 150 mm diameter. R.m 595.50 684.83 626.25 720.19 626.25 720.19 35
a2 Pipe having 300 mm diameter. R.m 1303.00 1498.45 1372.50 1578.38 1372.50 1578.38 35
a3 Pipe having 450 mm diameter. R.m 1869.00 2149.35 1964.50 2259.18 1964.50 2259.18 35
a4 Pipe having 600 mm diameter. R.m 2785.00 3202.75 2927.50 3366.63 2927.50 3366.63 36
a5 Pipe having 900 mm diameter. R.m 5801.00 6671.15 6097.50 7012.13 6097.50 7012.13 36
19.b b For every subsequent pipe having a length of minimum 1m
b1 Pipe having 150 mm diameter. R.m 615.67 708.02 644.21 740.84 644.21 740.84 36
b2 Pipe having 300 mm diameter. R.m 1390.74 1599.35 1459.60 1678.53 1459.60 1678.53 37
b3 Pipe having 450 mm diameter. R.m 1956.74 2250.25 2051.60 2359.33 2051.60 2359.33 37
b4 Pipe having 600 mm diameter. R.m 3107.90 3574.09 3252.18 3740.01 3252.18 3740.01 38
b5 Pipe having 900 mm diameter. R.m 6561.67 7545.92 6877.73 7909.39 6877.73 7909.39 38
19 c Rcc Hume pipe-Np3
Laying fitting and fixing of hume pipe having a length of 1 m of
more.
For one or first pipe.
c1 Pipe having 150 mm diameter. R.m 1362.90 1567.34 1431.75 1646.51 1431.75 1646.51 39
c2 Pipe having 300 mm diameter. R.m 3093.00 3556.95 3252.50 3740.38 3252.50 3740.38 39
c3 Pipe having 450 mm diameter. R.m 4392.00 5050.80 4612.50 5304.38 4612.50 5304.38 39
c4 Pipe having 600 mm diameter. R.m 6080.00 6992.00 6387.50 7345.63 6387.50 7345.63 40
c5 Pipe having 900 mm diameter. R.m 11838.00 13613.70 12434.50 14299.68 12434.50 14299.68 40
Page 57
SUMMARY OF ROAD RATE ANALYSIS
d1 Pipe having 150 mm diameter. R.m 1358.67 1562.47 1422.21 1635.54 1422.21 1635.54 40
d2 Pipe having 300 mm diameter. R.m 3180.74 3657.85 3339.60 3840.53 3339.60 3840.53 41
d3 Pipe having 450 mm diameter. R.m 4479.74 5151.70 4699.60 5404.53 4699.60 5404.53 41
d4 Pipe having 600 mm diameter. R.m 6402.90 7363.34 6712.18 7719.01 6712.18 7719.01 42
d5 Pipe having 900 mm diameter. R.m 12598.67 14488.47 13214.73 15196.94 13214.73 15196.94 42
20.0 A Gabion Wall work ( Machine made maccaferi Box )
Fabricated Gabion boxes by Meachine weaving Mechanically
Selvedged double twist wire mesh all complete work. Hexogonal
mesh size 100*120 Gabion of 3 mm mesh and 3.9 salvegde with
2.4 mm lacing of Heavy galvanized(ZN)
A.1 Using Heavy class wire
a) Box sizes 2m*1m*1m Box 2090.70 2404.31 2541.00 2922.15 2541.00 2922.15 44
b) Box sizes 3m*1m*1m Box 2918.70 3356.51 3696.00 4250.40 3696.00 4250.40 44
c) Box sizes 1.5m*1m*1m Box 1676.70 1928.21 1848.00 2125.20 1848.00 2125.20 45
d) Box sizes 2m*1m*0.5m Box 1469.70 1690.16 1732.50 1992.38 1732.50 1992.38 45
e) Box sizes 3m*1m*0.5m Box 2090.70 2404.31 2541.00 2922.15 2541.00 2922.15 45
A2 Gabion wall all complete work ( including fabrication , packing
stone & assembling of wire crates with using Heavy class wire as above
specification)
Unit per Box
a) Box sizes 2m*1m*1m ( 2 m3 ) Box 9388.03 10796.23 9955.33 11448.63 9955.33 11448.63
b) Box sizes 3m*1m*1m ( 3 m3 ) Box 13864.69 15944.40 14817.49 17040.12 14817.49 17040.12
c) Box sizes 1.5m*1m*1m ( 1.5 m3 ) Box 7149.70 8222.15 7408.75 8520.06 7408.75 8520.06
d) Box sizes 2m*1m*0.5m ( 1 m3 ) Box 5118.36 5886.12 5439.66 6255.61 5439.66 6255.61
e) Box sizes 3m*1m*0.5m ( 1.5 m3 ) Box 7563.70 8698.25 8101.75 9317.01 8101.75 9317.01
A3 Unit per Cu. m.
a) Box sizes 2m*1m*1m ( 2 m3 ) Cu M 4694.01 5398.12 4977.66 5724.31 4977.66 5724.31
b) Box sizes 3m*1m*1m ( 3 m3 ) Cu M 4621.56 5314.80 4939.16 5680.04 4939.16 5680.04
c) Box sizes 1.5m*1m*1m ( 1.5 m3 ) Cu M 4766.46 5481.43 4939.16 5680.04 4939.16 5680.04
d) Box sizes 2m*1m*0.5m ( 1 m3 ) Cu M 5118.36 5886.12 5439.66 6255.61 5439.66 6255.61
e) Box sizes 3m*1m*0.5m ( 1.5 m3 ) Cu M 5042.46 5798.83 5401.16 6211.34 5401.16 6211.34
Page 58
SUMMARY OF ROAD RATE ANALYSIS
Page 59
SUMMARY OF ROAD RATE ANALYSIS
25.2 Preparation of sub-grade for rehabilitation or other similar works 30.21 30.21 50
cum 25.14 28.90 26.27 26.27
(filling or cutting depth of 10 to 20 cm) in:
25.7 Providing, mixing, laying and compaction of premixed carpet cum 15323.9161 17613.6966 15840.72 18216.83 15840.72 18216.83 53
25.8 Providing and laying sand seal (for 10sqm) sqm 127.324448 146.34994 130.96 150.60 130.96 150.60 54
25.9 Providing, mixing, laying asphalt concrete with compaction cum 17866.48 20536.1788 18266.77 21006.78 18266.77 21006.78 55
Page 60