Notes.

EXTENT OF VANDEX BB75E WATERPROOFING


SLURRY TO GRADE 3 SLAB

EXTENT OF VANDEX BB75E WATERPROOFING


SLURRY TO GRADE 3 WALLS.
WATERPROOFING EXTENDED TO MINIMUM
1.0m HEIGHT FROM SLAB LEVEL.
(REFER TO SECTION 9 ON DRAWING 0100)

EXTENT OF VANDEX BB75E TO GRADE 3


WALLS. WATERPROOFING TO FULL HEIGHT
OF WALL AND RETURNED A MINIMUM OF 1.0m
ALONG THE SOFFIT.
(REFER TO SECTION 10, 12 & 13 ON DRAWING
0100 & 0101)
NOTE: WATERPROOFING IN WASH/SHOWER ROOM
AREA TO BE ALLOWED TO CURE FOR MINIMUM 48
HOURS THEN PROTECTED WITH FLOWCRETE ISOPOL
SBR - A STYRENE BUTADIENE (SBR) POLYMER LATEX
SCREED ADDITIVE AND BONDING AGENT.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 WATERPROOFING IN ALL OTHER AREAS TO BE


ALLOWED TO CURE FOR MINIMUM 48 HOURS THEN
PROTECTED WITH FLOWCRETE FLOWCOAT SF41 AND
ANCILLARY ITEMS.

THE LOCATION OF TYPICAL DETAILS ARE NOT SHOWN


ON DRAWING 0005 AND SHOULD BE COORDINATED
WITH FOLLOW ON TRADES TO INSTALL THE FIXINGS
ONCE THE WATERPROOFING IS COMPLETED.

G Existing UKPN
room construction
UKPN Room
to be retained &
upgraded as
necessary.
120minute fire
rating required. UP

H
9
27.12m2 0100

DN 6 11
0100 0101
2
J 0100

Cycle Store
13 7
0101 6 0100
0100

K
295.00m2
VEHICLE ROUTE TO CAR PARK BENEATH
8
NORFOLK HOUSE - GRADE 1/2
0100
Roller Shutter
Cycle Store

L 12
0101

Car Ramp
M S3 P06 04.01.23 Section ref added AH | AH | PW | PW
S3 P05 16.12.22 General waterproofing extend updated AH | AH | PW | PW
1 S3 P04 29.11.22 General waterproofing extend updated AH | AH | SW | PW
0100 S3 P03 24.11.22 Revised as clouded AH | AH | SW | PW
N S3 P02 13.10.22 Revised as clouded AH | AH | SW | PW
Y 10 Cycle Store S3 P01 21.09.21 First issue AH | AH | SW | PW
0100 BASEMENT BELOW
BASEMENT BELOW STATUS REV DATE REVISION HISTORY DSG | DRW | CHK | APP
Cycle Sto rging points

Cycle Store NORFOLK HOUSE


NORFOLK HOUSE NOT
NOT ALL REVISIONS
CLIENT
WITHIN SCOPE
WITHIN SCOPE OF
OF WORKS
WORKS
Cha
re
Electric

P
Z Pa
Pb
BB
Pc
CC
DD
Q R KEY PLAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

AA EE G

H
UP

N
Y

P
Z

Q
AA

16 17 18 19 20 21 22

ORIGINATOR

16 17 18 19 20 21 22 Part of the STRI Group


Warrington Business Park
Long Lane
Warrington
T: 01925 652 980
F: 01925 652 983
W: www.epg-ltd.co.uk

PROPOSED BASEMENT
E: consultantrequest@epg-ltd.co.uk
The Environmental Protection Group Ltd © The Environmental Protection Group Ltd

DRAWING TITLE

WATERPROOFING LAYOUT MILLENIUM BRIDGE HOUSE


LONDON
WATERPROOFING GA LAYOUT

Name Signature Date


Designed by AH 04/01/2023
Drawn by AH 04/01/2023
Checked PW 04/01/2023
Approved PW 04/01/2023

EPG REF SCALE @ A1 BIM FILE NAME - REVISION


9443 1:200 -
S3 - Suitable for Internal Review & Comment

PROJECT ISSUER VOLUME LEVEL TYPE ROLE NUMBER REV

9443 EPG XX B1 DR Y 0005 P06