Job Safety Analysis (JSA) (Level 2)

JSA Title / Task Description: Pump seal/bearing replacement


JSA #   Attachments: YES / NO. If YES state number of attachments  0
Area:  PAU Job Location: Veolia - WTS RO UNITS – PHASE 1 & 2
JSA Team Leader Name & ID:  Yadhukula Babu, 20815 Department: PAU Operation  Date:  07. Mar 2023
PPE Required: Gloves, Goggles, FRC clothes, Earplugs, safety footwear, High visible vest, and helmet.

JOB SAFETY ANALYSIS (to be filled out by Operations/Maintenance Staff or Team Leader together with JSA Team Members)

Sr. No. Sequence of Job Steps to be Per- Potential Hazards Risk Control Measures Remaining Action By
formed Level Risk Level
1. Pre task meeting and 1.1 Miscommunication / lack of M 1.1.1 Obtain valid work permit L Suez/
preparation of the activity. planning and coordination. 1.1.2 Conduct TBT to include Aquatreat
JSA findings, safe work method,
hazards, and control measures.
1.1.3 Ensure take5 form to be
filled up prior to start the job and
JSA sign off sheet to be filled.
1.1.4 only trained and competent
employees are authorized to do
the maintenance work.
2. Preparing the pump for 2.1 Injury /Electric Shock during M 2.1.1 Ensure that all electrical L Suez/
handover. Electrical & pump dismantling due to equipment isolated and that Aquatreat
Mechanical isolations improper electrical isolation Lock-Out/Tag-Out system has
been implemented on it.
2.2 Exposure to sea water /
2.1.2 Field engineer shall cross
mixed chemical water solutions check isolation by pressing start
due to improper isolation. button before commencing of
2.3 Physical injury to workers job.
2.2.2 Ensure that all valves
mechanically isolated and that
Lock-Out/Tag-Out system has
been implemented on it
2.3.1 Use correct tools.
2.3.2 Ensure that tools are inspected
and color coded.
2.3.3 Use mandatory PPEs.
3. Blinding of pump 3.1 Exposure to sea water / M 3.1.1 Ensure that the valves have L Suez/
suction/discharge lines mixed chemical water solutions been properly isolated. Aquatreat

MSHEM-02.11-C
Job Safety Analysis (JSA) (Level 2)
JSA Title / Task Description: Pump seal/bearing replacement
JSA #   Attachments: YES / NO. If YES state number of attachments  0
Area:  PAU Job Location: Veolia - WTS RO UNITS – PHASE 1 & 2
JSA Team Leader Name & ID:  Yadhukula Babu, 20815 Department: PAU Operation  Date:  07. Mar 2023
PPE Required: Gloves, Goggles, FRC clothes, Earplugs, safety footwear, High visible vest, and helmet.

Sr. No. Sequence of Job Steps to be Per- Potential Hazards Risk Control Measures Remaining Action By
formed Level Risk Level
suction/discharge lines 3.2 Injury due to improper 3.1.2 Use mono goggles during the
tool/lifting methods activity.
3.2.1 Use certified and right capacity
slings/chains (if required)
3.2.2 Use correct hand tools
3.2.3 Use mandatory PPEs
4 Pump Coupling guard removal and 4.1 Injury during pump M Same control measures in step 2 L Suez/
decoupling dismantling due to improper Aquatreat
electrical isolation
5 Pump Removal/Opening: 5.1 Injury to workers. M 5.1.1 Use correct tools L Suez/
Coupling hub removal 5.2 Health hazard due to 5.1.2 Use mandatory PPEs. Aquatreat
Opening bearing housing and handling oil/grease 5.1.3 Proper lifting procedure to be
bearing removal followed if applicable.
Dismantling seal assembly 5.2.1 Use Chemical resistant gloves.
Cleaning of seal flush lines 5.2.2 Wash hands after job.
5.2.3 Dispose all oily rags in accor-
dance with Maaden procedure.
6 Pump Assembling installation, de- As above M As above L Suez/
blending, warm-up, alignment, Aquatreat
checking & coupling

Area Owner / JSA Team Leader: The team have reviewed all job steps of EHSS Role: I have reviewed and agreed with all steps of this JSA
this job through this JSA
Name & ID: Dept.:
Name & ID: Yadhukula Babu, 20815 Dept.: PAU

Sign: Date:

MSHEM-02.11-C
Job Safety Analysis (JSA) (Level 2)
JSA Title / Task Description: Pump seal/bearing replacement
JSA #   Attachments: YES / NO. If YES state number of attachments  0
Area:  PAU Job Location: Veolia - WTS RO UNITS – PHASE 1 & 2
JSA Team Leader Name & ID:  Yadhukula Babu, 20815 Department: PAU Operation  Date:  07. Mar 2023
PPE Required: Gloves, Goggles, FRC clothes, Earplugs, safety footwear, High visible vest, and helmet.

Sign: Date:
Work crew undertaking the task: Contractor/ Operator/ Technician or any other Operation Supervisor: I have reviewed and agreed with all steps of this JSA
team role: I have reviewed and agreed with all steps of this JSA
Name & ID: Dept.:
Name & ID: Abdullah Abed, 36497 Dept.: Veolia
Sign: Date:
Sign: Date:
Name & ID: Dept.:
Sign: Date: Area Owner Manager: Job steps and remaining risks read and agreed (Only to be
Name & ID: Dept.: signed by the Area Owner Manager when any of the remaining risks is Moderate).

Sign: Date: Name & ID: Dept:


Sign: Date:

Area Owner Director: Job steps and remaining risks read and agreed (Only MPC President: Job steps and remaining risks read and agreed (Only to be
to be signed by the Area Owner Director when any of the remaining risks is signed by MPC President when any of the remaining risks is Extreme).
High).
Name & ID: Dept:
Name & ID: Dept:
Sign: Date:
Sign: Date:

MSHEM-02.11-C
Job Safety Analysis (JSA) (Level 2)
JSA Title / Task Description: Pump seal/bearing replacement
JSA #   Attachments: YES / NO. If YES state number of attachments  0
Area:  PAU Job Location: Veolia - WTS RO UNITS – PHASE 1 & 2
JSA Team Leader Name & ID:  Yadhukula Babu, 20815 Department: PAU Operation  Date:  07. Mar 2023
PPE Required: Gloves, Goggles, FRC clothes, Earplugs, safety footwear, High visible vest, and helmet.

JSA SIGN OFF SHEET

All personal involved in performing the work shall enter their names below and sign the sheet to confirm that they have read, understood, and will comply with the
conditions of the JSA

Sr. No. Name Role In Team ID Number Signature Date & Time

1
2
3
4
5
6
7
8
9
10

Supervisor (Execution Team) Name: Signature: Date:

MSHEM-02.11-C