GANGA EXPRESSWAY PROJECT (GE-4)

“Camp Area Inspection Checklist”

Document No Health Safety Environment

Camp Site Name: Date:-_______/_______/________


Joint Inspection by HSE, HR & Admin and Project Manager nominated person
Particulars Yes No Remarks
Camp Responsibilities
Are Camp Boss appointed and records available with him?
Units Numbered
Occupant updated register
Camp Area
Are the open drain cleaned?
Recreation space like playground available
Whether proper fencing of the camp is done?
Water Supply
Adequate water supply Are the water tank cleaned and date of cleaning and due date
mentioned on Tank
Whether all the drains and channels are covered?
Drinking water tested as per IS 10500
Shelters
Structurally sound, in good repair, sanitary
Flooring is of rigid material; prevents entrance of
ground and surface water; reasonably level
Separate sleeping area for each sex or family
Any sick person observed in rooms
Fire & Safety
Sufficient extinguisher’s at camp area
Are all the first aid facilities provided in the camp?
Ventilation/Lighting/Electricity
Adequate ventilation and natural lighting
Adequate electrical service
Adequate area lights in camp
Domestic and industrial plug sockets as per need
Industrial distribution board with 30 mA elcb and cable routing- confirming to
electrical requirement
Toilet Facilities
Are the toilet cleaned & Are in sufficient numbers? [ 01 Toilet for 12 Workmen] ,
Females Toilet provided
Are the bathing place cleaned and separate space for females provided?
Garbage & Refuse
Are the passages or walkways cleaned?
Are the lime / bleaching powder sprinkled?
Are the sufficient dust bin provided, cleaned and how frequent disposal done?
Insects, Rodents, Vermin
shelters and common facilities free of insects, rodents, vermin
Whether the workers are well aware of cleanliness, Hygiene, community livings,
AIDS etc.?
Whether green belt is provided and maintain?
Note – Approved camp layout plan shall be implemented
Joint Inspection by HSE HR & Admin Project I/C Nominated Person Project I/C

Sign
Name
Date