Adobe Scan 25 Apr 2023

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ANALYSIS(Observed Data Only)

DATA nira thodu to


from Srccraman
Monsoon/2022-Clearing kulavazha
GENERAL-MIC GP-General Civil Work
Kannanchira thodu in Thannyam

Description/Remarks
SOR/SPec MR code \mount Label
Quantity Rate
Code Unit

|:APPENDIX A
1.001-Specification code: OD4748/2022-2023
substance from the
Clearing kulavazha, deep rooted weeds and other types of floatingaway from e periphery of the
in places
canal/stream in or under water and depositing the sanmedepartmental
area cleared with all leads and lifts as directed by the officer at 1te
For clearing Isqm kulavazha.deep rooted weeds and floating substances
Labou
0114
Beldar
Day 0.01250 558.00 6.98 L1

Tools& Plants(Hire charges)


Hire charge for 3rd class boat with boatman
MR
|Day 0.00300| 800.00 2.40 T1
Total L.000 Sqni 9.38
Unit Total 1.000 Sqm 9.38
Add Water Charge 9 38 (@1.00% 0.09
Total 9.47
Add Contractors Profit & Overhead 9.47 (u15.00% 1.42
Total 10.89
Add Cost Index 8.11 (@35.59% 2.89
Total 13.78
GRAND TOTAL sqm 13.78.
Note

You might also like