Crane Repair Plan
Crane Repair Plan
Option 1: Remove existing engine and gearbox and replace with compatible
1 units with ECUs
3 Hydraulic Pump
6 Tyres
9 Hydraulic Hoses
12 Engine hood
Due Date Responsible Person Comments
CRAC
Technologies/H.Gwaze To be determined by Gearbox to be used
The Hydraulic Oil had been purchased for the
Crane. Part of it was sent to the machines in
Ngezi and the remainder was used in the
H.Gwaze workshop on the Bending machine
Costs to be established .
Costs to be established