REJECTION CONVEYOR LINE #3

SR. NO. DATE MANTENANCE TYPE DESCRIPTION OF JOB

1 2-May-23 PREVENTIVE ALL RETURN ROLLER CHECKED.

DRIVE CHAIN BROKEN. ADD TWO LINKS, MAKE


2 4-May-23 BREAKDOWN
JOINT AND STARTED.

3 5-May-23 PREVENTIVE CONVEYOR SPROCKET/CHAIN ALIGNMENT


WORK.NEW SPARE CHAIN PREPARED.
CONVEYOR STOPPED DUE TO CHAIN
4 10-May-23 BREAKDOWN
FALLEN.CHAIN FITTED AND STARTED.
5 18-Jul-23 PREVENTIVE DRIVE CHECKED
6 21-Jul-23 PREVENTIVE MAINTANANCE OF CONVEYOR
7 25-Jul-23 PREVENTIVE MAINTANANCE OF CONVEYOR DRIVES.
VEYOR LINE #3
PARTS REPLACED PERSON NAME REMARKS

NO SURVE,SATPUTE

TIME DURATION FROM


CHAIN LINKS(2NOS) SURVE,SATPUTE
8:30PM TO 9:30PM

NO ARUN,PRASHANT

NO MOHITE,SALUNKHE

NO MOHITE,MANGESH
NO YADAV,AVINASH
NO SURVE,SATPUTE
SINGLE LINER #3
SR. NO. DATE MANTENANCE TYPE DESCRIPTION OF JOB PARTS REPLACED

1 3-May-23 PREVENTIVE LUBRICATION OF BEARINGS. NO


2 18-May-23 PREVENTIVE LUBRICATION OF BEARINGS. NO
3 25-May-23 PREVENTIVE LUBRICATION OF BEARINGS. NO
4 8-Jun-23 PREVENTIVE LUBRICATION OF BEARINGS. NO
5 18-Jul-23 PREVENTIVE AL GEAR BOX CHECKED NO

ALL DRIVES,SPROCKETS
6 1-Aug-23 PREVENTIVE NO
MAINTANANCE WORK DONE
PERSON NAME REMARKS

MOHITE,MANGESH
MOHITE
YADAV
MOHITE
MOHITE,MANGESH

AMOL,AMOL S.
SHRINK WRAP TUNNEL #3
SR. NO. DATE MANTENANCE TYPE DESCRIPTION OF JOB

TUNNEL PENDING WORK AND BELT


1 19-Jun-23 PREVENTIVE
TENSION ADJUSTMENT.
2 22-Jul-23 PREVENTIVE MAINTANANCE OF TUNNEL
AP TUNNEL #3
PARTS REPLACED PERSON NAME REMARKS

NO SURVE,SATPUTE

NO AMOL ,AMOL S