VABA ALUMINIUM FORMWORK

ANNEXURE
DATE:- 10.07.2023 ASSUMED DATA
CLIENT:- CLEON SHEAR WALL-2950
TYPICAL FLOOR PLAN- 3RD TO 7TH, 9TH TO 14TH, 16TH BEAM HEIGHT 700 MM
PROJECT NAME
TO 20TH SLAB HEIGHT 125MM
2950.00 UPSTAND HEIGHT 1050MM
FLOOR HEIGHT:-
CHAJJA THICK-150 MM
AREA:- SALES AREA CALCULATIONS TOTAL NO FLOORS-22 NOS
SR NO COMPONENT NAME LENGTH WIDTH HEIGHT AREA QUANTITY TOTAL
1 SHEAR WALL 319616.681 2950 942.87 1 942.87
2 BEAM SIDE 483803.681 700 338.66 1 338.66
3 UPSTAND WALL 121853.533 1050 127.95 1 127.95
4 SLAB 289.73 1 289.73
5 BEAM BOTTOM 57.28 1 57.281
6 UPSTAND COVER 8.88 1 8.8834
7 CHAJJA TOP/BOTTOM 64.22 1 64.224
8 SLAB END 65330.259 150 9.80 1 9.7995
9 2ND SET 1 147.15
CONNECTING
10 COMPONENTS 2145.47
1 158.92
STR-1&2
1 WAIST SLAB 4970 1500 7.455 2 14.91
2 STEPS AREA(184+250) 6.944 2 13.888 28.798
2174.27
CLEON SUMMARY
1 TYPICAL FLOOR 1 2145.47
2 STAIRCASE 1 AND 2 1 28.80
TOTAL 2174.27