Sl KPA Status Reason for Activities & Targets Revised Revised
No review Measures / Weightage
Indicators 01 Turnover and On Going Following A. Realisation of RITES fee from following clients Realisation of 15 realisation of fees transfer from are in progress. RITES Fee and HWD/Kolkata 1. Liasion with client MCL for realisation of RITES securing New to Fee bill projects ECRPO/Talcher 2. Visited various upcoming projects of MCL/NTPC like TTPS and Hingula Silo 02 Project Specific Field 1. As CSE for Handidhua ROB and Bhubaneswari Field & office work 15 work/Design/Drawings Ph-2, assigned the work of site supervision, to be done checking & Billing 2. Checked the design as submitted by contractor for the above work and drawing received from HQ 3. Involved in design mix and testing of cement, reinforcement and concrete 03 Project specific reports 1. Prepared daily, weekly and monthly progress Progress Report 10 and Documentation reports for the above two projects preparation and 2.Prepared site appreciation report for the TTPS documentation for during tendering stage billing purpose 3. Certify the quantity for contractor running account bills 04 Management of 1. As Project Engineer, helped MCL in contract Help in Contract 10 Contracts with Clients management for Handidhua ROB work. Management, and sub-consultants 2. As Project Engineer, helped Project co- Outsoucing and engaged for coordinator in contract management for GEM operation outsourcing activities, Bhubaneswari Ph-2 work. including procurement 3. helped in procurement of monthly vehicle from GEM through GEM 05 Shouldering additional Apart from project engineer’s responsibility Other work apart 5 Responsibility 1. Assisted in Topo survey, Soil investigation work from civil Work for TTPS 2. Assisted in securing tender for TTPS from NTPC 3. Responsible for office maintenance at Talcher 06