1 SLUMP CONE ASTM C 143/C 143 M 200 ± 3mm 100 ± 3mm 300 ± 3mm
DIAMETER HEIGHT
PROCEDURE
SLUMP CONE TEST : (ASTM C 143/C 143 M)
Dampen the mold and place it on a flat, moist, Non-absorbent surface and shall be held firmly in
place during filling by operator on two foot Pieces.
Fill the Cone with Concrete in 3 Layers(70mm,160mm,70mm)of Tamping each layer with
25 strokes.
After Top Layer has been rodded, strike of surface of Concrete by Screeding or Rolling Motion of
Tamping rod and remove the concrete from area surrounding base of Slump cone.
Remove the Mold Immediately from Concrete in Vertical direction of Distance 300mm in
5 ± 2s.
Complete the entire Slump Cone test within an Elapsed time of 2.5min.
A sample with a mass of about 20 gms shall be taken mixing portion of material passing 0.425mm.
Place the air-dried Soil in mixing dish and throughly mix with water until the sample becomes Plastic enough to
be easily shaped into ball.
Take a portion of this ball with a mass of about 8gms for the test sample.
If both liquid and Plastic limits, take a test sample with mass of about 8gms from thoroughly wet and mixed
portion of soil prepared in accordance with T-89.
Take the sample at any stage of mixing process at which mass becomes plastic enough to be easily shaped into
ball without sticking to fingers excessively when squeezed.
If the sample is taken before completion of liquid limit test, set it aside and allow to season in air until liquid test
has been completed.
If the sample is too dry to permit rolling to a 3mm thread, add more water and remix.
Select 1.5 to 2.0 gms portion from mass of soil and roll the mass between palm or fingers and the Ground-glass
plate with just sufficient pressure to roll the mass into thread of uniform diameter of 3mm within 2 minutes.
Then split the thread into six to eight pieces and placed it in oven.
MOLDS :
INNER
S.NO APPARATUS OUTER DIAMETER HEIGHT VOLUME
DIAMETER
MOLD-150mm
1 158.75 ± 1.27mm 152.4 ± 0.66mm 116.43 ± 0.13mm 2124 ± 21 cc
(AASHTO T-180)
MOLD-150mm
2 107.95 ± 1.27mm 101.6 ± 0.41mm 116.43 ± 0.13mm 943 ± 8 cc
(AASHTO T-99)
RAMMER :
PROCEDURE
Discard the Coarse material retained on 50mm sieve.
Remove the material from passing 50mm sieve to 19mm sieve retained and it can replace with equal mass of
19mm passing to 4.75mm retained material.
Select a three representative sample with mass of each approximately 6.8 kgs.
Generally 10, 30 and 65blows per Layer are suitable for compacting specimen 1, 2 and 3 respectively.
Thoroughly mix the each representative sample with optimum moisture, Divide the sample into 5 Layers and compact
with 10blows.
Remove the extension collar of the mold and trim the compacted soil with top of mold using straightedge.
Compact the other two 6.8kgs portions following same procedure with 30 and 65 blows respectively.
Immerse the mold into water to allow Free access of water to top and bottom of specimen for 96hrs.
The water level maintain approximately 25mm above the top of specimen.
SAND EQUIVALENT VALUE : (ASTM D 2419)
Prepare the working calcium chloride by diluting 85 ± 5ml to 3.8L of water.
Obtain atleast 1.5kg of 4.75mm Passing material and split or quarter out to required mass.
Fit the siphon assembly with mixture of water and calcium chloride solution at a height of 90 ± 5cm from working surface.
Then pour the one of test specimen into plastic cylinder using funnel to avoid spillage.
Tap the bottom of cylinder sharply on heel of hand several times to release air bubbles and wetting of specimen.
Allow the wetted specimen and cylinder to stand undisturbed for 10 ± 1min.
At the end of 10min soaking, stopper the cylinder, then loosen the material from bottom by partially inverting the cylinder
and shaking it simultaneously.
After Loosening the material from bottom of cylinder, shake the cylinder 90cycles in approximately 30s using a throw of
23 ± 3cm. (Cycle is defined as complete back and forth motion).
Following the shaking operation, set the cylinder upright on the work table and remove the stopper.
Insert the irrigation tube in top of cylinder, remove spring clamp from hose and flushes the fine material into suspension
above coarse sand particles.
Continue to apply stabbing and twisting action while flushing the fines upwards until the cylinder is filled to 15inch
graduation while irrigation tube is being withdrawn.
Allow the cylinder and contents to stand undisturbed for 20min ± 15s.(after withdrawing irrigation tube)
Read the record the level of top of clay suspension(Clay Reading) and place the weighted foot assembly over cylinder and
gently lower the assembly until it comes to rest on sand.
Subtract 10inch from the level indicated by the extreme top edge of indicator and record this value as
"sand reading".