20MM DIA. CONDUIT EMBEDDED ON WALL 20MM DIA. CONDUIT EMBEDDED ON WALL
UTILITY BOX
SWITCH
CONVENIENCE OUTLET
1.40
1.40
0.30
0.30
SERVICE LINE
SERVICE
ENTRANCE
PANEL BOARD
15FT. ABOVE GROUND
CLEARANCE KILOWATT
5.00
METER
M
2.00
FINISH FLOOR LINE
FROM THE OFFICE OF: NO. SEAL PROJECT TITLE APPROVED PER PLAN AND SPECIFICATIONS CAD BY: SHEET CONTENT: SHEET NO
PRC REG. CONVENIENCE OUTLET DETAIL
SWITCH OUTLET DETAIL
VALIDITY SERVICE POLE DETAIL
PTR
NO. AS-BUILT PLAN OF START FUEL STATION PETER T. MONTAUS WIRE SAG LINE E
PROFESSIONAL ELECTRICAL ENGINEER DATE
OWNER 35
PLACE
TN
NO. LOCATION:BRGY.SORIANO,CABADBARAN CITY AGUSAN DEL NORTE ADDRESS: BRGY.SORIANO,CABADBARAN CITY AGUSAN DEL NORTE