Zallaf FastFEED MODQ - Rev B - 2023-03-03 - UOP Clarifications
Zallaf FastFEED MODQ - Rev B - 2023-03-03 - UOP Clarifications
Revision B
February 17, 2023
1 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
SALES QUESTIONNAIRE
2 / 114
Zallaf 2023-02-20: UOP to check the
Geotechnical Report for Seismic Load is 9072962-MODQ-B
Date 2023-01-27 Modular Design Questionnaire
correct.
Client/Owner ZALLAF UOP 2023-03-02:
Zone 1, Ss=0.06, Sl=0.02 (The site is at very
Project Name Zallaf South Refinery
low seismic zone, wind will govern over the
Location Murzuq, Libya seismic)
Unit NHT, Par-Isom Capacity 30,000BPD
Zallaf 2023-02-20: Zallaf will check the wind
SALES QUESTIONNAIRE speed is in compliance with NOC standard and
advise UOP.
DEFAULT REQUESTS (ChangesBasic
Zallaf 2023-02-24: from wind
default)
speed shall be REV
5.0 Seismic and Wind Load taken as 37.5m/s at 10meter above terrain,
UOP's Practice is to design modular units for the following conditions: exposure C
UOP 2023-03-02:
5.1 Wind Load 1. Please confirm if ASCE7-16 is acceptable.
5.1.1 Code ASCE 7-16 ASCE7-16 is the current code specified in PIP A
standard and steel design.
120mph/54m/Sec. (3 Second Gust at 33ft/10m Above 2. If basic wind speed (37.5m/s) was from the code
5.1.2 Wind Speed (NOC) dated before 2010, it is likely for the service A
Grade) level. Wind speed per ASCE7-16 is for the ultimate
strength level. Wind speed (37.5m/s) needs to be
5.1.3 Exposure Category C converted: A
---- Multiply 37.5m/s by SQRT(1.6x1.15) and wind
speed is 50.9m/s per ASCE7-16.
5.2 Seismic Load
----1.6 is for converting the service level to the
5.2.1 Code ASCE 7-16 strength level. A
5.2.2 Seismic Design Category C ----1.15 is for the wind importance factor. A
5.2.3 Site Soil Profile SD Zallaf 2023-02-20: Zallaf will check the Closed A
5.2.4 Importance Factor IE = Fireproofing material and advise UOP later. A
7.1 Area Classification IEC Zone 2 Group IIB + H2, T3 Zallaf 2023-02-22: Outdoor instrument operate A
under emergency shall be certified for zone 1.
UOP 2023-02-27:
Noted. UOP will use Galv. corten A steel with
3 / 114 HDG treatment.
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
SALES QUESTIONNAIRE
7.5 Motors
7.5.1 Duty IEC 34-1 type S1 A
7.5.2 Insulation Class F A
7.5.3 Space Heaters Required on medium and high voltage motors A
IE 3 (Premium Efficiency) in accordance with IEC 60034-
7.5.4 Efficiency (Up to 375 kW) A
30-1
*Client to advise UOP of preferred transport mode to site or restrictions to consider, and to confirm with a Transportation Survey prior start of module design.
4 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
SALES QUESTIONNAIRE
5 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STRUCTURAL SECTION
1.0 Design Codes and Specifications Zallaf 2023-02-24: UOP to use PIP since NOC
1.1 Wind Load ASCE 7-16 standards have not been updated since 1999. A
UOP 2023-02-27: Noted
Basic Design Wind Speed As per CLIENT's information A
3-sec gust A
Occupancy Category(1) III & IV A
Exposure Category(1) C A
6 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STRUCTURAL SECTION
2.0 Civil
2.1 General Civil Design PIP CVC01015 A
2.5 Site Surface Finish Zallaf 2023-02-20: Zallaf mentioned that gravel Closed A
can be applied to "Under pipe rack" and
Process Area Concrete (note2) A
"Non-process area" instead of concrete and
Non-Process Area Concrete (note2) flexible paving should be applied to A
Under Pipe racks Concrete (note2) "Roadways". TR should make a decision for A
Sidewalks Concrete (note2) plant unification and Zallaf will check the other A
projects and advise UOP.
Roadways Concrete (note2) A
Zallaf 2023-02-24: Site surface finish will be
decided during FEED, in order to satisfy
operation and maintenance requirements and
considering cost.
UOP 2023-02-27: Noted
7 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STRUCTURAL SECTION
The following information should be included in the Geotechnical Reports or provided by client:
Shallow foundations Mat foundation A
Allowable Soil Bearing Pressure As per CLIENT's information A
Frost Protection Depth As per CLIENT's information A
Water Table Elevation As per CLIENT's information A
Deep Foundations Driven Piles* A
Pile Diameter & Length As per CLIENT's information A
Pile Capacity (Compression, Tension and Lateral) As per CLIENT's information A
Allowable Differential Settlement As per CLIENT's information A
8 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STRUCTURAL SECTION
3.4 Materials:
W & T Shapes ASTM A992/A572 Gr. 50 A
Structural Plate ASTM A572 Gr. 50 A
Channel/Angle & Misc. Plate ASTM A36 A
HSS- Rectangular ASTM A500, GR.C A
HSS-Round ASTM A500, GR.C A
HSS-Pipe ASTM A53, GR.B A
Origin of Steel Please specify any exclusion(s) No Restrictions A
High Strength Structural Bolt Material
ASTM F3125, Group A – Grade A325 A
Common Bolts ASTM A307 Grade A, 5/8” (16mm) & Smaller A
Foundation Anchor Bolts ASTM F-1554, Grade 55 A
Welding per AWS D1.1 E70xx electrodes A
Gratings 1 ½” A
Serrated A
ASTM A1011/A1011M or EQ A
Checkered Plates 1/4” ( 6 mm) A
Raised Pattern A
ASTM A36 or EQ Zallaf 2023-02-20: Zallaf will check the Closed A
Fireproofing material and advise UOP later.
Fireproofing of Structural Steel (Columns, Perimeter beams &
Pyrocrete 241: (55pcf) A
Major Equipment support beams)(3) Zallaf 2023-02-24: Accepted.
UOP 2023-02-27: Noted
Hours of Fire Rating 1 Hour A
Height of Structure requiring fireproofing
30ft (9m) A
9 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STRUCTURAL SECTION
Note (2)
Concrete paving types are: JPCP-Jointed plain, JRCP-Jointed reinforced, and RCCP-Roller compacted.
Note (3)
* Major equipment such as: **********
* Vertical bracings need fireproofing if support gravity loads.
* For Air Fin cooler Structure Fire Proofing shall be up to top of Air Fin cooler support.
10 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
11 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
12 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
13 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
14 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
15 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
16 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
17 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
18 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
19 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
3.5 Grounding of Instrument Shield At I/O location Zallaf 2023-02-24: Noted. Instrument earth from Closed A
one end at cabinet.
UOP 2023-02-27: Noted.
20 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
21 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Zallaf 2023-02-24: Symbols, legend and typical Capacity 30,000BPD
shall be subject to Company approval. UOP
INSTRUMENTATION SECTION shall prioritize the submittal of relevant sheets.
UOP 2023-02-27: UOP Process is designed
DEFAULT suitable
REQUESTS for(Changes
Zone 2 as welldefault)
from as the equipment REV
and material selection.
5.2 Instrument Tagging Please provide the reason why Zone 1 should
be applied.
UOP UOP Basic Engineering P&ID depict
Customer accepts UOP standard A
Rotameters as FIF ( option to change to FI)
Zallaf 2023-02-22: Company Tagging procedure Closed
UOP UOP Basic Engineering P&ID depict skin UOP 2023-02-27: Noted.
thermocouples/RTD’s as TXE (option to change to Customer accepts UOP standard A
TE and indicate “skin” on P&ID).
UOP UOP Basic Engineering P&ID depicts Limit
Switch and position as ZSL/ZSH (option to change Customer accepts UOP standard A
to ZSC/ZSO).
UOP UOP Basic Engineering P&ID depict
Transmitters as FT, TT, PT etc regardless if
Customer accepts UOP standard A
transmitter has local indication or not (option to
change to FIT, TIT, PIT etc).
22 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
Pipe size 2" and above ASME 3M/ISO 5167 (weephole effect not included) A
Meter Run (Honed Flow below 2") ASME 3M/ISO 5167 (0.75 β ratio) A
23 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
5.3.4.2 Thermocouple
Standard IEC 60584-3 A
Type: General Servbice E A
Type High Temperature K A
Element Single A
Element Grounded A
5.3.4.3 RTD
Type 3 wire PT 100 A
Curve 0.00385 ohms/ohm/°C A
Element Single Zallaf 2023-02-24: Duplex Closed A
UOP 2023-03-02: Noted.
5.3.4.4 Thermowell
Piping Installation Miniumum Size and Pressure
Rating
Minimum Size 1.5" A
Minimum Pressure Rating Class 300 A
24 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
5.3.4.5 Transition from well to thermocouple/RTD head Nipple Union Nipple, fixed head A
Type LCD A
Reading 0-100% A
Options None Zallaf 2023-02-22: Dual eng. unit Degree C and Closed A
4-20 ma
None UOP 2023-02-27: Noted. UOP will apply dual A
display of degree C and % output.
None A
Zallaf 2023-02-24: Burn out. HART, Namur 43 Closed
and 107.
UOP 2023-03-02: Noted.
25 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
None A
26 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
27 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
28 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
29 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
6.1.3 Manifold
Type
Pressure Guage (General Service) Two Valve A
Pressure Transmitter (General Service) Two Valve A
Differential Pressure Transmitter (General Service) Five Valve (Double Isolate/Equalize/Double Vent) A
Differential Pressure Transmitter (Wet Leg Level Zallaf 2023-02-24: Noted. However, to be Closed
Two Valve (No Equalization) discussed and subject to Company approval. A
Service)
Remote Mount UOP 2023-02-27: Noted.
Construction Flanged x Threaded A
Style Traditional A
Bracket Mount Attached to manifold A
Bracket Material Stainless Steel A
Direct Mount
Construction Threaded A
30 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
6.2.2 Impulse Lines Hard Pipe from Piping Isolation Valve to Instrument Zallaf 2023-02-22: SS 316L, 12 mm or 10mm A
UOP 2023-02-27: UOP standard is hard pipe
instead of tubing for pipe class 900/1500/2500.
6.3 Air Supply Piping
Isolation Valve Gate A
6.5 Tubing
6.5.1 Process
Material 316 SS A
Size 1/2” A
Construction Seamless A
Min Wall Thickness 0.049” A
Construction Seamless A
Minimum Wall Thickness 0.035” Wall A
6.5.3 Fittings
Connection (excluding Air Supply-Choose one
Threaded A
type)
Thread Standard NPT (ASME B1.20.1) A
Air Supply Connection Threaded A
Thread Standard NPT (ASME B1.20.1) A
Ferrule Double A
31 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
6.7 Sunshades
Sunshades required: Yes A
Any Instrument which cannot handle Metal
Temperature under the sun radiation 85degC,
Pressure, Level, Temperature Transmitter including Pressure, Level , Temperature B
Transmitters, Positioner, Solenoid valves, Limit
switches
Type Electric A
Method Pre-Traced Bundles A
Stainless Steel A
Instrument Enclosure Type Soft Pack A
32 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
33 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
INSTRUMENTATION SECTION
A
A
34 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
1.1.2 Temperature
Electrical Equipment Design Minimum -8°C -3°C B
Electrical Equipment Design Maximum 50°C 44°C B
Heat Tracing
Design Minimum -8°C -3°C B
Low Ambient Startup Temp 5°C Zallaf 2023-02-27: 5oC is acceptable Closed A
Design Auto-Ignition Temperature UOP 2023-02-27: Noted
(Temperature based on 80% of lowest auto T1 Minimum Auto-Ignition
A
ignition temperature of hazardous vapor or gas temperature of Hydrogen is 400°C
potentially present)
35 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
IP55 A
36 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
1.5.3 Heating A
Electric process heater Nameplate Voltage 400V AC A
Motor space heater voltage 230V, 1PH, 3W(1Ph+N+PE), 50Hz A
UOP Panel Incoming : 400/230V, 3PH, 4W(3Ph+N) Zallaf: 2023-02-24: Most panel coming without Closed
protection earth. (Clarify)
Electrical heat tracing voltage without PE, 50Hz A
Tracing Operation : 230V, 1PH, 3W(1Ph+N+PE), 50Hz UOP 2023-02-27: Noted
1.5.4 Lighting
37 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
1.5.6 UPS
Scope of Supply Client Scope A
Application Instrument Power Panel A
38 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
1.8.3 Fireproofing Extent Client's scope Zallaf 2023-02-22: By UOP for ISBL units as per Closed A
API 2218
39 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
3C x 4 sq mm (minimum size) stranded copper Zallaf 2023-02-24: Plain circular annealed Closed
conductors, XLPE insulated, PVC standard copper conductors in accordance IEC
1.10.2.1 Type A
bedded, galvanized steel wire armor with PVC jacket, UV- 60228 class 2.
resistant
UOP 2023-02-27: Noted.
Line Red A
Neutral Black A
Earth Green A
3C stranded copper conductors, XLPE insulated, PVC Zallaf 2023-02-24: Plain circular annealed Closed
standard copper conductors in accordance IEC
1.10.3.1 Type bedded, galvanized steel wire 60228 class 2. A
armor with PVC jacket, UV-resistant
UOP 2023-02-27: Noted.
3 core conductors
1.10.3.2 Number of conductors (Plus 1 neutral conductor and 1 grounding coductor, A
when required)
40 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
41 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
42 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
Stands for instrument and electrical interface Individual ground conductor routed from module
A
junction boxes for homerun cables ground system
1.13.3 Hardware
Material Galvanized Steel A
43 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
44 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
Type Momentary contact pushbutton Start-Stop UOP 2023-02-27: Emergency Stop should be A
only applied per Process Design requirement.
Control wiring Three conductor start-stop control A
Accessories - Padlockable Required on stop button A
Accessories - Ammeter Not Required Zallaf 2023-02-24: Required A
Accessories - Running Light Not Required UOP 2023-02-27: UOP suggest to apply this to A
30 kw and above.
Zallaf 2023-02-24: Required
2.5 Lighting fixtures (normal) LED A
UOP 2023-02-27: Noted for LCS only.
Electrical junction boxes for single-circuit low Exe fiberglass reinforced polyester with terminal posts
2.9 Zallaf 2023-02-24: Stainless Steel Closed A
voltage wiring (for tray cable only)
UOP 2023-02-27: Noted.
Electrical junction boxes for multiple-circuit low Exe fiberglass reinforced polyester with terminal posts Zallaf 2023-02-24: Stainless Steel Closed
2.10 A
voltage wiring (for tray cable only)
UOP 2023-02-27: Noted.
45 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom UOP 2023-02-27: Noted. Capacity 30,000BPD
ELECTRICAL SECTION
2.13 Panelboards
Zallaf 2023-02-22: metal- SS 316 or Closed
2.13.1 Panelboard Construction Fiberglass reinforced polyester enclosure manufacturer Std. A
46 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
2.13.3 Normal Lighting Panelboard On-Off Control No ON-OFF control required Zallaf 2023-02-24: Required A
UOP 2023-02-27: UOP recommends to install
the central photocell in main lighting distribution
board instead of multiple photocells on all panel
board.
47 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ELECTRICAL SECTION
48 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
49 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
50 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
51 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
52 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
53 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
54 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
55 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
a) It is a contractual requirement
b) The rated power of the driver is greater than or
equal to 1000 kW (1500 HP).
c) The shaft line has more than two machines. UOP Modular Typical Scope of Supply as Described A
d) There is a variable speed prime mover
Whenever a torsional analysis is performed, the
manufacturer shall furnish a detailed report.
56 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
1.17 Couplings
Couplings shall be of steel, non-lubricated,
laminated disc type with 300 stainless steel discs.
Couplings shall be spacer type to permit removal
of bearings, couplings, seal and/or rotor
without disturbing the driver or piping. Couplings
shall be John Crane TSK series with a protective
coating of the carbon steel components from
rusting or purchaser approved equal.
57 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
Zallaf 2023-02-20: Zallaf requested UOP to
check if API 610 is applied.
DEFAULT REQUESTS (Changes from default) REV
1.18 Coupling Guards UOP 2023-02-27: UOP will apply API 610
Coupling guards shall be furnished in accordance requirement for coupling guard only for API 610
pump.
with OSHA CRF29 1910.219 and ANSI/ASME
B15.1 and shall conform to all local, state and
federal safety regulations. Either half
covers or expanded metal covered openings shall
be provided to allow on-stream coupling
inspection.
Coupling guards shall be made of one of the UOP Modular Typical Scope of Supply as Described A
following spark-resisting materials:
58 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
59 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
60 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
1.22 Inspection
Witnessed mechanical and performance tests
shall require a written notification of a successful
preliminary test at least ten (10) working days
prior to the witnessed or observed test.
61 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
62 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
63 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
64 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
65 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
66 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
67 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
68 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
69 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
70 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
71 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
72 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
73 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
74 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
75 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
76 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
77 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
78 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
79 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
5.15 Blower
Vertical Component Mounting
jackscrews not provided as standard for
motor mounting.
80 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
81 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
6.2 Compressor
For Sundyne Maintenance
LMC compressors, maintenance is
required every 6 months for an oil change, the
bearings are designed for 25000 hours (3 years
continuous) B10 life and the expected seal life is 3
years. The service applications for these blowers
N/A A
allows for maintenance shutdowns without
stopping the process, therefore, these
maintenance intervals are acceptable.
82 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
83 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
84 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
85 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
86 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
87 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
88 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
89 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
90 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
91 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
92 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
93 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
94 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
95 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
96 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
97 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
98 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
99 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
100 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
101 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
ROTATING EQUIPMENT SECTION
102 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STATIC EQUIPMENT SECTION
2.1 Flame detection Equipment Flame Rods for forced and/or natural draft burners A
103 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STATIC EQUIPMENT SECTION
2.5 Skin thermocouples required Distillate Unionfining, and Oleflex charge heater coils UOP Basic Engineering Design Critera B
104 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STATIC EQUIPMENT SECTION
105 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STATIC EQUIPMENT SECTION
4.4 Metallurgy
For chemically treated & inhibited fresh CW service Killed Carbon Steel A
For other fresh water cooling services Admiralty materials A
For sea water or brackish water cooling services A
4.6 U-Tubes Tubeside fouling factor < 0.0004 h-m²-°C/kcal Tubeside fouling factor <= 0.00025 m²-°C/W B
Shell sidefouling factor equal or greater 0.0004 h-m²- Shell side fouling factor equal or greater
Square Pitch B
°C/kcal 0.00025 m²-°C/W
Cooling Water Block Valve Installed on inlet piping only UOP Basic Engineering Design Critera B
106 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STATIC EQUIPMENT SECTION
4.9 Reboilers
Horizontal Thermosiphon Preferred A
Vertical Thermosiphon As allowed by Process A
Stab-in As allowed by Process Zallaf 2023-02-20: UOP confirmed that Air A
Cooled Heat Exchangers will comply with
TEMA and API 661.
5.0 Air Cooled Heat Exchangers
UOP 2023-02-27: UOP will apply API 661 for air
Usage To max extent possible A
cooled heat exchanger. TEMA is not applicable
5.1 Preferred Process Outlet Temperature for air cooled heat exchanger.
°C min. above the design dry bulb temp for all air-cooled Hex 11 A
°C min. above the dgn dry bulb temp followed by WC exchangers 14 A
Air Cooled Exchanger Performance Measuring Measurement point on the combined inlet exchanger Provide one temperature measurement point for:
5.3 B
Equipment service Inlet and outlet for each bundle
107 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
STATIC EQUIPMENT SECTION
108 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
PIPING SECTION
1.0 General
1.1 Design Code ASME B31.3 A
109 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
PIPING SECTION
6.0 Insulation
6.1 Design and Installation UOP / PIP Standards A
7.0 Paint
7.1 Insulated < 200c 2 layers of Epoxy Phenolic A
High temp resistant inorganic Copolymer or
Insulated 200c up to 650c A
Multipolymer
Top coat Color Mfg Std. A
Film thickness Per UOP spec A
110 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
PIPING SECTION
7.2 Not insulated < 120 C 3 layers of Inorganic Zinc, mastic and Polyurethane A
Not insulated 120 to 175 C 3 Layers of 2 Epoxy Phenolic and Silicone Acrylic A
Top coat Color for Not Insulated Customer to specify A
Film thk Per UOP spec A
9.0 Bolt and Nut Coating (except for stainless steel bolting) Fluorokote coating A
111 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
PIPING SECTION
10.0 Pressure Relief Valves
112 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
PIPING SECTION
113 / 114
Date 2023-01-27 Modular Design Questionnaire 9072962-MODQ-B
Client/Owner ZALLAF
Project Name Zallaf South Refinery
Location Murzuq, Libya
Unit NHT, Par-Isom Capacity 30,000BPD
PIPING SECTION
114 / 114