Professional Documents
Culture Documents
Plumbing and Electrical P1
Plumbing and Electrical P1
LAV LAVATORY
ALL HOUSE SEWER SHALL BE CONNECTED TO THE SEPTIC
4 VAULT, DRAINAGE DISCHARGE FROM DOWNSPOUT FD FLOOR DRAIN
CONDUCTOR AND SURFACE WATER SHALL BE CONNECTED TO
THE CEMENT DRAINAGE PIPE OR PVC PIPE AND PROVIDED CO CLEAN OUT
WITH THE NECESSARY CATCH BASIN AND CONNECTED TO THE
MAIN SEWER. KS KITCHEN SINK
GV GATE VALVE
THERE SHOULD BE NO SUBSTITUTION OF ANY MATERIAL OR
5 FIXTURES WITHOUT THE APPROVAL OF THE SANITARY HB HOSE BIBB
ENGINEER OR ARCHITECT IN-CHARGE
PROJECT TITLE: DRAWN BY : PRC NO. SUBMITTED TO : CLIENT: SHEET CONTENT : SHEET NO :
PLUMBING NOTES
P
LOCATION: NEW CORELLA, DAVAO DEL NORTE BSCE 5-A ISSUED AT: CIVIL ENGINEER
ADDRESS: TAGUM CITY 1