MRM Construction AHP Boq For Factory Inner Toilet 1 SL No Description Bottom LVL Top LVL Nos Nos L Foundation Work
MRM Construction AHP Boq For Factory Inner Toilet 1 SL No Description Bottom LVL Top LVL Nos Nos L Foundation Work
AHP
BOQ FOR FACTORY INNER TOILET 1
SL No Description Bottom Lvl Top Lvl Nos Nos L
FOUNDATION WORK
1 Pile Boring
P1 1 138
P2 1 38
176
Total
Total
BASEMENT
1 Plinth Beam Excavation
Grid (A/1-15) 1 1 104.600
Grid (A-L/15) 1 1 71.300
Grid (L/1-15) 1 1 104.600
Grid (L-A/1) 1 1 71.300
Grid (J/1-3) 1 1 15.200
Grid (L-G/3) 1 1 27.635
Grid (L-K/12,14) 1 2 6.665
Grid (G,F,E/1-15) 1 3 104.600
Total
Total
Total
Total
Total
6 Pedestal
PD1 (375x750) 1 8 0.375
PD2 (675x750) 1 1 0.675
PD3 (838x375) 1 11 0.838
PD4 (750x838) 1 2 0.750
PD5 (855x1600) 1 2 0.855
PD6 (914x1600) 1 2 0.914
PD7 (762x1600) 1 13 0.762
PD8 (525x838) 1 13 0.525
PD9 (457x838) 1 2 0.457
PD10 (762x1066) 1 2 0.762
PD11 (750x1600) 1 13 0.750
PD12 (525x600) 1 10 0.525
PD13(525x1066) 1 2 0.525
PD14 (686x1066) 1 2 0.686
PD15 (686x914) 1 2 0.686
PD16 (610x762) 1 3 0.610
88
Total
Groove Cutting
Main Building 1 1 104.000
Total
Reinforcement steel
SUB TOTAL
SUB TOTAL
Total
Total
vi) Pedestal
PD1 (375x750) 1 8 0.375
PD2 (675x750) 1 1 0.675
PD3 (838x375) 1 11 0.838
PD4 (750x838) 1 2 0.750
PD5 (855x1600) 1 2 0.855
PD6 (914x1600) 1 2 0.914
PD7 (762x1600) 1 13 0.762
PD8 (525x838) 1 13 0.525
PD9 (457x838) 1 2 0.457
PD10 (762x1066) 1 2 0.762
PD11 (750x1600) 1 13 0.750
PD12 (525x600) 1 10 0.525
PD13(525x1066) 1 2 0.525
PD14 (686x1066) 1 2 0.686
PD15 (686x914) 1 2 0.686
PD16 (610x762) 1 3 0.610
88
9.00 1242.00
9.00 342.00
1584.00 RMT
5195.52 RFT
9.00 243.74
9.00 96.65
340.39 Cum
12020.59 Cft
138.00
38.00
176.00 Nos
88.00 NOS
7000 Sqm
75320 SQFT
72.380 3763.76
12345.1328 RFT
7000 Sqm
75320 Sqft
MT