Professional Documents
Culture Documents
R901084003P00
R901084003P00
N
AWAY AWAY
CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911
2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).
1 PIPE , CS API 5L-B-PSL2 , SMLS , BE , 12 PPPCPVSMBESTD5F 8.2 M 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.
STD , B36.10M , FBE INT COATED 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.
(B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.
7. PIPING MATERIAL IS
2 TEE , CS A234-WPB , SMLS , BE , STD , 12X12 PTEC34SMBESTDE5 1
B16.9 , FBE INT COATED PIPE SIZE SCHEDULE SPECIFICATION
3 90 LR ELBOW , CS A234-WPB , SMLS , BE , 12 P9LC34SMBESTDE5 1 REFER MTO REFER MTO REFER MTO
5 WN FLG , CS A105N , CL150 , FF , STD , 12 PFWC1B15FFSTD5V 9 9. TESTING SHOP HYDROSTATIC TEST - YES
THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS
NO
10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
SAES-L-105 CLASS 1LE0U . ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.
PT N.B. 15. FOR INTERNAL LINED PIPE, LINING SHALL BE DONE AFTER SPOOL FABRICATION & COMPLETION OF ALL HOT WORKS.
16. TIE-IN POINTS CO-ORDINATES TO BE VERIFIED BY CONTRACTOR IN FIELD.
NO DESCRIPTION (INS) STOCK CODE QTY 17. PAINTING / COATING SHALL BE IN ACCORDANCE WITH SAES-H-001/002 AND PROJECT APPROVED COATING MAP.
18. SEAL WELDING REQUIREMENT OF THREADED JOINTS SHALL BE AS PER CL.NO.9 OF SAES-L-110.
19. WELDS SHALL BE RADIOGRAPHED AS PER SAES-W-012 (FOR LINES WITH DESIGN CODE ASME B31.8/B31.4) &
FITTINGS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
AS PER SAES-W-011 (FOR LINES WITH DESIGN CODE ASME B31.3).
20. CONSTRUCTION OF PLANT PIPING SHALL BE IN ACCORDANCE WITH SAES-L-350.
6 FIG-8 BLANK , CS A516-70 , CL150 , FF , 12 PK8C7G15FF000IX 1 21. ALL INTERFACE CONNECTIONS WITH OTHER PROJECT (WHEREVER APPLICABLE), CO-ORDINATES AND ELEVATIONS
SHALL BE VERIFIED BY CONTRACTOR IN FIELD.
FLG5 GAS7 BLT8 FBE INT COATED PROJ STD DRG , NO
22. INTERNAL FBE LINING CONTRACTOR TO VERIFY AND CONFIRM THE BREAK UP FLANGES PRIOR TO THE SPOOL FABRICATION
FLG5 GAS7 BLT8 23. PLANT COORDINATE SYSTEM HAS BEEN FOLLOWED AS PART OF BI-10-00930.
AD-036633 (FOR SIZES 2" & ABOVE) HIGH POINT OF PLANT DATUM ELEVATION 100.000m WHICH EQUALS 2.05m ABOVE MEAN SEA LEVEL
12"N.B.
FLG5 GAS7 BLT8 0 FOR CONT. SEE SPOOLS TO BE FABRICATED BY VENDOR
57 SHT 002 GASKETS
NO.
PIECES
MARK NO. SIZE
WEIGHT
LBS
NO.
PIECES
MARK NO. SIZE
WEIGHT
LBS
1875 85 356 E 30363930
3 8
7 GASKET , SYNTHETIC W/ CENTERING RING , 12 PGGNSC20115BL02 6
S10 N 30307363
FLG5 GAS7 BLT8 38 FULL FACE , 1/16" (1.6 MM) THK ,
191 GL01-12 44 19 EL +101298 CL150 , B16.5 , B16.21
7 254 9
4 36
6 STEM UP BOLTS
EL +102347 1 5
12"N.B. 303 8 STUD BOLT (CONT) , CR-MO A193-B7 , W/ 2 7/8 PB1BLCSACS16002 60
FLG5 37 1 REST REST SF HVY HEX NUTS , A194-2H , B1.1 ,
31
303 50 CERAMIC-FLUOROPOLYMER COATED , DIA
18 FLG5
11 GAS7 (IMP) X LEN (MET) - 115 mm Length
79 FLG5 SPOOLS TO BE FABRICATED BY SAUDI ARAMCO
2 6
7 NO.
MARK NO. SIZE
NO.
MARK NO. SIZE
REVISION VALIDATION
10-00930-0002-001
ENGG./DATE
(DESIGN AGENCY)
CERTIFIED BY/DATE
REVIEW FOR KEY DRAWINGS
REQUIRED
CONST. AGENCY/DATE
(SAUDI ARAMCO)
OPERATIONS/DATE BY/DATE
OTHER
NO 150 55 120 0.07-13.7 NOTE-12 WATER NOTE-19 NOTE-19 0 mm NO NOTE-17 SYS-02 OW-5062
060 L RB-901084 003 00
Saudi Aramco 2825 ENG. (05/05)
RESTRICTED
SA-TR-799 SMART CADD-03