10th Edition Logistics Conference

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

10th edition logistics conference

1)Tuty collector Mr Senthiraj speech- airport expansion, sipcot development regarding


2)Next tveli collector Mr  Vishnu speech about the projects of gangaikondan and food parks in
tveli and Thrichy
3) Mr Davidraja given the theme of CII logistics
Voc port emerging hub & sea of possibilities
4) Mr Sankar vanavarayan
5) chairman of JM baxi Mr.Thrup kotak
6) chilairnan of voc port TK Ramachandran
Talking about JM Baxi l, green port, outer harbour project, solar energy and hybrid
implementation, future industrial development, desalination plant,
Integrated logistics and improvement of port year by year.
7) Vote of thanks .
          2nd session
1) BSLV chairman Mr Srikanth
15 years in field, today's development of container movements
2) Vimalkumar Jha DC voc port
Talking about the voc port facilities and smart traffic system. NCB 3 for bulk cargo handling,
vessel size increasing, digitlies logistics, coastal and inland water transport, NLPM (national
logistics portal marine)
3) Jayanth Thomas sr.GM Chackiat
What's new? The changes happened, happening and will happen. Standardization of customs
procedures, encourage RMS,
Process automation,
Way forward- trend follower, trend adapter, trend setter
4) Mr. Prabhakar voc port traffic manager
Described about capacities of port and various handling areas
5) Mr. Senthilkumar CEO dbgt
Described fecilities of terminal
6) Mr Ramesh Transworld
7) Mr Arun Sankar psts- Thanks

STACK YARD voc port


7.50 Ha
Why VOC Port
• Strategically located close
to the East-West 14 CFS


International sea-route
15 Containers Freight
Stations, one ICD and DPE
facility located in close
proximity to the port
Connected
Our sea, rail and road connectivity
meeting your cargo needs for
better logistics efficiency.
• Seamless and congestion free NH
roads connect the Port through
NH-38 and NH-138
Convenient
All weather Port with
24x7 Berthing
• Exclusive Truck Parking Facility
with all amenities
• Single Window e-Business for
Exim Trade
Caliber
Competent
To handle 69.30 Million Tonnes
Cargo per year
To handle vessels with maximum
draft of 14.20 metres
To handle vessels with maximum
beam of 48 Metres and LOA of
310 Metres.
Committed
To handle any dimension of cargo
To transform the Port as
Transhipment hub of South India
To be the gateway investment
destination for Port based
industries
Bulk Cargo Discharge Rate of more than 57,000 Tonnes / Day through Harbour Mobile Cranes
& Mechanised
conveyor system
• 30+ Container Moves/Hour at Par with global standards
• Highly-skilled workforce with vast experience in handling diverse cargo types
Layout
SECOND COAL CONVEYOR (TTPS)
JETTY I
D-13.0 M
QL-
L-301 Mts
UPGRADED CO
OIL JETTY
D-13.0 Mts
QL-150 Mits
COAL JETTY
0-14.0 M
OL-313
EASTERN ARM
QL-140 Mts
-7.4 Mts
153 mm
Port in figures
Cargo Handling Capacity: 69.30 Million Metric Tonnes per
Annum
Container Handling Capacity: 1.17 Million TEUS per Annum
Traffic handled during the FY 2021-22:34.12 Million Tonnes
Container Traffic Handled during the FY 2021-22: 7.81 lakh
TEUS
Cargo Transit mode: Road 74%, Conveyor 22%, Pipeline 1%,
Rail 3%
Tidal variation: 1.07 Metres
Bulk Cargo Handling Facilities
3 Harbour Mobile Cranes, 124 Tonne Capacity
3 Grab Cranes,20 Tonnes capacity
1 Hook Crane, 10 Tonne capacity,
1 Hook Crane, 6 Tonne capacity,
❖ 8 Mobile Hoppers, 100 Tonne capacity.
Container Handling Facilities
Weekly main line connectivity to Far East
Daily Colombo connectivity-10 Hours
*Upto 85% Vessel Related Charges concession for Mother Vessels
15 CFSs & 1 ICD in Port vicinity
30-Container Moves/Hour at Par with global standards
14.20m draft, capable of handling 8000 TEUS size vessels
DPD, DPE facilitating least dwell time for containers
* 24x7, DPE facility of 18,000 TEUS Capacity
Pan India, least containers dwell time (21 Hrs for Imports, 60 Hrs for
Exports)
→ Digital Process Control Mechanism for filing EGM in ICEGATE
COOLING WATER CHANNEL!
COOLING WATER CHANNELS
STORAGE YARD
49 Ha
NORTH BREAK WATER 4086m length
APPROACH ROAD TO NCS TO NCD-a
NCB-
NCB-1
L-306 M
D-1
0-14.0 Mts
Mts
QL-306 Mts
BERT
-9
QL-3
L-334.5 Mts
-306 Mts
BERTH-8 (DBGT-Terminal)
D-14.2 Mts
QL-345 Mts
SOUTH BREAK WATER 2730m length
RAILWAY LINE
10 Ha
BERTH 7(PSA-Terminal)
0-1
Mts
ADDITIONAL BERTH
Mts
EASTERN BREAK WATER 1138m length
Container Berths
Quay Crane (Nos.)
PSA-SICAL
3
DBGT
3
Total Capacity (TEUs)
4,17,000
6,00,000
Quay Length (M)
370
345
Draft (M)
11.70
14.20
Area (Ha)
10
10
Reefer Points (Nos.)
84
112

You might also like