Utility Building : DDC 7@ Groung Floor

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

PROJECT:

List Title: OUTPUT INPUT


DO AO AI

START/STOP ‐ ON/OFF

Co2, TEMPERATURE &

OPEN / CLOSE STATUS


SPEED COMMAND

FEEDBACK SIGNAL
TEMPERATURE &
TEMPERATURE
MODULATING
OPEN / CLOSE
Utility Building ‐

COMMAND
COMMAND

COMMAND

HUMIDITY

HUMIDITY
HUMIDITY
PRESSURE
DDC‐7@ Groung floor

NO. DESCRIPTION QTY ENABLE 0‐10VDC N1KΩ 0‐10VDC

A Exhuast Fans 11
1 Exhaust Fan Motor 11

2 Air Flow Switch 11

B Temp. Sensor 1
1 Temp. Sensor Reading 1

C Water Leak Detector 3


1 Water Leak Detector 3

D FACP 1

1 FACP 1

2 Software Integration 1 Software Integration Through BACnet/IP

E DGP_CPM Chiller 1
1 DGP_CPM Chiller 1 Fully Integrated to BMS System through BACnet/MSTP Protocol

F MODULAR CONTROLLER 1
1 MDP Power Meters, RMU 16

G Transformers 8
1 Transformer General Alarm 8

2 Transformer General Status 8

3 Transformer Stage # 1 Temp. Alarm 8

4 Transformer Stage # 2 Temp. Alarm 8

1 Software Integration 8 Fully Integrated to BMS System through Mod‐Bus Protocol


MODULAR CONTROLLER

SPARE POINTS
(20%)

POINTS SUMM
ARY

MODULE SUM
MARY

MOD
ULE T
ol
col
egration Through BACnet/IP
RUN / STOP ‐ ON / OFF
STATUS INPUT

TRIP, FAULT / NORMAL


STATUS

FLOW STATUS

DIRTY / CLEAN FILTER


STATUS
DI

STATUS (VFC) SMOKE / FIRE ALARM


REF.:

AUTO / MANUAL STATUS

PRESSURE STATUS

GENERAL STATUS

GENERAL ALARM
REV.

FIELD DEVICES

TOTAL # OF I/O DATA POINTS


DATE

NOTES
ENG

You might also like